World Bank Document

World Bank Document

Procurement Plan for KRWSS (P121774) I. General 1. Bank’s approval Date of the procurement Plan [April 2017 ] Public Disclosure Authorized 2. Date of General Procurement Notice: [30 August 2011 ] 3. Period covered by this procurement plan: January 2017 onwards II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: 2. Procurement Method Prior Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 2. NCB (Goods) Above US$ 100,000 3. ICB (Works) Above US$ 40 million Public Disclosure Authorized 4. NCB (Works) Above US$ 10 million 5. (Non-Consultant Services) Below US$ 100,000 2. Prequalification for Bidders _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P121774 by Jalanidhi Public Disclosure Authorized 5. Any Other Special Procurement Arrangements: In addition, the justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. Justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Public Disclosure Authorized Selection Method Prior Review Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 50,000 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT India : IN 2nd Kerala Rural Water Supply and Sanitation Project (Jalanidhi II) PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2016-07-22 Revised Plan Date(s): (comma delineated, leave blank if none)2018-10-17 Project ID: P121774 GPN Date: Project Name: IN 2nd Kerala Rural Water Supply and Sanitation Project (Jalanidhi II) Loan / Credit No: IDA / 50270 Executing Agency(ies):Kerala Rural Water Supply and Sanitation Agency, Regional Management Project Unit Malappuram, Regional Project Management Unit Kannur WORKS Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 06/RPMU/MPM/KVKD- PLVTA/KVKD/NSP/16-17 / Design, supply, installation and commissioning of 2 Nos. of Iron removal Under Request for Single Stage - One plants, 2 Nos. of Pressure IDA / 50270 Post Limited 0.00 Implementat 2017-04-04 2017-05-30 2017-11-26 Quotations Envelope sand filters and a chlorine ion dosser for Karuvarakund WSS and Pulvetta WSS in Karuvarakund GP in Malappuram district. IN-RPMUK-11618-CW-RFB Under Single Stage - Two / EAST ELERI LWSS IDA / 50270 Post Request for Bids Open - National 0.00 Implementat 2017-04-05 2017-04-10 2017-05-22 2017-08-04 2017-09-08 2018-03-07 Envelope Package III ion IN-RPMUK-14990-CW-RFB Single Stage - Two / LWSS - Pakage 2 IDA / 50270 Post Request for Bids Open - National 132,408.68 Signed 2017-05-12 2017-05-17 2017-06-28 2017-09-10 2017-10-15 2018-04-13 Envelope Kaithakolly - Thavinjal Gp IN-RPMUK-14994-CW-RFB Single Stage - Two / LWSS - Thavinjal GP , IDA / 50270 Post Request for Bids Open - National 245,201.88 Signed 2017-05-12 2017-05-17 2017-06-28 2017-09-10 2017-10-15 2018-04-13 Envelope Kappikalam IN-RPMUK-15071-CW-RFB / ALAKKODE - Single Stage - Two CONSTRUCTION OF IDA / 50270 Post Request for Bids Open - National 119,303.99 Completed 2017-05-19 2017-05-24 2017-07-05 2017-09-17 2017-10-22 2018-04-20 Envelope VENTED WEIR ACROSS RAYAROM RIVER IN-RPMUK-15223-CW-RFB Single Stage - Two / THONDERNAD - ADAI IDA / 50270 Post Request for Bids Open - National 231,958.39 Completed 2017-05-15 2017-05-20 2017-07-01 2017-09-13 2017-10-18 2018-04-16 Envelope LWSS - Package II IN-RPMUK-25809-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-08-23 Quotations Envelope at Cheruparamba WSS, ion Kunnothuparamba GP IN-RPMUK-25812-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-08-23 Quotations Envelope at Thonichal WSS, Edavaka ion G P IN-RPMUK-25814-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope at Thuvakunnu WSS, ion Kunnothuparamba G P IN-RPMUK-25817-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope at Varadhur WSS ion Kaniyambetta GP IN-RPMUK-26280-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Treatment Plant - IDA / 50270 Post Open - National 0.00 Implementat 2017-08-26 2017-09-16 2017-10-16 Quotations Envelope Mahatma WSS - Edavaka ion GP IN-RPMUK-25819-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-08-23 Quotations Envelope at Ganga Mathamangalam ion BG, Poothadi G P IN-RPMUK-26281-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant - IDA / 50270 Post Open - National 0.00 Implementat 2017-08-26 2017-09-16 2017-10-16 Quotations Envelope Koonanchal WSS, ion MUNDERI GRAMA PANCHAYATH 20/RPMU/MPM/MNKR/NCB/ 16-17 / rehabilitation of water supply scheme in Pending Single Stage - Two Mankara Gramapanchayath IDA / 50270 Post Request for Bids Open - National 0.00 Implementat 2017-09-22 2017-09-27 2017-11-08 2018-01-21 2018-02-25 2018-08-24 Envelope with a coverage of water ion supply to house holds in ward 1,2,3,4 and 14. IN-RPMUK-25831-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope at Padannottu WSS ion Mundery G P IN-RPMUK-25837-CW-RFQ / Purchase an installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope at Chadalapuzha WSS, ion Kadirur G Page 1 IN-RPMUK-25839-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-09-13 2017-10-13 Quotations Envelope at Nila Ashankavala WSS, ion Poothadi G P IN-RPMUK-26278-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-26 2017-08-26 2017-09-25 Quotations Envelope at Santhwanam SLEC, ion Edavaka Gramapanhayath IN-RPMUK-25840-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope at Ellumannam WSS, ion Edavaka G P IN-RPMUK-26279-CW-RFQ / Purchase and installation Pending Request for Single Stage - One of Water Treatment Plant IDA / 50270 Post Open - National 0.00 Implementat 2017-08-26 2017-08-26 2017-09-25 Quotations Envelope at Janasakthi SLEC, ion Edavaka Gramapanchayath KRWSA-PMU/3468/2017-TA- TECH / Batch I-Nenmeni Pending GP-Augmentation of Water Single Stage - Two IDA / 50270 Post Request for Bids Open - National 0.00 Implementat 2017-08-30 2017-09-04 2017-10-16 2017-12-29 2018-02-02 2018-08-01 Supply Scheme to Nenmeni Envelope ion Sudhajalavitharana Padhathi-Jalanidhi I IN-RPMUK-16296-CW-RFB / CONSTRUCTION OF VENTED WEIR AT Single Stage - Two IDA / 50270 Post Request for Bids Open - National 420,495.09 Signed 2017-08-23 2017-08-23 2017-08-23 2017-08-23 2017-08-23 2018-07-04 THANNIYADI RIVER, Envelope PULLUR PERIYA GRAMA PANCHAYATH IN-RPMUK-34732-CW-RFB / Jalanidhi II - Batch III GP - RPMU Kannur - Kasargod District - Meenja Pending Request for Single Stage - One GP -, Community IDA / 50270 Post Open - National 0.00 Implementat 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Contracting, Morthane ion Kajakodi Scheduled Tribe Water Supply Scheme. Total TS Amount Rs- 11,96,000/- IN-RPMUK-34733-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur Pending - Meenja GP - Thalekala Request for Single Stage - One IDA / 50270 Post Open - National 0.00 Implementat 2018-02-16 2018-02-16 2018-02-16 BG - Community Quotations Envelope ion Contracting- Small Water Supply Scheme - Distribution System - Total TS Rs.30,09,500/- IN-RPMUK-34734-CW-RFB / Jalanidhi II - Batch III - RPMU Kannur - Kasargod District - Meenja GP - Pending Pajinkar Santhadka BG - Request for Single Stage - One IDA / 50270 Post Open - National 0.00 Implementat 2018-02-16 2018-02-16 2018-02-16 Small Water Supply Quotations Envelope ion Scheme, Community Contracting.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us