Chittagong Strategic Urban Transport Master Plan Corridor Improvement Pre-Feasibility Study

Chittagong Strategic Urban Transport Master Plan Corridor Improvement Pre-Feasibility Study

Chittagong Public Disclosure Authorized Strategic Urban Transport Master Plan (P155253) Public Disclosure Authorized Corridor Improvements Pre-Feasibility Study 19 November, 2018 Public Disclosure Authorized Prepared by: Prepared for: Public Disclosure Authorized e.Gen Consultants Ltd., Bangladesh in association with Integrated Transport Planning Ltd, United Kingdom Chittagong Strategic Urban Transport Master Plan Corridor Improvement Pre-Feasibility Study Contents 1 Introduction ..................................................................................................................................... 1 2 Rationale for corridor selection ....................................................................................................... 2 2.1 Corridor options ........................................................................................................................... 2 2.2 Evaluation methodology ............................................................................................................ 16 3 Corridor Approach Definition ........................................................................................................ 19 3.2 Defining a Corridor Improvement Strategy ............................................................................... 25 3.3 Developing the Public Transport hierarchy ............................................................................... 26 3.4 Potential for phased introduction ............................................................................................. 27 4 Corridor Improvements ................................................................................................................. 30 4.1 Dedicated running lanes ............................................................................................................ 30 4.2 Junction improvements ............................................................................................................. 38 4.3 Bus stops/stations ...................................................................................................................... 41 4.4 Vehicles ...................................................................................................................................... 43 4.5 Service plan ................................................................................................................................ 44 4.6 Arrangements for routes joining the BRT corridor .................................................................... 50 4.7 Bus priority measures for direct services .................................................................................. 50 4.8 Revenue collection ..................................................................................................................... 51 4.9 ITS ............................................................................................................................................... 51 4.10 Pedestrian facilities .................................................................................................................... 52 4.11 Terminals and interchanges ....................................................................................................... 54 4.12 Depots ........................................................................................................................................ 58 4.13 Major civil works ........................................................................................................................ 60 4.14 Institutional arrangements ........................................................................................................ 61 4.15 Bus Sector Reform ..................................................................................................................... 64 4.16 Branding ..................................................................................................................................... 65 4.17 Parking management ................................................................................................................. 65 4.18 Other design issues .................................................................................................................... 66 4.19 Freight improvements ............................................................................................................... 67 5 Modelled Impacts and Forecast Patronage ................................................................................... 68 5.1 Form of model ........................................................................................................................... 68 5.2 Impact on network ..................................................................................................................... 69 5.3 Forecast patronage .................................................................................................................... 75 5.4 Modelling summary ................................................................................................................... 80 6 Capital and Operational Costs ....................................................................................................... 81 6.1 Capital cost ................................................................................................................................. 81 6.2 Operating cost ............................................................................................................................ 82 6.3 Financial evaluation ................................................................................................................... 83 Corridor Improvement Pre-Feasibility Study Page i Chittagong Strategic Urban Transport Master Plan 7 Economic Appraisal ....................................................................................................................... 87 7.1 Public Transport Consumer benefit ........................................................................................... 88 7.2 Public Transport Producer benefit ............................................................................................. 88 7.3 External benefits ........................................................................................................................ 89 7.4 Project costs ............................................................................................................................... 90 7.5 Net economic benefits ............................................................................................................... 90 7.6 Sensitivity analysis ..................................................................................................................... 92 8 Social Impact Assessment .............................................................................................................. 93 8.1 Impacts on commuters .............................................................................................................. 93 8.2 Provision of transport supportive of women............................................................................. 94 8.3 Impacts on land and settlements along the corridor ................................................................ 97 8.4 Public transport regulations ...................................................................................................... 98 8.5 Impacts on public transport operations .................................................................................... 99 8.6 Addressing economic dislocation ............................................................................................ 101 9 Conclusion .................................................................................................................................... 103 Corridor Improvement Pre-Feasibility Study Page ii Chittagong Strategic Urban Transport Master Plan List of Figures Figure 2-1: Identified corridors .................................................................................................................... 2 Figure 2-2: Green corridor (Kalurghat to Airport with New Market spur) .................................................. 3 Figure 2-3: Current Cross Section: Kamal Atartuk between VIP Road and Sea Beach Road. ...................... 4 Figure 2-4: Current Cross Section: M.A. Aziz Road between Katgar Junction and KEPZ Junction. .............. 5 Figure 2-5: Current Cross Section: M.A. Aziz Road ...................................................................................... 6 Figure 2-6: Current Cross Section: Tiger Pass Road ..................................................................................... 7 Figure 2-7: Current Cross Section: CDA Avenue .......................................................................................... 8 Figure 2-8: Current Cross Section: Chittagong – Cox’s Bazar Highway (Arkan Road) .................................. 9 Figure 2-9: Current Cross Section: Chittagong – Cox’s Bazar Highway (Arkan Road) ................................ 10 Figure 2-10: Blue corridor (Alongkar Mor to Shaheed Boshirussaman Sq) ............................................... 12 Figure 2-11: Red corridor (Baluchara to New Market) .............................................................................. 14 Figure 3-1: Preferred green corridor ......................................................................................................... 19 Figure 3-2: Corridor opportunities

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    109 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us