Advancing research excellence for governance and public policy in Africa PASGR Working Paper 018 Urban Governance and Turning African CiƟes Around: Luanda Case Study Croese, Sylvia University of Cape Town August, 2016 This report was produced in the context of a mul‐country study on the ‘Urban Governance and Turning African Cies Around ’, generously supported by the UK Department for Internaonal Development (DFID) through the Partnership for African Social and Governance Research (PASGR). The views herein are those of the authors and do not necessarily represent those held by PASGR or DFID. Author contact informaƟon: Sylvia Croese University of Cape Town [email protected] Suggested citaƟon: Croese, S. (2016). Urban Governance and Turning African CiƟes Around: Luanda Case Study. Partnership for African Social and Governance Research Working Paper No. 018, Nairobi, Kenya. Acknowledgements: I would like to acknowledge the research assistance for this study from João Francisco Pinto Domingos, head of the urban governance unit of Development Workshop Angola, and the support of its director, Allan Cain, and the head of its research unit, José Cato. I also thank Cláudia Conceição Luvau and architect Manuel Pimentel, the Director of the Naonal Instute for Spaal Planning and Urban Development, and architect Helder José, the Director of the Instute of Planning and Urban Management of Luanda at the me of research, for parcipang in and supporng the research process. This working paper benefited from the comments of Professor Edgar Pieterse, the principal invesgator of the PASGR research project ‘Urban governance and turning African cies around’; the expert review panel put together by PASGR, comprising Dr. Danielle Resnick, Dr. Franklin Obeng‐Odoom, Prof. Seth Kaplan and Dr. Awino Okech, who parcipated in the project’s incepon and/or research findings work‐ shops in Nairobi in May and November 2015; and the two anonymous reviewers. ©Partnership for African Social & Governance Research, 2016 Nairobi, Kenya [email protected] www.pasgr.org ISBN 978‐9966‐087‐14‐0 Contents Acronyms ................................................................................................................................. ii Abstract ................................................................................................................................... iii 1. Introduction ....................................................................................................................... 1 2. Analytical framework, research questions and methodology ........................................... 1 3. Luanda’s history ............................................................................................................... 3 4. Luanda as a ‘turn-around’ city ..........................................................................................4 5. Luanda’s flagship projects ..............................................................................................11 5.1 The Bay of Luanda ................................................................................................11 5.2 The New City of Kilamba .......................................................................................16 6. Conclusion ...................................................................................................................... 22 References .............................................................................................................................24 List of tables Table 1: Categories for analysis of the case studies .............................................................. 2 Table 2: Selected flagship projects in Luanda ........................................................................ 9 Table 3: GRN contracts for urban and new city development .............................................. 18 List of figures Figure 1: Angolan state budget, 2003–2016………………………………………………………6 Figure 2: Angolan public investment, 2003–2010………………………………………………..7 Figure 3: Top recipients of Angolan public investment, 2003–2010……………………………8 Figure 4: Luanda province before and after the new politico-administrative division of 2011……………………………………………………………………………………….10 List of images Image 1: Postcard of Luanda featuring the Bay of Luanda………………………………….12 Image 2: Redeveloped Bay of Luanda ............................................................................ 14 Image 3–6: Bay of Luanda in 2015 ..................................................................................... 15 Image 7: Artist impression of initial design for Kilamba………………...…………...……...19 Image 8–10: Kilamba in 2015………………………………………………………………...……20 i Acronyms ANIP National Private Investment Agency APIMA Angolan Association of Real Estate Professionals CITIC China International Trust and Investment Corporation CIF China International Fund DW Development Workshop FFH National Housing Fund GOE Office of Special Works GRN Office of National Reconstruction GTRUCS Technical Office for the Urban Requalification of Cazenga and Sambizanga IMF International Monetary Fund IPGUL Urban Planning and Management Institute for Luanda MPLA Popular Movement for the Liberation of Angola SBL Bay of Luanda Corporation UCAN Catholic University of Angola UNITA National Union for the Total Independence of Angola ii Abstract This working paper presents the findings of the study on the process that has taken place over the past decade to turn around the city of Luanda, the capital of Angola. It is part of a broader research project that examines the case of Luanda, alongside Johannesburg and Lagos, to shed light on the governance practices that have started to emerge on the continent in an era that has been marked by rapid economic growth. Luanda has been the main beneficiary of Angola’s economic boom that started in 2002 fuelled by oil revenue. Two projects were undertaken as part of efforts to turn the city around: the redevelopment of the Bay of Luanda and the construction of the New City of Kilamba. The Bay of Luanda work included the redevelopment of the waterfront to create pedestrian spaces, cycle lanes, sports fields and spaces for cultural events, while the New City of Kilamba consisted of the construction of 710 buildings, kindergartens and schools, along with water and electricity infrastructure. Both projects have benefited many people as measured by the high use of the waterfront and the occupation of Kilamba homes. Their symbolic value as a part of efforts to project Luanda as a world-class city is also considerable. The central government’s control over the execution of the projects allowed their rapid completion, but this stifled accountability and affected the ability of local administrations to manage them or adequately respond to citizen needs. A more integrated, decentralised and participatory approach to the management of urban and economic growth will have to be a central theme in Luanda’s governance if the city’s turn-around is to become more inclusive and adaptive in the long term. Key words: Turn-around city, Luanda, Bay of Luanda, New City of Kilamba, world class iii 1. Introduction This working paper presents the findings of the study on the process to turn around the city of Luanda, the capital of Angola.1 Decades of civil war that followed the country’s independence in 1975 saw millions of people internally displaced, large areas mined and most of the country’s physical, economic and social infrastructure and services destroyed or degraded. Although most of the conflict took place in the countryside, the impact was felt in Luanda, the main recipient of the massive influx of displaced people seeking safety. The failure to invest in the infrastructure needed to handle this influx resulted in the severe degradation of the city’s urban core and the growth of sprawling slums. Since the war ended in 2002, Angola has experienced unprecedented economic growth fuelled by the doubling of its oil production between 2002 and 2008 in a context of rising global oil prices. This growth has been concentrated in Luanda, which during the first decade after the war benefited from significant capital investment as part of the government’s reconstruction programme. This transformed the city’s landscape, and the goal was to change its image from a war-torn and degraded city in need of saving2 into “the country’s postcard to the world, a vibrant and modern metropolis full of opportunities, and a symbol of post-war peace, prosperity and development in the new Angola” (Schubert, 2015). Although it occupies only 1.5 percent of the Angolan territory, Luanda now generates two-thirds of the GDP and, with almost 7 million inhabitants, is home to over a third of the population. A number of flagship projects illustrate Luanda’s turn-around process, which, as in other cities such as Johannesburg and Lagos, includes large infrastructural projects, legal and institutional reforms and the hosting of international events to attract investment to the city. In the post-war context of Angola, the projects also serve an important political agenda of proving the government’s state-building capacity to international and domestic audiences, thereby securing legitimacy and stability. The execution and management of the flagship projects have, therefore, been marked with a significant degree of central government control. 2. Analytical framework, research questions and methodology This study is part of a broader research project examining three cities – Johannesburg, Lagos, Luanda – that are
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages33 Page
-
File Size-