New York Linear Construction Project Report Spectra Energy NJ-NY Expansion Project

New York Linear Construction Project Report Spectra Energy NJ-NY Expansion Project

Results you can rely on New York Linear Construction Project Report Spectra Energy NJ-NY Expansion Project Prepared for: 890 Winter Street Suite 300 Waltham, MA 02451 Prepared by: TRC Environmental Corporation 57 East Willow Street Millburn, New Jersey 07041 February 2014 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ............................................................................................................................. 4 1.1 PROJECT DESCRIPTION AND BACKGROUND .................................................................................................. 4 1.2 ENVIRONMENTAL IMPACTS AND MITIGATION .............................................................................................. 5 2.0 PRE-CONSTRUCTION DUE DILIGENCE .................................................................................. 7 2.1 PROJECT AREA DESCRIPTION .................................................................................................................... 7 2.1.1 Topography ......................................................................................................................... 7 2.1.2 Surface Water ..................................................................................................................... 7 2.1.3 Regional Geology ................................................................................................................ 8 2.1.4 Project Geology ................................................................................................................... 8 2.1.5 Hydrogeology ...................................................................................................................... 9 2.2 PROJECT AREA HISTORY .......................................................................................................................... 9 2.2.1 Past Uses and Ownership.................................................................................................... 9 2.2.2 EDR Database Search ........................................................................................................ 10 2.2.3 Historical Aerial Photographs and Sanborn Fire Insurance Maps ..................................... 10 2.2.4 NYSDEC File Review ........................................................................................................... 10 2.3 IDENTIFIED CONTAMINATED PROPERTIES .................................................................................................. 11 2.3.1 Database ........................................................................................................................... 11 2.3.2 Contaminated Site Summaries .......................................................................................... 11 3.0 PRE-CONSTRUCTION SAMPLING .......................................................................................... 13 3.1 PRE‐CHARACTERIZATION SOIL SAMPLING PLAN .......................................................................................... 13 3.2 PRE‐CHARACTERIZATION SOIL SAMPLING.................................................................................................. 13 3.3 WASTE CLASSIFICAITON SAMPLING.......................................................................................................... 14 3.3.1 Findings ............................................................................................................................. 15 3.3.1.1 Contaminated Sites ......................................................................................................... 15 3.3.1.2 Hazardous Materials ........................................................................................................ 15 3.4 GROUNDWATER................................................................................................................................... 15 3.4.1 Sampling Plan ................................................................................................................... 15 3.4.2 Aquifer Testing .................................................................................................................. 16 3.4.2.1 Findings ............................................................................................................................ 16 3.5 GOVERNING DOCUMENTS ..................................................................................................................... 16 3.5.1 Health and Safety Plan...................................................................................................... 16 3.5.2 Excavation Management Plan .......................................................................................... 17 3.5.3 Soil Management Plan ...................................................................................................... 17 3.6 PERMITS ............................................................................................................................................. 19 3.6.1 Groundwater ..................................................................................................................... 19 4.0 CONSTRUCTION .......................................................................................................................... 20 4.1 TRENCHING ......................................................................................................................................... 20 4.2 HDDS ................................................................................................................................................ 20 4.3 BACKFILLING ....................................................................................................................................... 21 4.4 CLEANING AND HYDROSTATIC TESTING ..................................................................................................... 21 4.5 DISCHARGE OF HYDROSTATIC TEST WATER ............................................................................................... 21 4.6 WASTE MANAGEMENT ......................................................................................................................... 22 4.6.1 Soil .................................................................................................................................... 22 4.6.2 Description of Disposal Facilities ....................................................................................... 23 4.6.3 Waste Characterization and Soil Disposal ........................................................................ 24 Linear Construction Project Report i New Jersey-New York Expansion Project 4.6.4 Description of Disposed Wastes ........................................................................................ 25 4.6.5 Stockpiling/Temporary Storage ........................................................................................ 26 4.6.6 Groundwater ..................................................................................................................... 26 4.6.6.1 Discharge Locations ......................................................................................................... 26 4.6.6.2 Permit Modifications ....................................................................................................... 27 4.6.6.3 Receiving Facilities ........................................................................................................... 27 4.6.7 Product .............................................................................................................................. 27 4.6.7.1 Plugs ................................................................................................................................ 28 4.7 CLEAN FILL ......................................................................................................................................... 28 4.7.1 Sources .............................................................................................................................. 30 4.7.2 Due Diligence and Sampling Results ................................................................................. 30 4.8 SITE RESTORATION/CAPPING ................................................................................................................. 31 4.9 WELL CLOSURES .................................................................................................................................. 31 4.10 REPORTED SPILLS AND REMEDIATION ....................................................................................................... 31 Linear Construction Project Report ii New Jersey-New York Expansion Project LIST OF TABLES Table 1 Contaminated Sites Table 2 Estimated Groundwater Infiltration Rates Table 3 Approved Surface Water Discharge Locations Table 4 Summary of Soil Disposal by Property LIST OF FIGURES Figure 1 Project Overview Map Figure 2 Topographic Map of Project Area Figure 3 Geologic Map of Project Area Figure 4 Surficial Geology Map of Project Area Figure 5 Areas of Product from Reviewed NYSDEC Files Figure 6 Historic Structures, USTs, and ASTs from Reviewed NYSDEC Files Figure 7 Pre-Characterization Soil Boring and Temporary Monitoring Well Locations Figure 8 Areas of Product Figure 9 Approved Surface Water Discharge Locations LIST OF APPENDICES Appendix A Contaminated Site Summary Tables Appendix B Soil Boring Logs Appendix C Soil Laboratory Analytical Results Appendix D Groundwater Laboratory Analytical Results Appendix E Estimated Groundwater Infiltration Rates Calculations Appendix

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    71 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us