TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH Outline of TAKENAKA Corporation 10,000+ Employees US$10 B 400+Years 2,500+ out of 10,000 Annual turnover History Licenced Architects 50% of our Projects are 17 generations 26 Private company Branches Worldwide Design&Build 2 Outline of TAKENAKA Corporation “Over 400 years history through trust from clients” The oldest construction firm Kobe Office of Mitsui Bank TOKYO DOME Stadium Master Builder, Founder Corporation founded Tokyo Tower Takenaka R&D Institute First air supported dome in Japan in Japan 1610 1847 189 1909 1912 1955 1958 1962 1969 1973 1988 9 1st Prize in Design competition Founded Takenaka Europe GmbH Taiho Shrine in 1847 1st Steel Structure Building Japan Antarctic Expedition National Theater Working in abroad over half century since First Sports Facility with Retractable Roof Sapporo Dome “Hiroba” Taiwan Hakka Cultural Center The Tallest Building in Japan “Abeno Harukas” 1960. 1993 1994 1995 2001 2005 2012 2014 Into the future Kansai International Airport ACROS Fukuoka Tokyo Opera City PRADA Boutique National Art Gallery Singapore Green Covering Building and New National Theatre (Conversion of 100-year building) 3 TAKENAKA – Airports worldwide Doha, Qatar Samut Prakan, Thailand Osaka, Japan Nagoya, Japan Manila, Philippines Hamad International Airport Suvanrnabumi International Kansai International Airport Central Japan Int’l Airport Ninoy Aquino Int’l Airport Emiri (Royal) Terminal, Airport Passenger Terminal Building Passenger Terminal Building Terminal 3 (Construction: JV) 2013 (Construction: JV) 2005 (Construction: JV) 1994 (Construction: JV) 2005 (Construction: JV) 2008 Dubai, UAE Bacolod, Philippines Int’l Airport Expansion (Ph. 2), Development of New Bacolod Terminal 3, Concourse 2 & Airport CarPark (Construction: JV) 2008 (Construction: JV) 2007 Abu Dhabi, UAE Singapore Nadia International Airport Changi International Airport Terminal Building Terminal 1 extension and new T4 (Construction: JV) 1980 (Construction) 2017 (scheduled) Mombasa, Kenya Colombo, Sri Lanka Kuala Lumpur, Malaysia, Bali, Indonesia Singapore Moi International Airport Katunayake International Airport Kuala Lumpur Int’l Airport Bali International Airport Changi International Airport Terminal Building Terminal Building Satellite Building Terminal Building Terminal 1 (Construction: JV) 1978 (Construction: JV) 1987 (Construction: JV) 1998 (Construction: JV) 1992 (Construction) 1981 4 Traditions Carpentry Museum Linking tradition with innovation. Japan, 2014 Since 1984, TAKENAKA operates an own museum for carpentry tools and techniques in Kobe. It moved 2014 to a newly designed building that combines craftsmanship and modern technologies. Previous museum since 1984 in Kobe 5 Innovations “Building Takenaka R&D Institute the future“ 1993, Japan One of the biggest R&D Institutes in the construction industry worldwide. Acoustic Laboratory 200 researchers in the field of Material sciences, basic and applied construction technologies. Electromagnetic Shield Room Wind Tunnel Test Room Centrifuge Facility 6 TAKENAKA Quality Management systems Deming In 1979, Takenaka Corporation became the first non- Price manufacturer to receive the Deming Prize for its Total 1979 Quality Control. In 1992, it received the Japan Quality Control Award. Today, TAKENAKA Quality Management (TQM) is an essential part of the company’s daily business. • Since 1996, Headquarters in Tokyo and Osaka and all Japan regional offices became successively certified to the quality management standard Japan Quality ISO 9001. Control award 1992 • At Takenaka Europe, Headquarters and its 12 branch offices are certified by Bureau Veritas to ISO 9001:2008 for the scope “Design, Engineering and Construction of Buildings”. The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our clients all over Europe. Takenaka Europe ISO 9001 Group certification 7 TAKENAKA – REFERENCE PROJECTS 8 Please let us be your business partner in Europe ■ Takenaka Europe GERMANY since 1973 BELGIUM since 1975 SPAIN since 1975 UK since 1981 NETHERLANDS since 1983 FRANCE since 1984 Amsterdam TAKENAKA EUROPE ITALY since 1988 London POLAND Brussels Düsseldorf Wroclaw POLAND since 1993 Prague HUNGARY since 1995 Paris CZECH SLOVAKIAZilina CZECH since 1997 Budapest SLOVAKIA since 2000 Milan ROMANIA since 2006 Bucharest History of Takenaka Europe Barcelona ⚫ Takenaka Europe has existed in Europe for 46 years. As a local subsidiary of Takenaka Corporation. ⚫ We have over 1500 projects in 12 countries in Europe and we give full support to clients in Europe. Aisan Czech Fuel Pump Factory Komatsu Belgium Construction Machinery Office Daikin Device Czech A/C Unit Factory KIA Europe Automotive Design Center Toshiba Poland LCD Factory Hyundai Czech Automotive Factory Mori Seiki Germany Machine Tool Technical Center JAL Frankfurt Airport Lounge EXPO 2015 Japanese Pavilion, Italy Amada Germany Metal Processing Machinery TBAI Poland Seat Factory Toyotomi France Body Parts Factory Solution Center 9 There are many production facilities in Poland Poland achievements ■ Poland results 1 Japanese Art Museum 2 TOYOTA Poland Training Center 3 Warsaw Japanese Embassy 4 Japanese Ambassador’s Residence 5 TOYOTA Motor Industries Poland 6 TOYOTA Motor Manufacturing 7 Bridgestone Diversified Products Factory 1-4ph Factory 1-4 ph 1st & 2nd Factory 8 Fuji Seal Factory extension 9 NIFCO Factory 1-3ph 10 TBMECA Factory 1-2ph 11 ACCUROMM Factory 12 KOTANI Factory 13 NGK Factory 1-4 ph 14 MEIKO Logistic Center I & II 15 TOYOTA Tsusho Service Center 2 8 3 4 31 16 TOSHIBA Factory 17 Electrolux Factory Extension 20 18 TMMP Central Office 19 MAKITA Service Center 30 10 29 35 37 36 7 16 5 18 17 9 15 6 34 11 22 GLIWICE 25 12 14 32 24 13 1 20 TBAI Factory 1-3ph 21 Yamazaki Mazak Show room 33 21 22 Donaldson Factory 1ph 23 SL Factory 1ph & ph2 23 19 24 NGK 2nd Factory 1ph – 2ph 25 MEIKO Logistic Center III 29 Borgers Factory 30 Novoferm Factory st 31 Barry Callebaut Factory 32 TOYO SEAL Factory 33 NGK 3rd Factory 34 MUBEA 1 Factory 35 YAGI Factory 36 AKS Factory 37 SOPP factory 10 Clients from Automotive sector TMMP Gasoline Engine & Transmission Nifco Plastic Parts Factory 1st to 3rd Plant 1st to 4th Place: Wałbrzych Poland Place: Swidnica Poland Investor: Toyota Motor Manufacturing Poland Investor: Nifco Poland Product: Gasoline engine transmission Product: Plastic parts for vehicles Structure: PC + S / F 2 Structure: PC / F 2 Duration: 2000 – 2009 (Ph1-4) Duration: 2007 – 2015 Floor area: 113,253 m2 (including the central Floor area: 18,352 m2 office building) Scope: Design & Construction Scope: Design & Constrction TMIP diesel engine plant 1st to 4th NGK Poland 1st plant 1st to 4th Place: Jelcz-Laskowice Poland Place: Gliwice Poland Investor: Toyota Motor Industries Poland Investor: NGK CERAMICS POLSKA Product: Diesel engine Product: Exhaust filter for diesel engine Structure: PC + S / F 2 Structure: PC + S / F 3 Duration: 2003 – 2008 Duration: 2003 – 2007 Floor area: 52,743 m2 Floor area: 77,761 m2 Scope: Design & Construction Scope: Design & Construction 11 Clients from Automotive sector TBAI (Toyota Boshoku, Aisin Seiki) SL Plastic Parts Factory 1st-2nd Automotive seat plant Place: Nowogrodziec Poland Place: Żory Poland Investor: TBAI Poland Investor: SL Poland Product: Automotive seat Product: Plastic parts Structure: PC / F 1 Structure: PC / F 1 Duration: 2009–2016 Duration: 2013 – 2014 Floor area: 28,475 m2 Floor area: 5,882 m2 Scope: Design & Construction Scope: Design & Construction Donaldson Air conditioning filter plant NGK Poland 2nd plant 1st-2nd Place: Skarbimierz Poland Place: Gliwice Poland Investor: Donaldson Poland Investor: NGK Ceramics Polska Product: Air conditioning filter Product: Exhaust filter for diesel engine Structure: PC / F 2 Ph 2 Structure: PC + S / F 4 Duration: 2013 – 2014 Duration: 2011 – 2016 Floor area: 13,477 m2 Ph 1 Floor area: 23,911 m2 + 23,445 m2 Scope: Design & Construction Scope: Design & Construction 12 Clients from automotive sector Mubea Automotive leaf spring factory NGK Poland third plant Place: Ujazd Poland Place: Gliwice Poland Investor: MUBEA Automotive Poland Investor: NGK Ceramics Polska Product: Automotive steel plate spring Product: Nox sensor Structure: PC / F 2 Structure: PC / F 3 Duration: 2015 – 2016 Duration: 2017 – 2018 Floor area: 23,526 m2 Floor area: 13,700 m2 Scope: Design & Construction Scope: Design & Construction Build of plant for vehicle interiors Yagi bearing factory second term expansion Place: Zlotorja Poland Place: Żarów Poland Investor: Borgers Polska Investor: YAGI POLAND FACTORY Product: Thermal insulation for vehicle interior Product: Bearing Structure: PC + S / F 3 Structure: PC+S / F 1 Duration: 2016 – 2017 Duration: 2017 – 2018 Floor area: 16,510 m2 Floor area: 7,190 m2 Scope: Construction Scope: Design & Construction 13 Clients from automotive sector and other industrial Second stage expansion of steel ball Chocolate candy packing plant factory Place: Żarów Poland Place: Kamienna Góra Poland Investor: AKS Precision Ball Polska Investor: SOPP Packaging Poland Product: Bearing steel ball Product: Chocolate candy packing Structure: PC / F 1 Structure: PC / F 2 Duration: 2016 – 2017 Duration: 2016 – 2017 Floor area: 7,810 m2 Floor area: 8,226 m2 Scope: Design & Construction Scope: Design & Construction Barry Callebaut Chocolate Factory Expansion Place: Łódź Poland Investor: Barry Callebaut POLSKA Product: Chocolate ingredients Structure: PC+S / F 1 Duration:
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages18 Page
-
File Size-