FFY 2009 Interstate TIP Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Allegheny MPMS #: 74919 Municipality: Glenfield (Boro) Title: SR 65 @ NI Ramps Route:65 Section: A38 A/Q Status: Exempt Improvement Type: Reconstruct Exempt Code: Pavement resurfacing and/or rehabilitation Est. Let Date: 06/26/2009 Actual Let Date: 06/26/2009 Geographic Limits: Located on SR 65/I79 Neville Island Interchange (9 structures), Glenfield Borough, Allegheny County Narrative: Pavement reconstruction and crack sealing. Bridge preservation work to include; dam repair, deck repairs, latex overlay, minor abutment repairs, and bearing repairs. Located on SR 65/I79 Neville Island Interchange (9 structures), Glenfield Borough, Allegheny County TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONBOO $9,047 $0 $0 $0 $0 $0 CONIM $12,092 $0 $0 $0 $0 $0 CON185 $1,005 $0 $0 $0 $0 $0 CON581 $1,344 $0 $0 $0 $0 $0 $23,487 $0 $0 $0 $0 $0 Total FY 2009-2012 Cost $23,487 MPMS #: 26926 Municipality: Title: I79 Ohio Rvr N to 279 Route:79 Section: 35M A/Q Status: Improvement Type: Restoration Est. Let Date: 12/08/2006 Actual Let Date: 12/08/2006 Geographic Limits: Located on I-79 from the Neville Bridge to the I279 north interchange in Boroughs of Glenfield, Sewickley Hills Narrative: Located on I-79 from the Neville Bridge to the I279 north interchange Glenfield, Sewickley Hills, and Franklin Park Boro; Aleppo, Neville and Ohio Twps in Allegheny County Reconstruction of concrete pavement TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONIM $2,340 $0 $0 $0 $0 $0 CON581 $260 $0 $0 $0 $0 $0 $2,600 $0 $0 $0 $0 $0 Total FY 2009-2012 Cost $2,600 Page 1 of 100 FFY 2009 Interstate TIP Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Allegheny MPMS #: 26924 Municipality: Title: I-79 Kirwin Heights-I279 Route:79 Section: A12 A/Q Status: Improvement Type: Restoration Est. Let Date: 12/23/2004 Actual Let Date: 12/23/2004 Geographic Limits: Kirwin Hts Interchange - Parkway Interchange in Collier, Scott & Robinson Twps. Narrative: I79/Kirwin Heights-I279 Kirwin Hts Interchange - Parkway Interchange in Collier, Scott & Robinson Twps. restoration TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONIM $250 $0 $0 $0 $0 $0 CON581 $28 $0 $0 $0 $0 $0 $278 $0 $0 $0 $0 $0 Total FY 2009-2012 Cost $278 MPMS #: 74908 Municipality: Title: I79-5 Neville Top Route:79 Section: A37 A/Q Status: Improvement Type: Bridge Rehabilitation Est. Let Date: 12/08/2006 Actual Let Date: 12/08/2006 Geographic Limits: Located SR 79 from northbound on-ramp to the northern abutment of the main line river crossing bridge, in Glen Narrative: Located SR 79 from NB on-ramp to the northern abutment of the main line river crossing bridge Glenfield, Neville, Robinson and Aleppo, Allegheny County. Bridge rehabilitation to include repair of deck, dams, railing, substructure, downspo TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONBOO $180 $0 $0 $0 $0 $0 CON185 $20 $0 $0 $0 $0 $0 $200 $0 $0 $0 $0 $0 Total FY 2009-2012 Cost $200 Page 2 of 100 FFY 2009 Interstate TIP Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Allegheny MPMS #: 75760 Municipality: Title: I79 Paint/Repair Route:79 Section: A46 A/Q Status: Exempt Improvement Type: Bridge Rehabilitation Exempt Code: Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date: 10/30/2008 Actual Let Date: 10/30/2008 Geographic Limits: Located on I-79, from SR 19 to PA Turnpike with SR 4054, in Marshall Township and Franklin Park Borough, A Narrative: I-79, from SR 19 to PA Turnpike with SR 4054 Marshall Township and Franklin Park Borough, Allegheny County Bridge Preservation, Rehabilitation TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONIM $3,568 $0 $0 $0 $0 $0 CON581 $396 $0 $0 $0 $0 $0 $3,964 $0 $0 $0 $0 $0 Total FY 2009-2012 Cost $3,964 MPMS #: 62790 Municipality: Marshall (Twp) Title: I79 ov Warrendale Bayne Route:79 Section: A49 A/Q Status: Improvement Type: Bridge Preservation Activities Est. Let Date: 09/02/2010 Actual Let Date: Geographic Limits: I-79, approx. 2.5 miles North of the SR 0079/SR 0279 split to approx. 0.5 miles North of the intersection of SR 0 Narrative: Repair/replacing existing expansion joints, deck, deteriroated concrete and full zone painting. Located on I-79, approx. 2.5 miles North of the SR 0079/SR 0279 split to approx. 0.5 miles North of the intersection of SR 0079 and SR 0019, Marshall Township, Allegheny County. TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years FDIM $810 $315 $0 $0 $0 $0 FD581 $90 $35 $0 $0 $0 $0 UTLIM $0 $9 $0 $0 $0 $0 UTL581 $0 $1 $0 $0 $0 $0 ROWIM $0 $54 $0 $0 $0 $0 ROW581 $0 $6 $0 $0 $0 $0 CONIM $0 $10,238 $0 $0 $0 $0 CON581 $0 $1,138 $0 $0 $0 $0 $900 $11,795 $0 $0 $0 $0 Total FY 2009-2012 Cost $12,695 Page 3 of 100 FFY 2009 Interstate TIP Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Allegheny MPMS #: 86837 Municipality: Franklin Park (Boro) Title: 79/279 Split to Mingo Br Route:79 Section: A51 A/Q Status: Improvement Type: Resurface Est. Let Date: 08/06/2009 Actual Let Date: 08/13/2009 Geographic Limits: Located on I79 from Seg 710/1908 - 740/0085 and 711/1512 - 741/153, Franklin Park/Marshall Township, Alleg Narrative: 4" mill and resurface on mainline and 1 1/2" mill and resurface on the shoulders. Located on I79, Franklin Park/Marshall Township, Allegheny County TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONIM $3,780 $0 $0 $0 $0 $0 CON581 $420 $0 $0 $0 $0 $0 $4,200 $0 $0 $0 $0 $0 Total FY 2009-2012 Cost $4,200 MPMS #: 75908 Municipality: Kennedy (Twp) Title: I79-4 Crafton - Neville Route:79 Section: A54 A/Q Status: Improvement Type: Restoration Est. Let Date: 08/05/2010 Actual Let Date: Geographic Limits: I-79 Part 4, SR 79 Moon Run to Neville Island, Seg 0604/0605 Offset 0200/0400 to Seg 0644/0645 Offset 1852/ Narrative: patch and overlay, minimal to no bridge work planned on I-79 Part 4, SR 79 Moon Run to Neville Island, Kennedy & Robinson Twps., Allegheny County TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CON916 $0 $6,500 $0 $0 $0 $0 $0 $6,500 $0 $0 $0 $0 Total FY 2009-2012 Cost $6,500 MPMS #: 81927 Municipality: Title: I-79 Wash Co/Bridgeville Route:79 Section: A55 A/Q Status: Exempt Improvement Type: Restoration Exempt Code: Pavement resurfacing and/or rehabilitation Est. Let Date: 07/21/2011 Actual Let Date: Geographic Limits: I-79, Wash. Co. to Bridgeville, Bridgeville Boro, S. Fayette Twp., Allegheny Co. NB 0496/0000, SB 0497/0000 Narrative: CPR Interstate Maintenance on I-79, from Washington County to Bridgeville, in Bridgeville Borough and South Fayette Township, Allegheny County TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years PE916 $0 $500 $500 $0 $0 $0 FD916 $0 $0 $400 $0 $0 $0 CON916 $0 $0 $0 $11,700 $0 $0 $0 $500 $900 $11,700 $0 $0 Total FY 2009-2012 Cost $13,100 Page 4 of 100 FFY 2009 Interstate TIP Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Allegheny MPMS #: 74909 Municipality: Title: Bridge PM/Dam Replacement Route:279 Section: 0 A/Q Status: Improvement Type: Bridge Preservation Activities Est. Let Date: 02/21/2008 Actual Let Date: 02/21/2008 Geographic Limits: Various municipaltiies, Allegehny Co. Narrative: Bridge PM/46 Dam Replacem Various municipaltiies, Allegehny Co. Bridge restoration/preservation repair for expansion dams. Dams with neoprene compression seals will have the existing neoprene removed and replaced with a silicone TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONBOO $480 $0 $0 $0 $0 $0 CON185 $53 $0 $0 $0 $0 $0 $533 $0 $0 $0 $0 $0 Total FY 2009-2012 Cost $533 MPMS #: 74902 Municipality: Title: I279-7 Camp Horne-I79 Ph2 Route:279 Section: A73 A/Q Status: Exempt Improvement Type: Restoration Exempt Code: Pavement resurfacing and/or rehabilitation Est. Let Date: 10/23/2008 Actual Let Date: 10/23/2008 Geographic Limits: 250 feet south of structures over Gass Road (SR 4014) to 2100' north of structure carrying Rochester Road (SR 4 Narrative: I-279, from the structure over SR 4021 (Camp Horne Road) to SR I-79 Ross and Ohio Township, Franklin Park Borough, Allegheny County. Concrete patching, overlay, guide rail updates, drainage, bridge preservation, extending 279 merge lane TIP Program Years ($000) Phase Fund FY 2009 FY 2010 FY 2011 FY 2012 2nd 4 Years 3rd 4 Years CONIM $11,451 $4,718 $0 $0 $0 $0 CON581 $1,272 $524 $0 $0 $0 $0 $12,723 $5,242 $0 $0 $0 $0 Total FY 2009-2012 Cost $17,965 Page 5 of 100 FFY 2009 Interstate TIP Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Allegheny MPMS #: 84235 Municipality: Pittsburgh (City) Title: Ft.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages100 Page
-
File Size-