Corrigendum 1

Corrigendum 1

NEEPCO **" ****" NORTH EASTERN ELECTRIC POWER CORPORATIONLTD. (A GOVI OF INDIA ENTERPRISE) OHSAS 1800 1 Oice ot the lead ot P'nect Wah mmam Stage-1Il IEP Formerly known as Mawphu I P Stage-11 (8 MW East Khasi Hills Distret. Meghalaya, Mawsynram-793113 -mail [email protected] cORRIGENDUM NO. 01 DATED 20.01.2021 To NIT No. 08/2021, Dated. 19/01/2021 Name of Work: Cleaning, sweeping, mopping including cooking and other kitchen works of Transit Camp at Thieddieng village under Wah Umiam Stage-I HEP, East Khasi Hills District, Meghalaya The corrigendum to the Annexure-C of the detailed Tender document of the aforesaid NIT No.08/2021 may be read as attached. All other terms and conditions of the Bid Document will remain unchanged. (P. Suchiang) Sr. Manager (Civil) O/o the Head of Project, Wah Umiam Stage-ll HEP Mawsynram, Meghalaya Memo No. NEEPCO/HoP/S&1/Wah Umiam/T-21/2020-21/296-H01 Dtd. 20/01/2021 Copy to: 1. The Chief General Manager (C) Ve s&l, NEEPCO, Guwahati for favour of kind information please. 2. The Chief General Manager (Fin), Shillong, for favour of kind information please. 3. The General Manager (T), Shillong. for kind information please. He is requested to kindly upload the Corigendum in NEEPCO website. Soft copy of the Corrigendum is mailed to [email protected] 4. The Nodal oficer, CPP portal of NEEPCO, C&P, Shillong for information please. He is requested to upload the Corrigendum in the CPP portal. 5. The Dy. General Manager (Fin), Bills, Shillong, for information and necessary action please. 6. Notice Board. Sr. Manager (C) O/0 HOP, Wah Umiam Stage-IIl HEP Mawsynram Registered Office Brook Land Compound. Lower New Colony. Shillong- 793 003 Website www.neepcoco in CIN U4010ML1976GOI001658 Annexure-C Wah Umiam Stage-1l1 HEP, Mawsynram, Meghalaya Schedule of Rate: Ivpe of Work: Cleaning. sweeping, mopping including cooking and other kitchen works of Transit Camp at Thieddieng village under Wah Umiam Stage-1I HEP, East Khasi Hills District, Meghalaya Item Particulars of Item Unit Q Rate Amount in Amountin No /Month Figure words 1 Cleaning. sweeping. Month 12 mopping including cooking and other kitchen works of Transit Camp at Thieddieng village under Wah Umiam Stage-11 HEP. East Khasi Hills District, Meghalaya Note workers as not be less than the latest Rates of for industrial . The Labour rate quoted shall Wages of Labour & Employment. specified by the Chief Labour Commissioner., Ministry GOI Page 12 of14 Break-up of Monthly Rate Unit 1 month Name of Work: Cleaning, sweeping, mopping including cooking and other kitchen works of transit camp at Thieddieng village under Wah Umiam Stage-lll HEP SI. Labour Item No. of labourer No. Rate Amount (Rs.) Remarks (per day) A Labour 1. Considering the quantum of Cleaning, sweeping, mopping work, 1 skilled and 1 unskilled labour shall be taken for including cooking and other works of transit camp at Thieddiengkitchen1 (skilled) calculating the monthly rate. 1village underWah Umiam Stage-1l1 HEP 2. Available working days in a month is considered as 26 days. 1 (unskilled) 3. Labour Rate shall be A Sub-Total considered as per Circular of B Add 12.68% as Employers PF Contribution on A Ministry of Labour & Employment, Office of the Chief Employees State Insurance (ESI) for labourers to be engaged by the C Labour Commissioner (C), Govt. contractor @4.75 %on A Of India, New Delhi, Circular D Add Contractor profit on A Dated.12/10/2020 andis E Sub-Total (A+B+C+D) Subjected to change from time to FAdd GST (18% on E) time as per the rates published by the office of the Chief Labour Total (E+F) Commissioner, GOI. Any change x 26 days Rate of work per month Rs. in the rate shall be paid/adjusted. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us