At1480 14-1 Faie 7UTATE ,Fear 12/2020

At1480 14-1 Faie 7UTATE ,Fear 12/2020

aT1480 14-1 faiE 7UTATE ,fear12/2020 TTYE NTE varT-4-afra Tf (gHoslo34TRO--110)adt Tet uv foto o-27 (7 Fi0-26.810 28.850) H ITH dgz THT i0-573 HTT TEiforaa iuto foo, ¥gT ETRT TaT Rea 3TGETE TT5 AT5-8/t./06/149/2020/tORo/1042 fias 25.11.2020, TAT-11I-1162 /FP/UP/Approach/49540/2020 fei 27.11.2020 T yea aa vive7, argr HUS, 7 1741/14-1 RAs 03.12.2020 S. cONDITIONS N. REPLY/UNDERTAKINGS 1 The status of the legal forest land shall As per compliance 1, Bharat Petroleum Corporation remain unchanged. Ltd, Territory Mathura hereby undertakes that as per Forest (Protection) Act, 1980 legal status of the land will not be changed 2 afforestation Compensatory shall be taken up by | As per 2, Bharat Petroleum the Forest Department for plantation of 100 trees compliance corporation Limited, Territory Mathura hereby undertakes that in (Pathramai Forest Block, Kaimganj Range, the cost incurred in plantation of 100 trees the District- farrukhabad) at the cost of user agency. by As far as practicable a mixture of local indigenous Forest Department has been submitted to the Forest species will be planted and monoculture of a department by the BPCL. species has to be avoided. 3 The Cost of afforestation at Compensatory the | As per compliance 3, Bharat Petroleum prevailing wage rates as Corporation per compensatory Limited, Territory Mathura affprestation scheme and the cost of hereby undertakes that survey, the cost of demarcation and of compensatory afforestation at the erection permanent pillars it required on the CA land shall be deposited in prevailing Wwage rates as per compensatory afforestation has advance with the Forest Department by the been submitted to CAMPA Fund by the BPCL project authority. The CA will be maintained for and challan copy for the same has been 10 years. The scheme may include appropriate attached. provision for anticipated cost increase for works scheduled for subsequent years. 4 he State Government shall charge the Net As per compliance 4. Bharat Petroleum Corporation Present Value (NPV) for the 0.085908 ha Forest Limited, has been submitted the payment for the Net area to be diverted under this proposal from the Present Value (NPV) of the diverted forest land at the user agency as per the orders of the Hon'ble rates approved by the ministry and challan Copy receipt Supreme Court of India dated 30/10/2002. for the same has been attached. 01/08/2003. 28/03/2008. 24/04/2008 and 09/05/2008 in IA No. 566 in WP O No. 202/1995 and as per guidelines issued by the Ministry vide letters No. 5/1/1998-FC (Pt.I) dated 18/09/2003 as well as letter No. 5-2/2006-FC dated 03/10/2006 and 5-3/2007 FC dated 05/02/2009 in this regards. Additional amount of the NVP of the diverted As per compliance 5, Bharat Petroleum Corporation forest land, due after if any, becoming finalization Limited, Territory Mathura hereby undertakes that of the same by the Hon'ble Supreme Court of the addititional amount of the npv of the diverted forest land India on receipt of the report from the Expert , if any ,becoming due after finalzation of the same by the Committee, shall be charged by State Hon'ble Supreme Court of India on recept of the report Government from the User The User from te Agency. expert of will be paid to the State Agency shallfurnish an undertaking to this effect. committee, 5-1 Government by the BPCL Greenery will be maintained by user around As per compliance 5-1, Bharat Petroleum Corporation Periphery of petro pump. Limited, Territory Mathura hereby undertakes that greenery will be maintained by BPCL around Periphery of petrol pump. 6 User shall use the land betbeen and As Agency entry per compliance 6, Bharat Petroleum Corporation exit of petrol pump for and plantation Limited, Territory Mathura hereby it will conservation of trees undértakes that the same shall be use the land between entry and exit of petrol pump for demarcated by 2 feet wall. plantation and conservation of trees the same will be demarcated by 2 feet wall. Plantation shall also be done along the inside per 7 Bharat boundary of Fuel Station. As compliance Petroleum Corporation Limited, Territory Mathura hereby undertakes that Plantation will also be done along the inside boundary of Fuel Station. 8 All the funds received from the User AgencyAs per compliance 8, Bharat Petroleum under the shall be Corporation project transferred/deposit to Limited, Mathura CAMPA Territory hereby undertakes that all the fund only thorough e-portal funds received from the BPCL under the project has been (http://parivesh.nic.in/) submitted to CAMPA fund only thorough e-portal (http://parivesh.nic.in/) and challan copy for the same has been attached 9 The Complete compliance of the FRA, 2006 shall As per compliance 9, the be ensured of complete compliance of the by way prescribed certificate from FRA, 2006 has been in the concerned District Collector prescribed format. 10 No violation of FCA certificate from concerned of As per Compliance 10, No. violation of FCA. cetificate DFO shall be provided. from concerned Divisional Forest Officer will be provided. Certificate of DFO Certifying that the proposed RO As in not per compliance 11, Certificate of Didvision in close proximity of RO in Forest 11 any exiting | the accordance with MORTH dated Officer Certifying that provided retail Outletis guidelines 24-07 not in close 2013 has to be provided. proximity of any exiting Retail Outlet. The boundary of the diverted forestland shall As pe compliance 12, Bharat Petroleum Corporatoin be suitably demarcated on gound at the Limited,Territory Mathura hereby undertakes that project cost, as per the direction of the the boundary of the diverted forest land will be 12 concerned Divisional Forest Officer. suitably demarcated on ground at the project cost, as per the direction of the concerned Divisional Forest Officer. The provid of diversion under this approval shall As per complance 13, Barat Petroleum Corporation be co-terminus with the period of lease to be Limited, Territory Mathura hereby undertakes that period 13 ranted in favour of the user agency of the project of diversion under this approval will be co-terminus with life, whichever is less the period of lease to be granted in favour of the BPCL or the project life, whichever is less. Violation of any of these conditions will As per compliance 14, Bhatar Petroleum amount to violation of Forest (Conversion) Corpporation Ltd, Territory Mathura hereby Act. 1980 and action would be taken as per undertake that Violation of any of these condition 14 the MoEF&CC Guidelines F. No. 11-42/2017- will amount to violation of Forest (Conversion) Act FC bt 29/01/2018. 1980 and action would be taken as per the MoEF&CC Guidelines F. No 11-42/2017-FC dt 29/01/2018. The complance report shall be uploded on e- As per compliance 15, All the comliance report will 15 portal (https://parivesh.nic.in/). be uploded on only thorought e-portal (http://parivesh.nic.in) Any other condition that the Ministry of As pe compliance 16, Bharat Petroleum Corporatoin Environment, Forests and Climate Change Limited, Territory Mathura hereby undertakes that any may stipulate from time to time in the othe condition that the Ministry of Environments, Forest 16 intirest of cooservation, protection and&Climate Change may stipulate from time to time in the development of forests & wildlife. interest of conservation, projecttion and development of forests & wildlife. These conditions will be followed by BPCL /3, FHfifa yfferfa-refrs uae (REa) 4TvT dEfsra aIuiNTA fro TaR-281005 HT fAdTs T4T To, Divisional Forest Officer Social Forestry Division, Farrukhabad Subject: Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Bharat Petroleum Corporation Limited Retail Outlet on Farrukhabad Kaimganj - Kampil Road (MDR- 110), In Km. No. 27 (CH. No. 26.810to CH. No. 26.850, LHS), At Khasra No 573, Village: Kuberpur, Tehsil:- Kaimganj, District:- Farrukhabad (U.P). Regarding permission for non-forestry use and without fellingg of trees in proposed 0.085908 ha. protected forest land. Reference: Ministry of Environment, Forest & Climate Change Regional office (Central Region) Lucknow of Letter No. 88/UP/06/149/2020/FC/1042, dated-25.11.2020. Sr. No. Conditions Status of Compliance The legal status of the forest land shal As per compliance 1, Bharat Petroleum remain unchanged. Corporation Ltd, Territory Mathura hereby undertakes that as per Forest (Protection) Act, 1980 legal status of the land will not be changed. 2 Compensatory afforestation shall be As per compliance 2, Bharat Petroleum taken up by the Forest Department for Corporation Limited, Territory Mathura plantation of 100 trees in (Pathramai hereby undertakes that the cost incurred in Forest Block, Kaimganj Range, Districtplantation of 100 trees by the Forest Farrukhabad) at the cost of user Department has been submitted to the agency. As far as practicable a mixture of local indigenous species will be Forest Department by the BPCL planted and monoculture of a species has to be avoided. The cost of Compensatory afforestation As per compliance 3, Bharat Petroleum at the prevailing wage rates as per Corporation Limited, Territory Mathura compensatory afforestation scheme hereby undertakes that the cost of and the cost of survey, demarcation compensatory afforestation at the and erection of permanent pillars if wage rates as per compensatory required on the CA land shall be prevailing has been submitted to deposited in advance with the Forest afforestation Department by the project authority.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us