Operation Watershed Active Communities Fund Update

Operation Watershed Active Communities Fund Update

Appendix B Community Group or Date Brief Description of Project Grant £ Awarded since 2013 Parish Council Sep-13 Albourne Parish Council Drainage and property repairs £ 3,756.64 Oct-13 Albourne Parish Council Survey local flooding areas & ditch and drainage repairs. £ 19,205.00 Ditch works to alleviate flooding and flood erosion in Feb-15 Albourne Parish Council £ 4,900.00 Church Lane Jan-17 Albourne Parish Council CCTV Investigations (Various) £ 4,800.00 Jan-17 Albourne Parish Council Village Hall, The Street - Highway Gullies £ 4,997.87 £ 37,659.51 Ansty and Staplefield Parish To improve surface water drainage system around Sep-13 £ 37,070.00 Council Staplefield common. Ansty and Staplefield Parish Brantridge Lane – CCTV Investigation, New Swale and Feb-17 £ 17,668.00 Council connection to existing drainage network. £ 54,738.00 Various drainage work around the Town including Feb-17 Burgess Hill Town Council £ 12,670.27 gullies, soakaways and grips. £12,670.27 Upstream and downstream drainage network repairs and Feb-14 Cuckfield £ 12,457.95 installation of culverts and drainage pipework. £12,457.95 Oct-13 Fulking Parish Council Survey local flooding areas & ditch and drainage repairs. £ 13,800.00 Feb-14 Fulking Parish council Ladybrook Spring containment scheme £ 2,275.00 Brooks, Clappers Lane - CCTV Survey & Jetting of Mar-17 Fulking Parish council £ 4,134.63 existing drainage, Ditch Clearance and install road gully Nomads, Clappers Lane - CCTV Survey & Jetting of Mar-17 Fulking Parish council £ 2,967.78 existing drainage and Ditch Clearance Sands, Clappers Lane - Phase 1 Ditch Work - Culvert Mar-17 Fulking Parish council £ 4,206.32 Headwall, and clearance Sands, Clappers Lane - Phase 2 Diversion Work - Trash Mar-17 Fulking Parish council £ 4,823.67 Screen, Gully and culvert headwall Sands, Clappers Lane - Phase 3 Gully Works CCTV & Mar-17 Fulking Parish council £ 885.53 Jetting and raise existing gully grate £33,092.93 Training by NFF for Flood Action Group first responder Dec-13 Lodge Close FAG £ 1,000.00 Emergency Kit Produce event to engage communities affected by flooding, to educate and raise awareness of flood and Sep-13 Ouse & Adur Rivers Trust £ 7,750.00 related issues and action and to establish the formation of water focus groups Apr-15 Hassocks Amenity Association Hassocks Parkland Road drainage £ 1,500.00 Hassocks Lodge Lane drainage - Culvert and manhole Apr-15 Hassocks Amenity Association £ 4,631.00 repairs Apr-15 Hassocks Amenity Association Lodge Lane /Dale Ave CCTV survey £ 4,899.00 Hassocks Natural Flood Management: Creation of Jun-16 Ouse & Adur Rivers Trust £ 8,000.00 retention ponds Hassocks SuDS mapping and demonstration public Dec-16 HKD Transition £ 9,050.00 awareness raising activity Feb-17 HKD Transition Hassocks SuDS mapping and Demonstration £ 1,810.00 £38,640.00 Haywards Heath Town Jun-17 Install new gulley and connect to existing drainage £ 3,944.00 Council £ 3,944.00 Hurstpierpoint & Sayers Clearance of culvert and de-silting of watercourse and Apr-15 £ 4,800.00 Common Parish Council pond Hurstpierpoint & Sayers Clear culvert opposite Washbrooks Farm and installation May-16 £ 319.00 Common Parish Council of trash screen. £ 5,119.00 Windermere Road Residents Sep-13 Association - Linfield & High The installation of a surface water catch pit £ 4,513.20 Weald £ 4,513.20 Oct-13 Poynings Parish Council Survey local flooding areas & ditch and drainage repairs. £ 12,650.00 Various flood mitigation projects in the village – Feb-17 Poynings Parish Council £ 55,826.40 including Highway Drainage, installation of a swale etc Relocation of existing gulley as part of the work under Aug-17 Poynings PC £ 1,386.00 application 3038 £69,862.40 Oct-13 Pyecombe Parish Council Survey local flooding areas & ditch and drainage repairs. £ 2,754.48 £ 2,754.48 Sayers Common Parish Apr-15 Sayers Common Drainage Survey & Ditch Works £ 16,740.00 Council £16,740.00 Oct-13 Twineham Parish Council Survey local flooding areas & ditch and drainage repairs. £ 15,812.50 Apr-15 Twineham Parish Council Bob Lane Drainage Improvements £ 4,416.00 £20,228.50 Applications can be split under 4 categories Amount DITCH & WATERCOURSE = 10 applications £73,711.50 DATA, SURVEYS, INVESTIGATION AND MAPPING = 10 applications £82,159.94 HIGHWAY DRAINAGE IMPROVEMENTS = 13 applications £147,798.80 TRAINING, EDUCATION, VOLUNTEER SUPPORT & EQUIPMENT = 2 applications £8,750.00 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us