Current state and prospects of development of transport and communication potential of the Republic of Uzbekistan by Farhod Islamov Head of Logistics and Freight Forwarding Department of transport company JSC Central Asia Trans of the Ministry for Foreign Trade of the Republic of Uzbekistan Main transport corridors through Uzbekistan Tallinn Riga Klaypeda Brest Zabaykalsk Chop Ilichevsk Alashankou Konstantsia Urumchi Poti Uzbekistan Nahodka Akhalkalaki Tashkent Andijan Navoi Turkmenbashi Beijing DunDan Kars Baku Kashgar Athens TyanTsin Khayraton Serakhs Mersin Mazari-Sharif Gerat Pusan Aleksandria Shanghai Bafk Kvetta Zahedan Bam Bandar-Abbas Dammam Gvadar Chahbahar Er-Riad Karachi Jebel-Ali Chittagong Hong-Kong Railways: Hanoi Mumbai Existing Under construction Projected Hoshimin Railways Total transportation volume – 76.8 mln. tones Share of transportation in 2016 52,8 5,1 10,9 8 export import transit domestic Main forwarder in Uzbekistan Total railways length – 7 th.km, of which - main lines - 4.8 th.km, - Еlectrified - 2.2 th.km. Construction of new railway lines Construction of “Angren - Pap” railway line with length of Construction of 123.1 km, including a 19.2 km long tunnel, is completed “Navoi-Uchkuduk – in July 2016 Sultanuizdag” railway line with length of 341 km is completed in 2001 Construction of “Guzar-Boysun – Kumkurgan” railway line with length of 220 km is completed in 2007 FURTHER DEVELOPMENT FOR 2017-2020. This program includes followings: •“Bukhara – Misken” railway line construction with 354,2 km long; •“Pap – Namangan – Andijan” railway line electrification •with 145,1 km long; •“Karshi – Termez” railway line electrification with 325 km long. Prospective projects Transafghan corridor Construction of rail roads on the route "Mazar-i-Sharif-Shibergan-Mayman-Herat". Transafghan corridors UZBEKISTAN Tashkent TURKEY Bazargan Termez Mazari- Mashhad Sharif KABUL Tehran Termez – Herat Sangan Herat – Sangan AFGHANISTAN Тashkent – Herat – Bazargan Milak Delaram Kerman Тashkent – Herat – Zahedan Sangan – Bandar Abbas Тashkent – Herat – Chabahar INDIA Bandar- Abbas Chabahar Gwadar Karachi Prospective projects • Formation and implementation of the project for the construction of the railway "China- Kyrgyzstan- Uzbekistan" Map of the construction of the railway - China-Kyrgyzstan-Uzbekistan ПрогрессКАЗАХСТАН реализации Достык/Алашанькоу Цхинхе Коргас/Хоргос Жетыген Жанатас Алматы УЗБЕКИСТАН Луговая Бишкек Балыкчи Арысь Ташкумыр Казарман КЫРГЫЗСТАН Ташкент Алабуга Транспортно- Джалалабад Саз Андижан Кашкасу Сарыбулак Торугарт транзитный Карасу ТУРКМЕНИСТАН Ош Кизилкия Бухара Навои коридор Сарыташ Самарканд Иркештам Кашгар Ходжадавлет Туркменабат Карамык «Узбекистан- Карши Душанбе КИТАЙ Туркменистан- ТАДЖИКИСТАН Атамурад Курган тюбе Иран-Оман» Термез Акина Шерхан Бандар Серахс Андхой Мазари-Шариф Кундуз Мешхед ИРАН Маймане Серхетабат АФГАНИСТАН Хаф Герат подготовлено УТОВЭС МВЭСИТ, 2012 Thank you for your attention!.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-