Study on Improving the Accessibility & Mobility Of

Study on Improving the Accessibility & Mobility Of

STUDY ON IMPROVING THE ACCESSIBILITY & MOBILITY OF THE HIGHWAY NETWORK IN UVA PROVINCE Amal S. Kumarage October 2000 Urban Centres 30 Urban Centres Only 1st Order Centre Badulla 2nd Order Centres – Bandarawela, Moneragala, Kataragama Most higher order cities on major roads TransPlan Traffic Flows Mahiy angana Link F low (vpd) 23 - 500 500 - 1000 1000 - 2500 Bibile Badulla W elim ada Moneragala Bandarawela From C olom bio W ellawaya Udaw alawe Tanam alwila Kataragama N So urce : TransP lan Data ba se , U nive rsity o f M oratuwa Travel Speed Link Speed (k m/hr.) 15 - 30 30 - 45 N 45 - 60 Mah iyang an a From K an dy Bibile To Am pa rai Bad ulla From N 'Eliya To Ba ttica lo a W elima da Mon erag ala Ban dara we la From C o lo mb o W ellaw aya Ud aw alaw e Ta na ma lw ila Kata raga ma So urce: Tra nsP la n D tab ase, Transp ortatio n E ng in eering Division, Un iversity of Mo ratu wa Directness From Straight Line Minimum Road Directness Colombo to Distance Distance (kms) Factor (kms) Galle 105 116 110% Ratnapura 60 101 168% Kandy 95 116 122% Kurunegala 85 93 110% Anuradhapura 165 206 125% Jaffna 290 396 137% Batticaloa 220 303 138% Nuwara Eliya 100 180 180% Welimada 115 210 183% Badulla 130 230 177% Moneragala 165 254 154% Mahiyangana 130 185 142% Gradients & Elevation ISSUES & STRATEGIES Issues, Constraints & Strategies Internal road system not a critical constraint All major roads leading out of province have adequate capacity Travel speeds poor on both rail and road connections with Colombo & Kandy Poor directness in travel on major roads Issues, Constraints & Strategies Unable to make optimum use of Mahaweli roads Unable to take advantage of Dambulla SEC Uva poorly connected to tourist areas & routes Poor access to places of tourist interest within Uva RECOMMENDATION & PROPOSALS Proposal #2: New Road Axis: Kandy-Badulla New Road of 40 kms between Haliella to join with New Kandy Mahiyangana Road near Randenigala New Link of 8 kms (Kottegoda- Halaba/ Hathkinda) for Vegetables from Welimada & Uva Paranagama to Kandy & Dambulla Restoration of Historical Royal Route (including Bogoda Bridge) Public Support and Provincial Initiatives Badulla-Kandy, Welimada-Kandy and B’Wela- Kandy travel time reduced to 2- 2.5 hrs (distance also reduced to 100 kms). Can join with project roads for Uma Oya Project Proposal #2: New Road Axis: Kandy-Badulla New Road of 40 kms between Haliella to join with New Kandy Mahiyangana Road near Randenigala New Link of 8 kms (Kottegoda- Halaba/ Hathkinda) for Vegetables from Welimada & Uva Paranagama to Kandy & Dambulla Restoration of Historical Royal Route (including Bogoda Bridge) Public Support and Provincial Initiatives Badulla-Kandy, Welimada-Kandy and B’Wela- Kandy travel time reduced to 2- 2.5 hrs. Can join with project roads for Uma Oya Project Costs The feasibility study stage is anticipated to cost around Rs 5 mn, the design stage a further Rs 5 mn. Construction of approximately 50 kms is estimated at between Rs. 1,000 to 1,500 million. Proposal #3: Development of Tourist Route Restoration of Royal Route (King Dutugemunu’s Route) Tissamaharama (Yala) -Kataragama- Buttala (Maligawila)- Badalkumbura- Medagama (Inginiyagala Nat. Park)- Bibile - Mahiyangana - (Wasgomuwa Nat. Park) - Polonnaruwa Distance 255 kms Travel Time 5.5 hours The cost of these would not exceed Rs. 50 million. Developing Tourist Routes – Raja Mawatha, Uva Polonnaruwa Maduru Oya NP Mahiyangana Wasgomuwa National Park Kataragama Buttala/Mali gawila Tissamaharama/Yala Proposal #5: Mobility to Colombo With Proposed New Colombo-Kandy Road and Proposed Badulla-Kandy Link total travel time from Badulla to Colombo will be 4 to 4.5 hours Investigate Proposed Kottawa-Ratnapura Road (SE Highway) & Link with Proposed Naketiya By-Pass New Road to Colombo Kottawa- Ingiriya- Ratnapura- Opanayake- Koslanda- Diyagala Maximum elevation 500 metres No up/down gradients (Distance 135 kms; Travel time 2 hours) + 1 hour to Bandarawela, Badulla and Moneragala Cost Rs 15,000 mn Proposal #6 Prescription as Protected Drives Develop viewing turn outs Divert other through traffic (e.g. trucks) Frequent Sign posting Building Restrictions Cost Rs 22 million Protected Highways Ella-Wellawaya Beragala- Bandarawela Ella - Namunukula Bandawela - Poonagala Poonagala - Koslanda Boralanda - Ohiya Boragas - Hakgala Haputale - Dambetenna Passara - Madolsima - Mitigahatenne Welimada - Kirklees - Uda Pusellawa .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us