A Copy of the Sunshine Coast Airport Briefing Presentation by CEO

A Copy of the Sunshine Coast Airport Briefing Presentation by CEO

INFRASTRUCTURE ASSOCIATION OF QUEENSLAND PROJECT & INVESTMENT FACILITATION TASKFORCE New runway, new horizons MARCH 2020 Sunshine Coast Airport History Transition to private operator (Palisade Investment Partners) under 99 year lease Terminal agreement with SCC Officially redevelopment 2007 Terminal opened as detailed 2004 Masterplan redevelopment2012 Preliminary work Maroochy adopted by construction 1983 designJetstar phase begins Air New Zealand begins on new runway Airport Sunshine Coast starts Control tower built Early 2021servicesto begins services mid 2021 Council (SCC) End 2021 19612020 2017 2009 2016 1962 1997 2002 Renamed EIS approved First hangar built Current terminal Virgin Blue constructed and Qantas Sunshine Coast begin services Airport New runway, new horizons MARCH 2020 Why More than One of the Game-changing Sunshine Coast Queensland’s expand our 1.3m fastest projects worth expected population fastest growing passengers growingairports $12.5b 580K airport? annually inAustralia beingdelivered by 2041 visitor region New runway, new horizons MARCH 2020 Catchment area Sunshine Coast region Includes Sunshine Coast, Wide Bay SUNSHINE 800k and Moreton Bay North COAST BRISBANE Sunshine Coast greaterregion TOOWOOMBA Includes South East Queensland up to 3.6m Bundaberg and west to Toowoomba New runway, new horizons MARCH 2020 New runway Terminal New runway, new horizons MARCH 2020 redevelopment project Terminal New runway, new horizons MARCH 2020 Timeline & Milestones Terminal Terminal redevelopment Terminal redevelopment detailed redevelopment preliminary design phase construction design phase Early 2021 to starts Until end 2020 mid 2021 End 2021 2020 2021 2022-2023 Terminal Terminal redevelopment redevelopment tender phase 18 months Mid 2021 to 2 years completion End 2023 New runway, new horizons MARCH 2020 Future of More services to New Year round Future the airport current destinations at domestic service to expansion more convenient destinations New Zealand of international NEW SERVICES times service offering New runway, new horizons MARCH 2020 Airport contribution to the gross People who live in the region expected to domestic product (GDP) by year: work directly or indirectly through the Airport: 1 in 1 in every every 500 250 Future of 2018- 2019 2038- 2039 $91m $209m by 2019 by 2040 the airport people are expected to be employed directly JOBS & ECONOMY More than 2000 or indirectly through the airport in 2040 New runway, new horizons MARCH 2020 Average tourism spend Tourism Future of Per domestic flight: Contributed the airport $49,000 $2.5B Per international flight: of Sunshine Coast’s TOURISM $139,000 $15 billion GDP New runway, new horizons MARCH 2020 Current value of Ability to service producers Sunshine Coast as far north as Mackay and agribusiness industry as far west as Longreach $700m Expanded freight capacity facilitated by runway’s ability Future of to service large aircraft the airport Future planned on-site freight facilities to further AGRIBUSINESS expand service offering New runway, new horizons MARCH 2020 Sunshine Coast Airport is the first Australian airport to achieve the highest level under the Airports Council International Airport Carbon Accreditation programme – Level 3+ Neutrality. Sunshine Coast Airport is now recognised around the globe for leading the way in managing carbon emissions and reducing its carbon footprint. Sustainability and environment CO2 24% 11% reduction 50% reduction 9% reduction in 15% reduction reduction in in waste to in lighting electricity in water AUSTRALIA’S FIRST Scope 1 & landfill per energy consumption per consumption Scope 2 carbon passenger requirements passenger CARBON NEUTRAL AIRPORT emissions www.sunshinecoastairport.com.au.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us