East/South Landfill Gas Project – a Revenue Generator

East/South Landfill Gas Project – a Revenue Generator

East/South Landfill Gas Project – A Revenue Generator Mike Watt, Exec VP • [email protected] • (905) 321-3292 Walker Environmental Group A Division of Walker Industries Walker Environmental Group Organics Recycling and Disposal •Composting •Environmental Projects •Biosolids Management •Residential Drop-off •Renewable Energy •IC&I Waste Haulage •Grease Trap, Organics and •Waste Transfer Used Cooking Oil Collection •Landfill Disposal (2) •Soil Disposal and Remediation Technical Services •Environmental Projects •Carbon Neutral Buildings •Carbon Services Biosolids Drop-off Admin Offices Compost East Landfill Landfill Gas Plant South Landfill What is Landfill Gas? • 50% Methane • 50% CO2 • Trace gases and particulate, especially Oxygen and Nitrogen • Half heating value of natural gas LFG Utilization Across Canada (IGRS) Ontario: – Ottawa – Niagara – Essex – Moose Creek – Mississauga Outside Ontario: – Brandon, MB – Winnipeg, MB Niagara Falls, ON Landfill Gas Utilization South/East Landfill - Opportunities The System East Landfill • 3565 m header pipe • 112 well heads Current South Landfill • 1382 m header pipe • 35 well heads WEG Landfill Gas Curve - 20 Year Projection 10,000 9,000 8,000 7,000 6,000 LFG Curve 5,000 ELF Curve SLF Curve 4,000 Project Usage WEG Landfill Gas Supply (scfm) Supply Gas Landfill WEG 3,000 2,000 1,000 0 Energy Production • 1 MW FIT contract • 12 cents/kw +/- • 350 CFM +/- • Siloxane treatment • With pre-existing infrastructure and investment – Generates positive revenue Pipeline to Resolute • Two pipelines • 2000 CFM +/- • Displaces 60% + of NG needs($2-$3m/yr sales) • 100% recycled paper mill • Intermittent production (Newsprint market) ERC Credits • 3M tonnes traded since 2007 • East only (not required by regulation) – Eliminated in 2016 by regulation. • Market weak at present – Voluntary deals. Carbon Neutral events. • Impact of Cap & Trade in Ontario? – Small landfills • Driving voluntary LFG collection installation Future Projects Second Pipeline (7km) • Multiple customers • 5 MW of generation at remote industry with $10M investment and pipeline contract • Boiler fuel replacement for other customers • Enbridge as partner (cost) • 20 year + contract • Cap-Ex guarantees Pipeline Quality Gas / Vehicle Fuel • PR value high • Economics borderline • Relying on RIN credits in US (problematic) • May do demo vehicle project – 300 CFM • 2x the cost of power generation • History of equipment failures Learnings • Big is better – 1500 CFM and above (4-5 MW) • 8-14 cents/kwhr to make power projects work • Direct use should be less than 6km away (in our case government incentives for base load displacement) • Capital intensive • Dealing with Regulated utilities – Great partner, very expensive pipelines • Customers can go out of business – Protections Mike Watt Executive Vice President [email protected] (905) 321-3292 PO Box 100 Thorold, ON L2V 3Y8 Ph. 905.680.1900 FX. 905.680.1916 Toll Free 1.800.263.2526 www.walkerind.com .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us