New Railways

New Railways

C. WORKS IN PROGRESS · Doubling of Indore – Dewas – Ujjain Section. · Berawanya- Nagda Road Over Bridge in lieu of LC No. 102. · Naikheri-Ujjain Road Over Bridge in lieu of LC No. 23. INDIAN RAILWAYS · Platform Extension at Badnagar (PF No. 1 & 2 ) Developmental Works - Some Glimpses Out to Out FOB at Ujjain Station NEW RAILWAYS Retiring Room at Ujjain Station A progressive journey since 2014 MADHYA PRADESH ON FAST TRACK DEVELOPMENT : 2014-PRESENT INPUTS BY RAILWAY IN UJJAIN PARLIAMENTARY CONSTITUENCY INFRASTRUCTURE ENHANCEMENT: UJJAIN PARLIAMENTARY CONSTITUENCY v New Line Projects A. ASSEMBLY SEGMENTS o New Line Projects of 521 Kms for ₹ 8646 Crore sanctioned since 2014. Mahidpur, Nagda/Khachrod, Ghatiya, Tarana, Badnagar, Ujjain Dakshin, Alot, Ujjain Uttar o New Line increased from 4 Km/Year in 2009-14 to 25 Km/Year in 2014- B. WORKS COMPLETED IN LAST SEVEN YEARS 2021 i. e. +525% B1. Infrastructure Enhancement · Commissioning of Double Line between Vikram Nagar to Karchha th v Doubling/Tripling/4 Line Projects · Commissioning of New Station Building at Vikram Nagar and Karchha Stations. o Doubling/Tripling/4th Line Projects of 1754 Kms for ₹ 19257 Crore · Commissioning of Gauge Conversion between Fatehabad – Ujjain Section. sanctioned since 2014. · Doubling of Gambhiri Bridge in Nagda – Ujjain Section o Doubling/Tripling/4th Line increased from 7 Km/Year in 2009-14 to 60 · 06 Road Over Bridges commissioned in/around Ujjain. Km/Year in 2014-2021 i. e. +757% · 26 Level Crossings Closed – Construction of Road Under Bridge/ Limited Height Subway. · 579.14 KW Roof Top Solar Plant at 05 Stations/ Locations. v Electrification Projects B2. Improvement in Passenger Amenities o Electrification Projects of 2539 Kms for ₹ 2222 Crore sanctioned since · Platform Extension of PF No. 4,5 and 8 at Ujjain Station and PF No. 4 and 5 at Nagda Station. 2014. · High Level Platforms, Ladies and Gents Toilets and Cover Over Platforms at Vikram Nagar o Electrification increased from 64 Km/Year in 2009-14 to 201 Km/Year in and Karchha Stations. 2014-2021 i. e. +214% · New platforms with various passenger amenities like Booking Office, Cover Over Shed, o 96.62 % - 4203 Route Kms in Madhya Pradesh has been Electrified. Drinking Water, Foot Over Bridge, Toilets, Circulating Area etc; provided at Chintaman Ganesh, Lakodha and Fatehabad, Chandrawatiganj Stations after Gauge Conversion. · Commissioning of Quick Coach Watering System at PF No. 1, 2, 5 and 6 at Ujjain Station. v Rail Fly Over Projects · 02 Escalators and 05 Lifts commissioned at Ujjain Station. o Rail Fly Over Projects of 74 Kms for ₹ 2174 Crore sanctioned since 2014. · Platform Raising of PF No. 4,5 at Nagda and PF No. 1 at Berchha station. · Construction of New Foot Over Bridge at Nagda, Ujjain, Vikram Nagar, Karchha and PASSENGER AMENITIES: Badnagar Stations and Extension of Existing Foot Over Bridge at Ujjain and Nagda Stations. v Cover Over Platforms · 03 Nos. Automatic Ticket Vending Machines (ATVM) commissioned at Ujjain station. v Foot Over Bridges · Water Filtration System commissioned at “D & E” category Railway stations under CSR by M/s. YES Bank Ltd, Mumbai. v Washable Aprons · Commissioning of New AC Waiting Hall (Ladies) at Ujjain station. v Lifts & Escalators · Wi-Fi System installed at Ujjain, Nagda, Runja, Badnagar, Runkhera, Khachrod, Badnagar, v Extension and Raising of Platforms Nagda, Piploda Bagla, Unhel, Palsora Makrawan, Naikheri, Pingleshwar, Tarpur, Tarana v Wi-Fi Facility Road, Chintaman Ganesh Stations. v Automatic Ticket Vending Machines · Toilet block provided at Ujjain, Nagda, Naikhedi, Palsodamakarawan, Pinleshwar, v Coach Guidance Systems Piplodabagla, Runija, Runkheda, Unhel, Tajpur, Vikramnagar, Nauganwan, & Taranarod v Water Vending Machines Stations. · Waterless Toilet has been installed at Ujjain station. v LED Lights at Stations · 100ft monumental flag at Ujjain and Nagda station. · Old Electro-Mechanical Tower Clock has been replaced with GPS Clock at Ujjain station and SAFETY – OUR PRIME CONCERN: New GPS Clocks at Karchha, Chintaman Ganesh and Vikram Nagar Stations. st v Use of Drone by WCR in Madhya Pradesh for the 1 time in India for Disaster · Parcel Management System commissioned at Nagda station. Management, Crowd Management and Project Monitoring etc; · Coach Guidance Boards commissioned at PF No. 4 & 5 of Ujjain station. v Use of GPS Trackers for Patrolling and Monitoring by WCR in Madhya Pradesh · Single line Double Face Train Display Board installed at Ujjain station on Foot Over Bridge for the 1st time in India. (Nagda-end). · Online Train Reservation Charting System and Train Running Information on TV provided at Nagda and Ujjain Station · Multiline Display Boards commissioned at Ujjain station. · Digital Museum provided at Ujjain station. · CCTV Commissioned at Nagda station .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us