Halliwell School Land Use Study EST

Halliwell School Land Use Study EST

North Smithfield - Halliwell School Land Use Study EST. TASK WEEKS EST. TASK TASK DURATION Staff May June July August START (WEEKS) 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 1 - Perimeter Survey 5/24/21 3 Matson 2 - Site Assessment 6/7/21 2 Peck 2 - Structural Assessment 6/7/21 2 Siefert 2 - Mechanical/Plumbing Assessment 6/7/21 2 Henriques 2 - Electric 6/7/21 1 McAleer 2 - Architectural Assessment 6/7/21 2 Comeau Online Survey(s) 6/28/21 Wells 2 - Asbestos Review 6/7/21 1 Miner Memo on Existing Conditions 7/5/21 Wells 2 - Transportation (Ingress/Egress) Assessment 8/16/21 1 Santacruce 3 - Wetland Delineation 7/14/21 2 Higgins 4 - Market Analysis 7/26/21 3 Seidman Charrette with Public 7/19/21 2 Wells/RLA 5 - Conceptual Design Alternatives 7/5/21 2 Kunkel/RLA 5 - Refinement of Preferred Design 8/2/21 Kunkel/RLA 5 - Feasibilty Analysis 8/9/21 4 Seidman 6 - Findings Report and Next Steps 8/23/21 2 Wells GORDON MATSON, PLS BACKGROUND 2020-Present Senior Team Leader Weston & Sampson Gordon is a land surveyor with more than 35 years of experience in boundary, geospatial, topographic, 2015-2020 bathymetric and construction surveying. He is the Survey Manager manager of the survey group and his responsibilities Weston & Sampson include daily management of projects, field and 2011-2015 office staff, business development, preparation Surveyor of detailed proposals, project financials, review of Bergmann Associates field calculations, field data, office computations, mapping and quality control of deliverables. He 2006-2011 is familiar with all types of electronic and manual- Surveyor Matson Land Surveying surveying equipment, including GPS, data collectors and robotic total stations. 1990-2006 Surveyor SPECIFIC PROJECT EXPERIENCE Boswell Engineering Parks and Recreation Sites, Various Locations, Massachusetts. Provided EDUCATION topographic, utility and partial boundary surveys of existing parks for engineering 1986 and landscape architectural design projects and upgrades. Parks included Ceylon, Associates Degree Danehy, Sweetser, Draw 7, North Common, Pagel, Hovey, Dracut Memorial, Forestry/Surveying Graniteville Veterans Park, Springfield Waterfront, Mary Dennison, Conway. Paul Smith’s College of Arts and Responsible for project management, review of title information, deeds and record Science documents, review of field and office computations, and computations and review PROFESSIONAL of boundary line and newly created parcels. Prepared legal description for lease REGISTRATION parcels and access ways, and provided QA/QC review and oversight of survey work performed by other staff. Professional Land Surveyor: New Hampshire No. 01068 Athletic Field Sites, Various Locations, Massachusetts. Performed boundary, New York No. 50570 topographic, and utility surveys for engineering design and site improvements to Connecticut No. 0070445 various athletic field sites (Lowell Spinners, Dartmouth HS, Wayland HS, SABIS Vermont No. 024.0118249 School, Walsh MS, North Common, Healey School, Pagel, Hovey, Dracut Memorial, PROFESSIONAL Madison Park HS). Responsible for project management, review of title information, CERTIFICATIONS deeds and record documents, coordination of geotechnical and underground utility location services, review of field and office computations, computations and OSHA 10-Hour Occupational review of boundary line and newly created parcels, preparation of legal description Health and Safety for lease parcels and access ways, and QA/QC review and oversight of survey CSX Rail Safety work performed by others. Confined Space Entry (29CFR Prescott Park and Four Tree Island, Portsmouth, New Hampshire. Surveyor for 1910.146) improvements to the park, marina, and visitor island. Completed a site survey and bathymetric survey to identify all visible features, including but not limited to Amtrak Contractor Safety and buildings, above and below grade structures, asphalt and concrete limits, docks, Security Training, 2017 riparian features, curbs, sidewalks, drainage ditches, bollards, perimeter fencing, trees and bushes, overhead wires, and any other visible utility features. Mapping PROFESSIONAL AFFILIATIONS was compiled using AutoCAD in NAD83 and NAVD88 datums, with contours generated in 0.5-foot intervals. AutoCAD mapping also included non-visible New York State Association of features such as property lines, easements, water main(s), gas main(s), gravity Professional Land Surveyors sewer main(s), sewer force main(s), electrical duct banks, underwater topography Connecticut Association of and communication lines. Professional Land Surveyors Public Works Facility Study & Design, Bloomfield, Connecticut. Surveyor for New Jersey Association of evaluation and design of renovations to the existing facility and two major additions, an administration wing and three additional vehicle maintenance bays. Project westonandsampson.com GORDON MATSON, PLS Professional Land Surveyors Eastern New York Society of Land Surveyors also included a stand-alone vehicle wash building, canopy structures for outdoor storage of vehicles and equipment, and an above-ground vehicle fueling island with a canopy for a total of 11,000 square feet of new construction. Department of Public Works Facilities, Various Locations, Massachusetts. Performed surveys (boundary, topographic, and utility aspects) on properties for engineering design of DPW facilities for Billerica, Chatham, Marshfield, Arlington, Burlington, Raynham, Yarmouth, and Paxton. Responsible for project management, review of title information, deeds and record documents, coordination of geotechnical and underground utility location services, review of field and office computations, review of boundary line and newly created parcels, legal description for lease parcels and access ways, and QA/QC review and oversight of survey work performed by others. Blackstone Visitor Center, Worcester, Massachusetts. Project manager for boundary and existing conditions survey for the transfer of the new Blackstone Visitor Center from MassDOT to DCR along with creating several easements and agreements for the following: utilities (storm, electric and sanitary), bike path, bridge maintenance, detention basin, and an extinguishment of an old railroad easement. Reviewed the record research, assisted with boundary and office computations, assisted with defining existing easements and the extinguishment of a railroad easement, and provided QA/QC review and oversight survey work performed by other licensed staff. North Colonie Central School District, North Colonie, New York. Team leader/ land surveyor for existing conditions surveys of the school district for the future expansion of school services and building expansions. Preparation of scope and budget for individual school sites and the main campus along with the overview of the survey crews, schedules and deliverables to the designers and client. Hudson Central School District, New York. Team leader/land surveyor for existing conditions surveys of the school district for the future expansion of school services and building expansions. Preparation of scope and budget for the main campus along with the overview of the survey crews, schedules and deliverables to the designers and client. Main Entrance and Access Survey, Troy High School District, Troy, New York. Surveyor responsible for the field and office work to provide a topographic survey of the front of the existing high school main entrance area for the design of new stairs and handicap ramp accessibility. NYOGS Region 1, Route 28N over the Hudson River and Upper Hudson Railroad, North Creek, New York. Survey manager responsible for topographic survey of one mile of highway and for vertical and horizontal photogrammetry control and 14 hydrographic cross sections and the preparation of the control report. Ryan Street Reconstruction, Middletown, Connecticut. Team leader responsible for overseeing the topographic survey for base mapping as required for the redesign of the roadway, sidewalks, and utilities. westonandsampson.com ALYSSA PECK, PE BACKGROUND 2017-Present Project Manager Weston & Sampson Alyssa is a project manager in Weston & Sampson’s civil site/transportation programs. Her responsibilities 2013-2017 include roadway, parking, septic, and stormwater Project Engineer management design; soil evaluations and Weston & Sampson percolation tests; development of site layout plans 2005-2012 and building concepts for municipal, educational, Engineer recreational, and Department of Public Works (DPW) Weston & Sampson facilities; contract document preparation; surveying; permitting; and AutoCAD services. EDUCATION 2005 SPECIFIC PROJECT EXPERIENCE Bachelor of Science Civil Engineering Civil/Site Engineering for Department of Public University of New Hampshire Works Facilities, Bourne, Charlton, Hopkinton, Lexington, Mansfield, Medford, Norwood, Orleans, Wayland, and Weston, PROFESSIONAL REGISTRATION Massachusetts. Project engineer conducting soil evaluations and percolation Professional Engineer: tests for septic systems and stormwater solutions. Designed site layout, grading, Massachusetts (#49074) drainage, and site utilities. Projects included preparation of permit applications for Title 5 Approved Soil Evaluator several authorities, including Planning and Zoning Boards, Boards of Health, and Conservation Commissions; compilation of construction plans and bid documents; PROFESSIONAL SOCIETIES and construction administration tasks. Women’s Transportation Seminar Site Improvements at Babson College, Wellesley, Massachusetts.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us