Railway Transportation Systems

Railway Transportation Systems

Railway Transportation Systems Railways • Urban Railways • Monorails Building a Better World Railway for Future Transportation Generations Systems Railways • Urban Railways • Monorails Show Video Mission Services To Provide World-Class Management, Engineering, Procurement & Construction Services Through People & Organizational ■ Project Development Development to Improve the Quality of Life ■ Project Management ■ Engineering Values ■ Procurement ■ Respecting People, Their Values & Rights ■ Construction ■ Observing Professional Ethics and Adhering to all Obligations ■ Financing ■ Commitment to Health, Safety and Environment ■ Investment ■ Commitment to Providing Desired Quality ■ Operation and Maintenance ■ Cherishing Creativity, Initiative and Innovation Culture ■ Promoting Continual Technical & Managerial Improvements ■ Commitment to Win-Win-Win Relationship Divisions Civil Water and Wastewater Railway Transportation Systems Housing and Buildings Oil, Gas and Industry ■ Ports & Harbors ■ Dams ■ Railways ■ Mass Housing ■ Refineries & Petrochemical Plants ■ Airports ■ Water Transfer and Diversion Tunnels ■ Urban Railways ■ Residential Complexes ■ Pumping & Compressor Stations ■ Roads, Elevated Highways & Tunnels ■ Irrigation and Drainage Networks ■ Monorails ■ Townships ■ Power Generation Plants, Power ■ Bridges ■ Water and Wastewater Treatment Plants ■ Infrastructure Facilities & Landscaping Transmission & Substations ■ Water Transmission Lines ■ Commercial & Office Complexes ■ Industrial Manufacturing Plants ■ Sewerage Collection and Transmission ■ Sports, Recreational, Cultural & Medical Facilities ■ Pipelines & Tank Farms Lines (by Pipejacking Method) ■ Gas Injection Projects Health, Safety and Environmental Policy Quality Policy As a general contractor, Kayson is committed to safeguarding the health and safety In Concern with our Mission and to Achieve our Vision and Objectives, with of its staff and other stakeholders (such as a subcontractors, partners, neighbors, Observing Values and Adhering to all Specifications and Requirements Agreed visitors, etc.) and protecting the environment. upon in Contracts, National and International Regulations and Standards, with all Staff Involvement, Kayson is committed to: To achieve these goals, all levels of the organization and subcontractors shall adhere to the following commitments: ■ Continual Monitoring and Improvement in Quality of Design and Construction of Projects ■ Creating a safe and healthy workplace ■ Continual Improvement of Efficiency and Effectiveness of Processes ■ Minimizing the impact on the environment based on Results of Audits, Evaluations and Performance Measurements ■ Minimizing disruption in the daily life of people and society and Organizational Improvement Management Feedbacks ■ Complying with legal requirements (local, national and ■ Ensuring Efficient Provision and Allocation of international), and clients’ HSE requirements Resources to Execute Processes Effectively ■ Formulating, updating, and implementing suitable and creditable ■ Empowering, Developing and Enhancing Knowledge of Employees and models for the Company’s HSE management system Increasing their Involvement in the Effective Development and Implementation ■ Providing training for managers and supervisors and securing their of Management Systems and Knowledge and Experience Transference active participation in the implementation of basic HSE principles ■ Understanding and Meeting Stakeholders’ Requirements and ■ Training and encouraging personnel at all levels of the organization Expectations based on Sustainable Development and Mutual Benefit and obliging them to abide by basic HSE principles ■ Providing training for subcontractors and obliging them to comply with basic HSE principles ■ Recording, investigating, researching near misses, accidents and hazards and their causes in order to eliminate them, and, if not possible, minimize the possibility of their recurrence ■ Continually improving the performance of the company’s HSE management system National Commitment World-Class Construction ■ Poldasht Irrigation & Drainage Network ■ Ray – Ideloo 346 Km, 16” Oil Pipeline ■ Sattarkhan (Ahar) Clay Core Earth Dam & Related Facilities ■ East Anzali Wastewater Treatment Plant ■ Foomanat (D1) Irrigation and Drainage Network ■ Siah Bishe Pumped Storage Project Upper & Lower Dams ■ Neka-Ray Crude-Oil Pipeline Pumping Stations and Related Installations ■ Aliabad Katoul-Shahrood 70 km, 16” Gas Pipeline Poldasht Minsk New City Center ■ ■ Rehabilitation and Widening of Bishkek-Osh Road Ahar ■ Al-Teymour (Mashhad) Wastewater Treatment Plant ■ Establishment of Khorasan Steel Iron-Ore Concentrate Tabriz Anzali Production Plant Lahijan Neka Mashhad ■ Petroleum Tanks of Torbateh Hydarieh City Siah Bishe Shahrood Prilesie Logistic Center ■ ■ Hamedan Sewerage Project by Pipe-Jacking Tehran Torbateh Hydarieh Method Saveh ■ ■ Qom 7200 Tonne/Day Saveh Grey Cement 1,920-Unit Housing Project, ■ Kermanshah 4,920–unit Housing Plant, Production Lines Baghdad Project Kermanshah ■ Hamedan National Qom Monorail System Line 1, Phase 1&2 ■ ■ Frolikova 200-Unit Housing ■ 400-Unit Cement Factory Workers Doroud Esfahan – Foolad Shahr Highway Residential Complex of Doroud City (Section II) Shahin Shahr Highway Project Esfahan ■ Dualization of Shabnam-Moshk & Sasan- Ahwaz Arjang Railways ■ Al Kifil Water Treatment Plant Marvdasht Belarus and Irrigation Network Project ■ East Ahwaz Wastewater Treatment Plant Aghajari ■ Kyrgyzstan ■ Ahwaz Urban Railway Project Rafsanjan Goyom – Marvdasht 27 Km,16” Gas Farashband Iraq ■ 1505-Unit Ahwaz Teachers’ Residential Complex Pipeline Construction of Akuetom- ■ ■ Hamidieh-Qods Plain Irrigation and Drainage Network India ■ Rafsanjan Sports & Cultural Complex Mocomo- Djibloo- Bizam road ■ Shirin Shahr Township Civil Works & Infrastructural Sirjan Oman Tonbak ■ Esfahan – Rafsanjan 232 Km, 16” Oil in D’Anisok district Cameroon Installations Assaluyeh Pipeline Venezuela ■ Equatorial Bandar Abbas – Rafsanjan 104 Km, 26” ■ Bandar Abbas Oil Pipeline Guinea Al Nasseriya Water Treatment Plant ■ Aghajari Gas Injection Project and Irrigation Network Project ■ South Pars Gas Field Development, Phase 12 (EPC2) ■ Golgohar Pelletizing Plant Construction of Sangmelima to ■ Bikoula Road ■ Almahdi Aluminum ■ ■ Civil & Underground Works in Olefin Plant-Bushehr Petrochemical Co. Complex Atlas Plaza Commercial Complex ■ Iraqi Airways’ Cargo Village in ■ 4th Aromatics Plant, Process Area ■ Honar Lake ■ ■ Bridge Across the Wadi Bani ■ Baghdad Construction of Sabalan Petrochemical Methanol Project ■ Farashband Gas Tehran Sewerage Pipeline Project via Pipejacking ■ Iraqi Airways’ Aircraft Training ■ South Pars, Phases 4 & 5 Site Preparation Method Souq in Wilayat Rustaq Refinery Processing Unit ■ Center in Baghdad ■ South Pars Field Development Project, Phases 2 & 3, Site Preparation ■ Parand New City 16,080–unit Housing Project Khasab to Al-Khalidyeh Road Development Plan ■ Widening & Strengthening ■ Civil Work South Pars Gas Field Development Phase-1 Plant ■ Tehran Book Garden 10,000-Unit Housing Project ■ of Andhra Pradesh State ■ Sattarkhan Great Mall Highway (APSH9) ■ Planning System & Project Control of Tehran Metro, Lines 1 & 2 ■ Amir Kabir Commercial Complex ■ Amir Kabir Underground Motorway ■ Imam Khomeini International Airport ■ Navab Residential Complex ■ Yadegar Imam Flyover 10,008-Unit Housing Project ■ ■ Central Fruit & Vegetable Market of Tehran (Phase 2) ■ Afsarieh Interchange ■ Parand 552-Unit Residential Complex ■ Drilling and Grouting Operations of Tehran Metro Tunnel, Lines 1&2 ■ Transfer Canals of Tehran's Subsurface Waters to Varamin and Rey Plain ■ Sorkhe-Hessar & Valfajr Water Canals Ahwaz Urban Railway Project Project Outline Unique Features of the project The population of Ahwaz city, the capital ■ The first national railway joint of Khuzistan Province, which according to venture project, fully executed a census conducted in 2006 stood at 1.38 as an EPC contract, under the million, is forecasted to reach 1.6 million in leadership of a private company 2021. The city will, therefore, urgently need ■ Great risks due to high levels modern transportation systems, particularly underground water urban railway networks, in order to retain its ■ Passage of railway beneath position as a leading agricultural, industrial the Karun Riverbed Client: Ahwaz Municipality, Ahwaz Urban and educational center. Fulfillment of this ■ Existence of huge underground Railway Organization project reduces urban traffic congestion and infrastructure facilities in the excavation Partner: Norinco of China air pollution thereby provides comfort and route such as water and oil pipelines EPC (Engineering, Type of Contract: welfare for all citizens. Saving in expenses of ■ Variety and complexity of Procurement & Construction) journeys within the city and offering the most geological structure in the route Contract Period: 48 months effective and safest transportation system are ■ Passing through and constructing Location: Ahwaz City, Capital of the other advantages of this project. stations in the commercial center Khuzistan Province and city’s most populated regions Status: Under Construction Traffic models carried out for Ahwaz city provide for four lines. The first line will carry Key Statistics the most passengers (its peak hour ridership ■ Tunneling: 19×2 km with outer diameter is 17,000 per hour each way). This line is of 6.8 m & inner diameter of 5.9 m built all underground and will commence ■ Rail laying: 23X2 km &13

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us