Andhra Pradesh Cases Currently Pending with Moef

Andhra Pradesh Cases Currently Pending with Moef

The cases which have been processed by State Government but pending for Environment Clearances- as on 29.08.2016. State S. Name of the Mineral Area Village and Dist. Date of Letter of Date of Date of Date of Date of Presently Action No. Applicant (Hect.) Approval Intent issue of Public submission Grant of case required and under 5(1) issued, if Term of hearing, if of EC, if pending timeline , if non- Reference, conducted EIA/EMP, granted with agreed. scheduled scheduled if issued if submitted mineral mineral Andhra Pradesh Cases currently pending with MoEF. Andhra Pradesh Final TOR presentation issued by on 22.8.2016 Govt. MoEF, of which the Kachavaram & Memo GOI vide objection Inuparajupalli No.14499 letter M/s. Shree 29.10.201 has been 1 Limestone 283.59 Villages of - /M.II(2)/2 No.J- - - MoEF Cement Ltd 5 complied. Karempudi Mandal, 009-3, 11015/14 Awaiting Guntur District dt.19.05.2 3/2014- final 010. IA.II(M), approval dt.12.08.2 order from 014 MoEFCC TOR issued by Final Govt. MoEF, presentation Memo GOI vide has been M/s My Gamalapadu No.14722 letter done. Home Village, Dachepalli 24.04.201 2 Limestone 374.58 - /M.III(2)/ No.J- - - MoEF Awaiting Industries Mandal, Guntur 5 2012-4, 11015/81/ final Ltd District dt.16.04.2 2013- approval 013. IA.II(M), order from dt.16.07.2 MoEFCC 013 Public Govt. Dhanawada, hearing Memo Chinnakomerla etc., Scheduled No.16073 M/s A.C.C. 997.08 Villages, 30.11.201 for 9.9.2016. 3 Limestone - /M.III(1)/ -- - - MoEF Limited 0 Hects Mylavaram 5 After 2006-1, Mandal, Kadapa submissions dt.22.06.2 District EC is to be 010. expedited. EC granted Shree Jai on 23.11.201 01.05.201 17.12.201 12.01.201 4 Jyoti Limestone 149.39 Palkur village, DEIAA 16.08.2016. 2 4 5 6 Cement CFE applied to SCPB Public M/s. Letter of hearing Emmami 521.69 Tangeda Village, 5 Limestone - Intent MoEF completed Cements 1 Guntur District. issued. on Limited 21.06.2016, date of final presentation required from MoEF 1.8.2016 Also delayed by court case. MP approved for original area but now to Original be revised. M/s India Chilamakur, LoI in 6 Limestone 471.2 - MoEF The area Cement Ltd. Kadapa Dist. 13.09.199 reduced to 6 413 ha. EC application submitted on 1.8.2016. to be expedited. 2014 Public hearing Scheduled M/s 95.368 Sadiparalla, 29.10.200 9.9.2016 State for 9.9.2016. 7 Raghuram Limestone - Ha Kadapa Dist. 8 (sch) Level After Cement submissions EC is to be expedited. 2014 Public hearing Scheduled M/s 206.14 Yerraguntalla, 29.10.200 9.9.2016 State for 9.9.2016. 8 Raghuram Limestone - 4 Ha Kadapa Dist. 8 (sch) Level After Cement submissions EC is to be expedited. Cases pending with State Government. AP The mining plan already Letter of approved. The Sri J. Krishna Vermiculi Utukuru Village, 1 4.33 - Intent DEIAA District Mohan te Nellore District issued. administration may be asked to expedite. EC granted on Shree Jai 01.05.201 17.12.201 16.08.2016. 2 Limestone 149.39 Palkur village, 23.11.2012 12.01.2016 SPCB Jyoti Cement 4 5 CFE applied to SCPB TOR granted, Project BeachSan Ranastalam, 15.01.201 EIA EMP 3 M/s APMDC 1284 - Propone d Srikakulam 0 under nt preparation 4 M/s APMDC BeachSan 1000 Dharmavaram, 10.12.09 - Project TOR granted, d Srikakulam Propone EIA EMP nt under preparation TOR granted, Project BeachSan EIA EMP 5 M/s APMDC 1049 Etcherla, Srikakulam 23.11.09 - Propone d under nt preparation Delayed due to court cases. Mining Plan Original submitted on LoI in 2008 Project M/s Ramco 267.30 Jayanthipuram, 27.7.2016 and 6 Limestone - and revised Propone Cement Ltd. Ha Krishna District EC application LoI on nt yet to be 20.04.2016 submitted in 1st week of September. Chhattisgarh Cases currently pending with MoEF. 1. M/s Jaisawal Limestone 159.669 Parsabhader, Kokdi, - 08.02.2011 - - - - MoEF for Pending with Neco Ltd. Balodabazar issuing TOR MoEF for final order. MoEF to expedite by16.08.2016. 2. M/s Ultratech Limestone 689.048 Mohrenga, Murra, - 19.04.12 28.3.13 18.9.15 28.2.16 - MoEF for Final presentation Cement Ltd. Raipur EC Order has been done on Raipur 25.4.16. Pending with MoEF for final order. MoEF to expedite by16.08.2016. 3. M/s Ultratech Limestone 157.122 Guma, Balodabazar - 17.11.2009 16.9.13 10.2.16 8.6.15 - Final EIA Final presentation Cement Ltd. (Draft) & EMP has been done on Raipur submitted 21.07.2016. to MoEF. Pending with MoEF for final order. MoEF to expedite by16.08.2016. 4. CMDC/ Iron Ore 646-596 Deposit No. 4, 30.11.11 - 12.8.14 7.12.15 28.3.16 - MoEF Pending with NMDC Dantewada MoEF, Delhi for formal order. MoEF to expedite by16.08.2016. 5. CMDC Bauxite 99-35 Pathrai, Sarguja 7.3.13 - 17.4.15 5.12.15 - - MoEF Final Delhi Presentation has to fixed by MoEF. MoEF to expedite by16.08.2016. 6 M/s MECL Bauxite 257.923 Serangdag, Sarguja 17.12.03 1.03.16 8.07.16 MoEF Pending with MoEF for fixing date for presentation. MoEF to expedite by16.08.2016. Cases pending with State Government. 1 M/s MSP Steel Limestone 398.260 Acholi, Durg - 01.02.2011 20.09.2011 - 15.04.2011 - RH, CECB SG to expedite by and Power Ltd. and Collector 16th AUG 2016. Durg for public hearing. 2 M/s Emami Limestone 35-864 Dhandhani, Balodadbazar - 5.09.2014 28.10.15 - Not submitted - Company Preparation of Pepar Mills Ltd, 4.4.16 Draft EIA / EMP (Revised) is pending company. SG to expedite by 16th AUG 2016. 3 M/s Monet Ispat Limestone 278-144 Gaitra, Balodabazar - 03.11.2009 17.2.16 - Not submitted - Company Preparation of & Enargy Ltd. 30.9.2013 Draft EIA / EMP Raipur (Revised is pending area) company. SG to expedite by 16th AUG 2016. 4 M/s Monet Ispat Limestone 252-552 Posri and Guma, - 5.10.2010 17.2.16 - Not submitted - Company Preparation of & Enargy Ltd. Balodabazar 30.9.2013 Draft EIA / EMP Raipur (Revised is pending area) company. SG to expedite by 16th AUG 2016. 5 M/s SKS Ispat & Lime Stone 299-751 Lohrabodh, Bilaspur - 13.10.08 29.07.11 - - - Company Absent in Revue power Ltd. Meeting Dated Raipur 02.06.2016. SG to expedite by 16th AUG 2016. 6 M/s Navbharat Iron Ore 220-00 Rasuli, Kanker 24.09.08 - 13.2.15 - - - CECB to fix Paper submitted Fuse Company date for on 1.6.16 for Ltd. Raipur Public public hearing. Hearing SG to expedite by 16th AUG 2016. 7 Shree Bajarang Iron Ore 57-00 Chotedongar, Bastar 13.04.11 - 15.3.16 - - - company Data collection power Ispat Ltd. for EC is under Raipur process. SG to expedite by 16th AUG 2016. 8 M/s Arti Sponge Iron Ore 31-55 Alnar, Dantewada 21.04.11 - 9.9.2015 - - - Company Data collection Ltd. completed, report has to be submitted. SG to expedite by 16th AUG 2016. Gujarat Cases currently pending with MoEF. 1 UltraTech Limestone 193.32.6 Bhavnagar -- 04.06.200 -- 15.06.201 -- -- MoEF Pending with Cement Ltd 9 (Bambhor, Talli) 1 6 MoEF for giving date for final presentation EIA submitted on 16.08.2016 2 UltraTech Limestone 670.48.2 Bhavnagar (Kotda, -- 04.06.200 -- 15.06.201 -- -- MoEF Pending with Cement Ltd 6 Dayal, kalsar) 1 6 MoEF for giving date for final presentation EIA submitted on 16.08.2016 3 UltraTech Limestone 851.32.1 Bhavnagar -- 21.07.199 -- 16.06.201 -- -- MoEF Pending with Cement Ltd 3 (Methda,Madhuvan, 9 6 MoEF for Zanzmer, Rajpara, giving date Saliya, Gadula) for final presentation EIA submitted on 16.08.2016 4 Indo Rama Limestone, 891.71.8 Rohina, Balana, -- 08.02.200 Applied -- -- -- MoEF Pending with Cement Ltd Marl 5 Vadhera Dist:- 6 MoEF for (Heidelberg Amreli issue of TOR. Cement India The decision Ltd) in regard to change of name is to be taken by SG for further processing of EC and MP. MoEF to expedite by16.08.2016. 5 M/s Nirma Limestone 616.725 Padhiyarka & -- 15.02.200 EC applied MoEF Presentation Ltd. 4 Doliya, Dist: 8 in 2009 on 24.06.2016 Bhavnagar in 6th meeting 6 M/s Nirma Limestone 1225.85 Vangar& Madhiya, -- 15.02.200 EC applied MoEF of EAC to Ltd. 53 Dist: Bhavnagar 8 in 2009 submit a 7 M/s Nirma Limestone 1489.47 Gujarda & Dudheri, -- 15.02.200 EC applied MoEF revised plan Ltd. 01 Dist: Bhavnagar 8 in 2009 by reducing the area according to the resource requirement.C omplaince report submitted on 13.07.2016, revised TOR awaited. Cases pending with State Government. 1 UltraTech Limestone, 14.20.45 Babarkot Dist:- -- 04.02.201 15.03.2013 -- -- -- SPCB Presentation Cement Ltd Marl Amreli 2 pending before the EAC. It is also Pending for seeking relaxation under Section 6(1) (b) by the SG. To be sent CG by 5 aug 2016. 2 UltraTech Limestone, 49.84.54 Babarkot Dist:- -- 04.02.201 15.03.2013 -- -- -- SPCB Presentation Cement Ltd Marl Amreli 2 pending before the EAC. It is also Pending for seeking relaxation under Section 6(1)(b) by the SG.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us