Safeguarded Wharves Review – 2018 Individual Site Assessments

Safeguarded Wharves Review – 2018 Individual Site Assessments

Safeguarded Wharves Review – 2018 Individual Site Assessments 1 Individual Site Assessments by sub-region West 1. Hurlingham 4 2. Swedish 7 3. Comley’s 10 4. Smuggler’s Way 13 5. Pier 16 6. Cringle Dock 19 7. Kirtling 22 8. Middle 25 9. Cremorne 28 10. Walbrook 31 South East 11. Convoys 34 12. Brewery 37 13. Tunnel 40 14. Victoria Deep Water Terminal 43 15. Angerstein 46 16. Murphy’s 49 17. Riverside 52 18. Middleton 55 19. Mulberry 58 20. Pioneer 61 21. Albion 64 22. Erith 67 23. Railway 70 24. Town 73 25. Standard 76 North East 26. Northumberland 79 27. Orchard 82 28. Priors 85 29. Mayer Parry 88 30. Thames 91 31. Peruvian 94 31A.Royal Primrose 97 32. Manhattan 100 33. Sunshine 103 34. Thames Refinery 106 35. Welbeck 109 36. Alexander 112 37. Pinns 115 38. Steel 118 39. Rippleway 121 40. Docklands 124 41. Victoria Stone 127 42. DePass 130 43. Dagenham 133 44. Pinnacle Terminal 135 2 45. No.1 Western Extension 138 46. East Jetty 140 47. No.4 Jetty 142 48. Ford Dagenham Terminal 145 49. Phoenix 148 50. Halfway 150 3 1. Hurlingham 4 Address Carnwath Road, London SW6 Local Authority Hammersmith & Fulham Grid reference E 525,603/ N 175,568 Site area 0.51 ha Boundary Change None Road Access Access to Carnwath Road from north via Wandsworth Bridge Road, A217 (SRN) with connections to New Kings Road, A308 (SRN), access from south via Wandsworth Bridge Road, A217 (SRN) Congestion (delay Wandsworth Brdige Road A217 between j/w York Road (A3205) and in minutes/km) j/w King’s Road (A308): North bound: 0.5 to over 1.5 South bound 0.5 to over 1.5 Rail Access N/A Comments Wandsworth Bridge Road, A217 (SRN) offers connections to west and southwest London via junctions with A308 (SRN), A3 (TLRN), and a number of other strategic routes. Wandsworth Bridge Road experiences significant HGV flows at present. There are capacity constraints at the junction of Wandsworth Bridge Road and Carnwath Road, especially at peak times. However, the local Highway Authority has identified an improvement scheme to provide additional capacity. A Delivery and Servicing Plan could help to mitigate the noise and air quality effects of road freight activity at the wharf. Retaining wharf capacity in the area could help encourage mode shift to water, reducing the amount of strategic road freight passing through west London. Min. and max. Dries 2.26 metres to 3.68 metres berth depths Wall or jetty berth Wall berth (80 metres) (and length) Vessel size N/A LOA x beam x draft (m) Comments A drying berth, typical of the river upstream of the Thames Barrier. No campshed. Berth characteristics appropriate for barge traffic, which travels to the wharf on the flood tide, mooring at or near high water. Works to the berth are to be undertaken prior to Tideway’s use of the wharf in connection with the Thames Tideway Tunnel which should improve the wharf’s viability. Site’s planning The LB Hammersmith & Fulham Core Strategy (October 2011) in status paragraph 7.140 seeks the consolidation of wharf capacity onto fewer Surrounding land better located sites and in para 7.141 calls for the removal of the use and planning safeguarded designation at this wharf in the next Mayoral safeguarded context wharves review. The wharf forms part of the Carnwarth Road main drive site for the Thames Tideway Tunnel scheme. Current Use Vacant, last cargo handled c.1997 when wharf acquired by property (if vacant date and developer. last handled cargo) Recent average N/A tonnage (2012- 5 2016) On-site processing N/A Environmental See Separate WSP Consulting Appendices Impacts Market Interest The wharf is to be used in connection with the Thames Tideway and alternative Tunnel project until 2022, handling over 1mt of cargo by water, wharves including CD&E waste, aggregates and tunnel lining segments. In addition, there continues to be substantial interest from operators within and new to the Port of London for handling bulk cargoes, especially aggregates and containerised traffic. Safeguarding Retain safeguarding. Site is viable and long-standing interest has been Recommendation expressed in it by a range of cargo-handling operators. 6 2. Swedish 7 Address Townmead Road, London SW6 Local Authority Hammersmith & Fulham Grid reference W 525,942/N 175,722 Site area 0.55 ha Boundary Change None Road Access From north via Wandsworth Bridge Road, A217 (SRN)) with connections to New Kings Road, A308 (SRN), from south via Wandsworth Bridge Road, A217 (SRN), then left / right turn on to Townmead Road. Congestion (delay Wandsworth Bridge Road A217 between j/w York Road (A3205) and j/w in minutes/km) King’s Road (A308) North bound 0.5 to over 1.5 South bound 0.5 to over 1.5 Rail Access N/A Comments Wandsworth Bridge Road, A217 (SRN) offers connections to west and southwest London via junctions with A308 (SRN), A3 (TLRN), and a number of other strategic routes. Wandsworth Bridge Road experiences significant HGV flows at present. There are capacity constraints at the junction of Wandsworth Bridge Road and Townmead Road, especially at peak times. The Local Highway Authority has identified an improvement scheme to provide additional capacity. A Delivery and Servicing Plan could help to mitigate the noise and air quality effects of road freight activity at the wharf. Retaining wharf capacity in the area could help encourage mode shift to water, reducing the amount of strategic road freight passing through west London. Min. and max. Dries 2.86 metres to 3.08 metres berth depths Wall or jetty berth Wall berth (50 metres) (and length) Vessel size N/A LOA x beam x draft (m) Comments A drying berth, typical of the river upstream of the Thames Barrier. No campshed. Berth characteristics appropriate for barge traffic, which travels to the wharf on the flood tide, mooring at or near high water. Site’s planning The LB Hammersmith & Fulham Core Strategy (October 2011) in status paragraph 7.140 seeks the consolidation of wharf capacity onto fewer Surrounding land better located sites. The site is in industrial use (fuel storage) but is not use and planning currently utilising water transport. The site falls under the COMAH context regulations, which control the loading, storage and security of fuels at the site. Planning consent for a consolidated wharf with Comley’s Wharf and Albert wharf (not safeguarded) with residential development above granted in 2015, not yet implemented. Total throughput across the consolidated wharf projected at 115ktpa. Current Use Petroleum products by road. Last cargo handled c.2004. Site has (if vacant date and substantial fuel storage tanks and pipes for fuel transmission from the last handled cargo) river. Recent average N/A 8 tonnage (2012- 2016) On-site processing N/A Environmental See Separate WSP Consulting Appendices Impacts Market Interest Although planning consent granted for consolidation, there continues and alternative to be substantial interest from operators within and new to the port of wharves London for handling bulk cargoes. Safeguarding Retain safeguarding. Site is viable and long-standing interest has been Recommendation expressed in it by a range of cargo-handling operators. 9 3. Comley’s 10 Address Townmead Road, London SW6 Local Authority Hammersmith & Fulham Grid reference E 525,975/N 175,743 Site area 0.44 ha Boundary Change Minor change to reflect operations, ownership and highway works Road Access From north via Wandsworth Bridge Road, A217 (SRN)) with connections to New Kings Road, A308 (SRN), from south via Wandsworth Bridge Road, A217 (SRN), then left / right turn on to Townmead Road. Wharf site is located on southern side of road. Congestion (delay Wandsworth Bridge Road A217 between j/w York Road (A3205) and j/w in minutes/km) King’s Road (A308) North bound: 0.5 to over 1.5 South bound: 0.5 to over 1.5 Rail Access N/A Comments Wandsworth Bridge Road, A217 (SRN) offers connections to west and southwest London via junctions with A308 (SRN), A3 (TLRN), and a number of other strategic routes. Wandsworth Bridge Road experiences significant HGV flows at present. There are capacity constraints at junction with Wandsworth Bridge Road especially at peak times. The Local Highway Authority has identified an improvement scheme to provide additional capacity. - The finalised section 106 agreement for the development at this wharf will include transfer to the borough of a 5 metre strip along Townmead Road for the purposes of related highway improvements. A Delivery and Servicing Plan could help to mitigate the noise and air quality effects of road freight activity at the wharf. Retaining wharf capacity in the area could help encourage mode shift to water, reducing the amount of strategic road freight passing through west London. Min. and max. Dries 1.96 metres to 3.98 metres berth depths Wall or jetty berth Wall Berth (50 metres) (and length) Vessel size Tugs and tows and motorised barges LOA x beam x draft (m) Comments A drying berth, typical of the river upstream of the Thames Barrier. No campshed. Berth characteristics appropriate for barge traffic, which travels to the wharf on the flood tide, mooring at or near high water.Limited dredging works to berth approaches undertaken in 2015 prior to wharf’s reactivation. Site’s planning The LB Hammersmith & Fulham Core Strategy (October 2011) in status paragraph 7.140 seeks the consolidation of wharf capacity onto fewer Surrounding land better located sites. The site is currently in use for aggregates use and planning transhipment and the owners have received planning permission to context upgrade the facilities and increase the capacity of the site, subject to a S106 agreement.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    152 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us