Plan Head 11

Plan Head 11

ON GOING PROJECTS UNDER CAO/C/ECR Sl.No. Name of work 1 2 PLAN HEAD 11 (NEW LINES) 1 Sakari - Hasanpur 2 Muzaffarpur-Sitamarhi( 63 KM) 3 Khagaria- Kuseswar Asthan (44 KM) 4 Const. of Rly. Bridge over River Ganga at Monghyr. 5 Patna Ganga Bridge with linking between Patna & Hajipur. (19 KM) 6 Ara- Sasaram (98KM) 7 Giridih- Koderma (Phase-I )150 Km 8 Rajgir -Hasua -Tilaya(46 Km) 9 Koderma - Ranchi (189 Km) 10 Koderma - Tilaiya( 68 Km) 11 Koshi Bridge 12 Hajipur-Sagauli 13 Chapra Muzaffarpur (84.65 Km) 14 Motihari-Sitamarhi (76.7 KM) 15 Darbhanga-Kusheshwar Asthan (70.14 KM) 16 Bihta-Aurangabad via Anugrahnarayan Road(118.45 Km) 17 Sitamarhi-Jayanagar-Nirmali Via Anugrahnarayan Road(188 KM) 18 Muzaffarpur-Katra Oral Janakpur Road(66.55KM) 19 Ara-Bhabua Road(122.0 KM) 20 Araria-Supaul(92.0KM) 21 Dehri-On-Sone-Banrari(36.4KM) 22 Gaya-Daltonganj Via Rafiganj(136.88) 23 Gaya-Chatra(97 KM) 24 Nawada-Laxipur(137 KM) 25 Kursela-Bihariganj(35 KM) 26 Muzaffarpur-Darbhanga(66 KM) Plan Head - 13 Restoration of dismantle line 1 Fatuaha- Islampur (42 KM ) Plan Head - 14 (Gauge Conversion) 1 Sakri-Laukha bazar-Nirmali-Saharsa-Forbesganj(206.06KM) 2 Samastipur - Khagaria(86 KM) & Mansi- Khagaria (9.78KM) 3 JayNagar - Darbhanga- Narkatiaganj (268 KM ) 4 (I) Manasi -Saharsa- Dauram Madhepura (21 Km ) (ii) Bridge No- 53 MM of Mansi Saharsa (iii) Dauram Madhepura Purnea MM of Mansi Saharsa (iv) Saharsa _ Dauram Madhepura MM of Mansi Saharsa 5 Jaynagar-Bijlapura incl-Ext-Bijlapura-Bardibas(Nepal) Plan Head - 15 (Doubling) 1 Karpurigram-Siho ( 26 KM) 2 Katihar- Semapur (11.26 KM ) 3 Chapra-Hajipur ( 59 KM) 4 Sonenagar - Mughalsarai 3rd line with Bi- directional signalling Fly- over at SEB. 5 Punpun- Taregna ( 16 KM ) 6 Gaya- chkand ( 9.29 KM ) 7 Tarengna-Jehanabad (15-20 KM) 8 Mansi-Maheskhunt Patch Doubling(22.12 KM) 9 Jehanabad-Bela (27.47 KM) 10 Bela Chakand 11 Sonepur Hajipur Doubling including Gandak Bridge 12 Kursela-Semapur (27.78 KM) 13 Maheshkhunt- Thanabihpur (31.75 Km) 14 Thana-Bihpur Kursela Doubling (33.57Km) 15 Begusarai-Khagaria Doubling (40.38 Km) 16 Tilrath - Begusarai Doubling (8.33 Km) 17 Chandrapura-Rajabara-Chandrapura-Bhandaridah 18 Barauni Tilrath(RVNL) Plan Head - 16 ( Traffic Facilities) 1 Gaya-Manpur 3rd Line 2 Patna Jn. Addl. Plateform & Extn.of Plate form No.4 to 7(Patna ext.PF 8&9) 3 Kumarbagh-Chanpatia 3rd Running Line (686 M) 4 Patna Addl. PF NO-10 & Circulating Area on Karbigahia 5 Bakhtiyarpur Fly Over,Bakhitiyarpur-Barh-3rd line & Surface triangle 6 Patna Jn Stabling line(2 Nos.) 7 Narainpuranant-Besic facilites as freight terminal 8 New Muzaffarpur-Terminal station 9 Ghoushwar Conversation of Halt 3 line cross station Plan Head- 30 ( ROB) 1 Chutki-ROB in lieu of LC no-28 SPL 2 Matri-Gomoh( LC no-9-B)Gomoh-Telo& Gomoh-Khanudih ROB 3 Hazaribagh Road-Keshwari ROB LC No-20/B/T 4 Parsauni-Sitamarhi ROB LC No-56 5 Patna Gaya ROBat Patna stn. Yard limit.79A (Mithapur) 6 Patna - chirainya tand ROB 7 Rajendra Nagar- Guljarbagh 73 8 Rajendra Nagar-Guljarbagh ROB (75C) 9 Dhanbad - Bhuli ROB 10 Parasnath- chergo ROB 11 Dhokra - DHN ROB 12 Ray - Khalari ROB near L-xing No 6/B/T 13 Bhuli -Tetulmari ROB-3 14 Laheriyasarai-Darbhanga ROB LC No-25/Spl. 15 Narkatiaganj Yard ROB L-xing No.22 16 Telo - Chandrapura ROB 17 Gulzarbagh-Rajendranagar ROB No.-74 18 Bagha Yard ROB L-xing No.50(2 lane) 19 Jivdhara-Motihari ROB L-xing No.159--A(2 lane) 20 Narkatiaganj-Harinagar ROB L-xing 31 (2 lane) 21 Khagaria ROB i lieu of L-Xing No.23-B 22 Tori-Mahuamilan ROB LC No-24/A/T 23 Darbhanga stn. Yard ROB LC 27 24 Muzaffarpur-Narayanpur Anant ROB No. 101 25 Muzaffarpur-Narayanpur Anant ROB No. 101 A 26 Biharsarif-Nalanda ROB LC No-41/B 27 Naugachhiya-Katareah ROB LC No-11/Spl 28 Sonpur - Parmanandpur LC 4A 29 Adapur - Raxaul LC 33 30 Raxual - Bhelwa ROB LC 34 31 Kakarghati - Tarsarai ROB LC 32 32 Chakia-Yard ROB LC No-137 33 Bihta-Koelwar ROB- NO-45 34 Sachivalaya- Phulwarisharif ROB-31 35 Sachivalaya- Patna Jn.ROB-30 36 Patna Sahib-Gulzarbagh ROB-72 37 Sonenagar - Dehri-on-sone ROB 33. 38 Kudra Road-ROB in Lieu of 52A-1 39 Sasaram-ROB 43 40 Jeevdhara-Bapudham Motihari ROB LC No-159 41 Gaya-Kasta- ROB -2 42 Supaul-Tharbitiya ROB LC No-53 43 Koderma ROB (2 lane)in lieu of level crossing gate No.34/A/T 44 Patna-Gaya-Diversion of road of NH-83 for ommission of level crossing No -4C/2E 45 Samastipur-Karpurigram ROB LC No-53A 46 Bhabhua ROB in lieu of LC 60 B 47 Jamui-Malaypur- 4lane ROB in lieu of LC 46A 48 Kulharia Ara- 4lane ROB in lieu of LC-48A 49 Work Costing Below Rs.2.50 CR Each 50 Phulwari Sasrif-Danapur ROB level crossing No.35-B 51 Kauria Halt-Bihia-ROB level crossing 53-A 52 Danapur-Phulwarisharif ROB LC No-33C/B 53 Hajipur Muzaffarpur ROB level crossing 3 Spl 54 Begusarai -Tilrath ROB (2Lane) LC NO-47-B 55 Chhota Ambana-Pradhankunta ROB-15 56 Bhuli -Tetulmari ROB-2 57 Katrasgarh-Nichitpur ROB-3 B 58 Katrasgarh-Nichitpur ROB-1 B 59 Barauni -Tilrath ROB-61 60 Working costing below 2.5 cr 61 Danapur-Neora ROB LC No-36 Class B 62 Danapur-Neora ROB LC No-38 Class B 63 Bihta-Neora ROB LC No-42 Class B 64 Kulharia-Ara-ROB LC No-47 Class B 65 Chausa-Gahmar ROB LC No-78 Class A 66 Buxar-Baruna ROB LC No-70 Class A 67 Islampur-Rafiganj ROB LC No-19/B 68 Pusauli-Muthani ROB LC No-56/C 69 Guraru-Islampur ROB LC NO-11/B 70 Gaya-Kastha ROB LC No-4/A 71 Sonepur-Parmanandpur ROB LC No-1-A Plan Head - 32 ( Bridge) 1 MGS Div., New SEB Bridge 2 BadalGhat - Dharmaghat BR NO-51 3 Hayaghat-Thalwara rebuilding (Br.No.16) 4 Samastipur-Darbhanga rebuilding of bridge No-1 5 Samastipur-Darbhanga rebuilding of bridge No-13-A 6 Samastipur -Darbhanga rebuilding by open Wave grider(Br No-15) 7 Samastipur-Darbhanga rebuilding by open Wave girder (Br.No-14) 8 Hayaghat-Thalwara rebuilding by open wave girder (Br.No-17) 9 Kiul and Lucleesarai remodeling of Br-No-136 at new allotment on new line. 10 Rambahdurpur-Halaghat New Bridge No-15 A 11 Darbanga Nirmali rebuilding of bridge No-116,123 & 136 12 Kiule Patna Repl Through girders (Br No-136) Plan Head - 42( Workshop & Production unit) 1 Narainpuranant-Wagon Roution Overhaulling Depot 2 Jha-Jha Devlopment of Additional Facilities for Main Line EMU Shed 3 Samastipur Augmentation of holding capacity of Diesel Shed from 50 to 100 Locos 4 Saharsa Broad Guage Coach Maintenance Facilities. 5 Rajendra Nagar Coaching Complex-LHB Maintenance facilities PH-I 6 BJU New loco shed to home 100 Elect Loco 7 Samastipur Workshop Facility for Repair of C Category Unloadable Wagons 8 Facility for rehabilation of unloding wagon at Brauni (Garhara Yard) 9 Jaynagar -BG Coching Comples with washing pit (AC COACH) 10 Garkha(Chappra) Facilities for rehabilation of unloding wagons 11 Khagaria setting up of concrete Sleeper Plant Plan Head 52 ( Staff Amenities) 1 Rajendra Nagar Construction of Central Hospital Plan Head 53 ( Passenger Amenities) 1 Pathardih-Diversion of pipe line to Dhanbad 2 Rajendra Nagar station building, circulating area & platform shades. 3 Rajendranagar reinforced concrete cement over head tank (1 lakh galon capacity)and washable appron on platform lines. Plan Head 64 (Other specified Works) 1 Mokamah RPF Training centre 2 Hajipur Setting Up of East Central Railway Zone 3 Garhar-setting up of new 11th battalion RPSF with residential accomodation facilities .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us