Northern Region Dot & Pf Design Project Summary

Northern Region Dot & Pf Design Project Summary

NORTHERN REGION DOT & PF DESIGN PROJECT SUMMARY CONSTRUCTION BEYOND 2009 Highway Aviation Facility Est Value Est Value Est Value Community # of Pjs Thousands # of Pjs Thousands # of Pjs Thousands Allakaket 1 $4,600.0 Alaska Highway 3 $34,600.0 Ambler 1 $1,500.0 1 $9,500.0 Barrow 1 $7,000.0 Chalkyitsik 1 $9,800.0 Coldfoot 1 $6,450.0 Cordova 1 $5,000.0 2 $14,000.0 Dalton Highway 4 $131,000.0 Delta Jct. 1 $6,000.0 Edgerton Hwy/McCarthy Road 2 $11,200.0 Elliott Highway 1 $9,200.0 Emmonak 1 $6,500.0 Fairbanks 5 $64,150.0 Fort Yukon 1 $11,000.0 Galena 1 $5,500.0 Glenn Highway 1 $20,300.0 Golovin 1 $6,000.0 Gulkana 1 $1,900.0 Holy Cross 1 $9,000.0 Huslia 1 $6,900.0 Kaltag 1 $5,000.0 Kotzebue 2 $21,000.0 Lake Minchumina 1 $5,000.0 Noatak 1 $13,600.0 Nome 1 $8,400.0 Nulato 1 $4,000.0 Nunam Iqua (Sheldon Pt.) 1 $14,700.0 Parks Highway 2 $51,600.0 Pilot Station 1 $13,000.0 Richardson Highway 10 $146,800.0 Ruby 1 $6,300.0 Selawik 1 $5,000.0 St. Mary's 1 $15,300.0 St. Michael 1 $7,500.0 Stebbins 1 $3,000.0 Steese Hwy 1 $16,200.0 Taylor Highway 1 $38,500.0 Tok Cutoff 1 $7,700.0 White Mountian 1 $3,600.0 Total Communities Total Projects 36 $557,650.0 27 $209,650.0 0 $0.0 GRAND TOTAL 63 $767,300.0 ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION DESIGN PROJECTS CONSTRUCTION BEYOND 2009 ALLAKAKET ALLAKAKET AIRPORT IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $4,600.0 Scope: Repair and stabilize the runway embankment and apron to correct settlement areas. Status: Design underway. ALASKA HIGHWAY ALASKA HIGHWAY MP 1222 TO 1235 REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $16,100.0 Scope: Rehabilitate, resurface and improve drainage. Status: Design underway. ALASKA HIGHWAY MP 1354 TO 1364 REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $6,500.0 Scope: Rehabilitate, resurface and wayside improvements. Status: Design underway. ALASKA HIGHWAY MP 1412 TO 1422 REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $12,000.0 Scope: Rehabilitate, resurface and improve drainage. Status: Design underway. AMBLER AMBLER SEWAGE LAGOON ACCESS ROAD Estimated Bid Date: TBD Estimated Construction Cost: $1,500.0 Scope: Construct a new access road to the sewage lagoon. Status: Design underway. AMBLER AIRPORT REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $9,500.0 Scope: Extend and widen main and crosswind runway. Resurface operational surfaces. Status: Design underway. 1 ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION DESIGN PROJECTS CONSTRUCTION BEYOND 2009 BARROW BARROW AIRPORT APRON EXPANSION Estimated Bid Date: TBD Estimated Construction Cost: $7,000.0 Scope: Expand apron and construct aviation support areas. Status: Design underway. CHALKYITSIK CHALKYITSIK AIRPORT IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $9,800.0 Scope: Rehabilitate runway and taxiway and apply dust palliative. Status: Design underway. COLDFOOT COLDFOOT AIRPORT EROSION CONTROL Estimated Bid Date: TBD Estimated Construction Cost: $6,450.0 Scope: Protect runway and access road from erosion from the Koyukuk River. Status: Design underway. CORDOVA CORDOVA SHEPARD PT. ROAD Estimated Bid Date: TBD Estimated Construction Cost: $32,000.0 (for entire facility) Scope: Status: DOT&PF will provide $5,000,000 toward construction once the Oil Spill Response Facility has been designed and funding secured. CORDOVA AIRPORT RUNWAY SAFETY AREA IMPROVEMENTS (Drainage) Estimated Bid Date: TBD Estimated Construction Cost: $5,500.0 Scope: Rehabilitate the runway safety areas including grading and drainage improvements. Status: Design underway. 2 ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION DESIGN PROJECTS CONSTRUCTION BEYOND 2009 CORDOVA AIRPORT APRON, TAXIWAY and GA IMPROVEMENTS STAGE II Estimated Bid Date: TBD Estimated Construction Cost: $8,500.0 Scope: Construct transient air parking, general aviation parking, improve access roads, and complete obstruction removal. Status: Design underway. DALTON HIGHWAY DALTON HIGHWAY MP 9 MILE HILL NORTH Estimated Bid Date: TBD Estimated Construction Cost: $22,000.0 Scope: Reconstruct and realign 3 miles of highway to remove excessive grades and curves. Status: Design underway. DALTON HIGHWAY MP 11 TO 18 RECONSTRUCTION Estimated Bid Date: TBD Estimated Construction Cost: $15,000.0 Scope: Reconstruct, widen and pave seven miles of highway. Status: Design underway. DALTON HIGHWAY MP 175 TO 209 REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $43,000.0 Scope: Rehabilitate, resurface and replace the Marion Creek Bridge. Status: Design underway. DALTON HIGHWAY MP 362 TO 414 REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $51,000.0 Scope: Rehabilitate, resurface, and widen 42 miles of highway. Status: Design underway. DELTA JUNCTION CUMMINGS ROAD CONNECTOR Estimated Bid Date: TBD Estimated Construction Cost: $6,000.0 Scope: Construct a 5 mile road from Barley Way to Cummings Road to bypass flooding sections. Status: Design underway. BIA contributing $2,000,000 toward the project. 3 ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION DESIGN PROJECTS CONSTRUCTION BEYOND 2009 EDGERTON HWY/McCARTHY ROAD EDGERTON HWY/McCARTHY ROAD PERMANENT FLOOD REPAIRS (various locations) Estimated Bid Date: TBD Estimated Construction Cost: $1,200.0 Scope: Repair damage caused by October 2006 flooding (embankment, drainage, resurfacing). Status: Design underway. EDGERTON HWY/McCARTHY ROAD PERMANENT FLOOD REPAIRS (Kotsina Bluff) Estimated Bid Date: TBD Estimated Construction Cost: $10,000.0 Scope: Repair damage caused by October 2006 flooding at Kotsina Bluff (embankement, resurfacing, drainage, and minor road re-alignment). Status: Design underway. ELLIOTT HIGHWAY ELLIOTT HIGHWAY MP 108 TO 120 REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $9,200.0 Scope: Reconstruct the highway between MP 108 and 120. Status: Design underway. EMMONAK EMMONAK AIRPORT IMPROVEMENTS STAGE II Estimated Bid Date: TBD Estimated Construction Cost: $6,500.0 Scope: Expand existing apron and taxiway and resurface operational surfaces. Status: Design underway. FAIRBANKS AIRPORT WAY INTERSECTION IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $6,150.0 Scope: Construct intersection improvements along Airport Way. Status: Design underway 4 ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION DESIGN PROJECTS CONSTRUCTION BEYOND 2009 CHENA PUMP/SMALL TRACTS SAFETY IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $5,000.0 Scope: Widen Chena Pump Road from Palo Verde to Despain Lane including a new bridge. Status: Design underway. COLLEDGE ROAD REHABILITATION (Univ. to Danby) Estimated Bid Date: TBD Estimated Construction Cost: $5,800.0 Scope: Rehabilitate the pavement on College Rd. between University Ave. and Danby. Status: Design underway. UNIVERSITY AVE. WIDENING Estimated Bid Date: TBD Estimated Construction Cost: $46,000.0 Scope: Widen University Ave. to 5 lanes, replace bridge and improve intersections. Status: Design underway. NORTH POLE INTERCHANGE PEDESTRIAN FACILITIES Estimated Bid Date: TBD Estimated Construction Cost: $1,200.0 Scope: Construct pedestrian facilities along St. Nicholas Dr. Status: Design underway. FORT YUKON FORT YUKON AIRPORT IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $11,000.0 Scope: Resurface and apply dust palliative on operational surfaces, and improve drainage. Status: Design underway. GALENA GALENA CAMPION ROAD EROSION PROTECTION Estimated Bid Date: TBD Estimated Construction Cost: $5,500.0 Scope: Relocate 2 miles of Campion Rd. to avoid river erosion and install new large diameter culverts. Status: Design underway. 5 ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION DESIGN PROJECTS CONSTRUCTION BEYOND 2009 GLENN HIGHWAY GLENN HIGHWAY MP 172 TO 189 REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $20,300.0 Scope: Rehabilitate and resurface. Status: Design underway. GOLOVIN GOLOVIN AIRPORT IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $6,000.0 Scope: Resurface and widen runway and taxiway. Status: Design underway. GULKANA GULKANAN AIRPORT APRON AND TAXIWAY REPAVING Estimated Bid Date: TBD Estimated Construction Cost: $1,900.0 Scope: Reconstruct the apron and taxiway pavement. Status: Design underway. HOLY CROSS HOLY CROSS RUNWAY REHABILITATION Estimated Bid Date: TBD Estimated Construction Cost: $9,000.0 Scope: Raise grade, install new lighting, and resurface all operational surfaces. Status: Design underway. HUSLIA HUSLIA AIRPORT IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $6,900.0 Scope: Rehabilitate the safety area and resurface runway, taxiway and apron. Status: Design underway. 6 ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION DESIGN PROJECTS CONSTRUCTION BEYOND 2009 KALTAG KALTAG AIRPORT IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $5,000.0 Scope: Resurface runway, reconstruct taxiway and apron, and apply dust palliative. Status: Design underway. KOTZEBUE KOTZEBUE AIRPORT 17-35 RESURFACING Estimated Bid Date: TBD Estimated Construction Cost: $6,600.0 Scope: Resurface runway, install new lighting, expand runway safety area and apply dust palliative. Status: Design underway. KOTZEBUE GENERAL AVIATION APRON IMPROVEMENTS Estimated Bid Date: TBD Estimated Construction Cost: $14,400.0 Scope: Improve apron to

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us