WWEC FPEIS Ch 3 Part1.Pdf

WWEC FPEIS Ch 3 Part1.Pdf

Final WWEC PEIS 3-1 November 2008 3 WHAT ARE THE POTENTIAL ENVIRONMENTAL CONSEQUENCES OF CORRIDOR DESIGNATION AND LAND USE PLAN AMENDMENT? 3.1 INTRODUCTION beyond the designated corridors, or by ROWs and projects proposed under the No Action Alternative. 3.1.1 Evaluation of the Environmental Consequences of Corridor Designation The decision to designate specific corridors and Land Use Plan Amendment and to amend land use plans would not approve projects within the corridors, nor would it The PEIS evaluates two alternatives: the require future energy transport projects to be No Action Alternative and the Proposed Action located within these designated corridors. Future Alternative. The Proposed Action will designate energy transport projects may be proposed to energy transport corridors on federal lands and cross federal lands in ROWs that are outside of develop agency policies on how management any designated corridor. Projects crossing state and processing of project-specific applications and private lands would be subject on those on1 designated corridors will be implemented. lands to all applicable state and local The corridors will be designated through environmental regulations, as well as any amendment of land use plans or equivalent stipulations required by the applicable state documents by the affected federal agencies. and/or local authorizing agency. Currently, any requested use of federal lands must demonstrate Chapter 3 describes the nature and condition compliance with all applicable federal, state, and of potentially affected resources in the local regulations in order to use federal land. 11 western states as well as descriptions of the Such compliance is considered during the types of impacts that are typical during the approval process and required prior to use of the construction, operation, and decommissioning of federal land. That process would be unchanged energy transport projects, regardless of project by the designation of the Section 368 corridor. location and in the absence of mitigation. In Section 368 and the designation of energy other words, these are the types of impacts corridors on federal lands do not preempt in associated with clearing a ROW for an energy anyway state authority to make decisions transport project and building, operating, and regarding routes with respect to private and state ultimately decommissioning a pipeline or lands. All projects that propose to use electric transmission line within that ROW. In Section 368 corridors and that also involve state addition to a description of typical project-level and private lands would be subject to all current impacts, Chapter 3 also identifies resource- state and local laws and regulations. Projects specific mitigation measures that may be involving Tribal lands will also need to comply implemented to avoid or minimize project- with current processes for obtaining ROWs on specific impacts. This programmatic analysis is Tribal lands. therefore applicable not only to the federal lands within the corridors, but to federal and It is not possible to identify specific impacts nonfederal lands that might also be affected by from future project development within any specific ROW and project that extends designated corridors without project-specific location and design details. For example, the 1 Shaded text indicates portions of the document effects of a pipeline within a corridor would be that underwent revision between the draft and the different from that of a transmission line; the final PEIS in response to comments received siting of a transmission line on one side of a during the public comment period as well as corridor would differ in its impacts from that a additional information provided by local federal half-mile away but still within a corridor. Thus, land managers and resource specialists. Final WWEC PEIS 3-2 November 2008 the evaluation of environmental consequences 3.1.2 Organization of Chapter 3 presented in this PEIS has focused on those resources most likely to be affected during Information regarding each of the resources future energy transport projects. Since project evaluated in this PEIS is presented as follows. specifics are not known at this time, this analysis Each resource is presented separately. For each takes a programmatic approach. The subsequent resource, a description is presented of the analyses of project-specific environmental resource in the 11 western states that could be impacts would be conducted during project- associated with the two alternatives considered specific NEPA analyses for all projects seeking in this PEIS. Next, a description is provided of ROW authorization within a Section 368 energy the methods used to identify the extent to which corridor. the resource would be associated with each of the alternatives. Next, qualitative and An overview of the energy transport quantitative descriptions are provided of the technologies that could be developed and nature and magnitude of the resource that would implemented in the future, regardless of the be directly associated with each alternative and alternatives, is presented in Appendix G. This thus may be affected by future project appendix also presents an example of a development. A description is then provided of hypothetical set of energy transport projects that the types of impacts that could be incurred by could be developed within a 3,500-foot wide the resource from the construction and operation Section 368 energy corridor. This example of an energy transport project. Resource-specific provides information on the design mitigation measures are also presented that parameters for constructing, operating, and could be used (together with the required IOPs decommissioning several different types of identified in Section 2.4) to minimize, avoid, or energy transport projects. It gives the reader an compensate for project-specific impacts. idea of what future development might look like within a designated corridor and within individual ROWs. 3.2 LAND USE The programmatic evaluation of potential impacts to the environment provides the public 3.2.1 What Are the Federal and Nonfederal and the agencies with useful information for Uses of Land in the 11 Western States? considering the effects of project development under each of the alternatives. The 3.2.1.1 Federal Lands Overview programmatic analyses identifies the types of project activities and resources that would be The federal government owns about considered and evaluated at the project level 653.3 million acres (about 28%) of the land in during permitting and authorization (including the United States (GSA 2005). The majority of project-specific NEPA), construction, and this land is administered by four federal operation, and prepares those involved to agencies: the BLM (261.8 million acres, or address these issues. In addition, these analyses 40.1%), the FS (192.7 million acres, or 29.5%), provide reference materials for later the USFWS (96.3 million acres, or 14.7%), and implementation-level studies and provide the NPS (79.0 million acres, or 12.1%) standard mitigation measures that, together with (BLM 2006d; FS 2006a; USFWS 2006a; the required programmatic IOPs, may be used as NPS 2006b). The DOD manages most of the appropriate during future development to avoid remainder (about 29.2 million acres) or minimize project-specific environmental (DOD 2006). In the western states, the federal impacts. government’s ownership of land is much higher, averaging about one-half of the land (Table 3.2-1). Tables 3.2-2 and 3.2-3 present the Final WWEC PEIS 3-3 November 2008 TABLE 3.2-1 Acreage and Percentage of Public Lands for the 11 Western States as of FY2005 Percent Land State Total State Acreagea Public Land Acreageb Federally Owned Arizona 72,688,000 34,527,965 47.5 California 100,206,720 48,736,912 48.6 Colorado 66,485,760 24,241,592 36.5 Idaho 52,933,120 33,181,787 62.7 Montana 93,271,040 29,567,499 31.7 Nevada 70,264,320 59,564,427 89.8 New Mexico 77,766,400 27,076,008 34.8 Oregon 61,598,720 32,758,177 53.2 Utah 52,696,960 33,813,808 64.2 Washington 42,693,760 13,204,049 30.9 Wyoming 62,343,040 28,100,863 45.1 Total 752,947,840 364,773,087 48.4 a State acreages from GSA (2005). b Tallies include land managed by BLM, FS, NPS, USFWS, and DOD. Sources: BLM (2006d); GSA (2005); NPS (2006b); FS (2006a); USFWS (2006a); DOD (2006). total acreage and percentage of acreage, land to provide realistic test and training respectively, that are managed by the BLM, FS, environments for military operations as required NPS, USFWS, and DOD in the 11 western states by Title 10 (Armed Forces) of the USC. as of FY2005. Maps showing federal land ownership for the 11 western states are provided The designation of energy corridors and land in the State Base Map Series (Volume II, Part 2, use plan amendments under Section 368 could of this document). A complete listing of sites for affect land use on federal lands. The acreages each of the 11 western states is presented by and land uses that could be affected are agency in Appendix M. discussed in Section 3.2.3. Each of the federal agencies manages its lands and resources according to its mission and BLM. The BLM was created in 1946 by responsibilities. BLM and FS lands are managed merging two agencies, the General Land Office for recreation, timber harvesting, livestock and the U.S. Grazing Service. The agency grazing, oil and gas production, mining, currently manages 261.8 million acres of land, wilderness protection (e.g., water and wildlife about 11% of the U.S. land area. Lands managed habitat), and other purposes. The NPS manages include grasslands, forests, high mountains, lands for the conservation, preservation, Arctic tundra, and deserts. These lands are often protection, and interpretation of the nation’s intermingled with other federal or private lands.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    51 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us