<p><strong>CENTRAL ELECTRICITY REGULATORY COMMISSION </strong><br><strong>NEW DELHI </strong></p><p><strong>Petition No. 325/2009 </strong><br><strong>Coram: </strong><br><strong>1. Dr. Pramod Deo, Chairperson 2. Shri S.Jayaraman, Member 3. Shri V.S.Verma, Member 4. Shri M.Deena Dayalan, Member </strong></p><p><strong>DATE OF HEARING: 11.3.2010 In the matter of </strong><br><strong>DATE OF ORDER: 26.4.2010 </strong></p><p>Determina tion of revised tra nsmission ta riff due to a dditiona l c a pita l expenditure during 1.4.2008 to 31.3.2009 for (i) 315 MVA, 400/220 kV, IC T a t Siliguri; (ii) 400 kV D/C Biha rsha riff-Muza ffa rpur line, Biha rsha riff 400 kV extension a nd Muza ffa rpur 400 kV extension; (iii) 315 MVA, 400/220 kV, IC T-I Subha shgra m sub-sta tion (New); a nd (iv) LILO of one c irc uit of 400 kV D/C Fa ra kka -Jeera t line a t Subha shgra m a nd esta blishment of 400/220 kV substa tion (New) a t Subha shgra m inc luding 1X315 MVA, IC T-II under system strengthening Sc heme for Ea stern Region (formerly pa rt of Ta la Supplementa ry Sc heme). </p><p><strong>And in the matter of </strong></p><p>Power G rid C orpora tion of India Limited, G urga on <br>Vs </p><p><strong>..Petitioner </strong></p><p>1. 2. 3. 4. 5. </p><p>6. </p><p>Biha r Sta te Elec tric ity Boa rd, Pa tna West Benga l Sta te Elec tric ity Boa rd, Kolka ta G rid C orpora tion of Orissa Ltd., Bhuba neswa r Da moda r Va lley C orpora tion , Kolka ta Power Depa rtment, G ovt. of Sikkim, G a ngtok Jha rkha nd Sta te Elec tric ity Boa rd, Ra nc hi </p><p>… . <strong>Respondents </strong></p><p><strong>The following were present: </strong></p><p>1. Shri U.K.Tya gi, PG C IL 2. Shri Ra kesh Pra sa d, PG C IL 3. Shri M.M.Monda l, PG C IL 4. Shri R.B.Sha rma , Advoc a te, BSEB </p><p><strong>ORDER </strong></p><p>This petition ha s been filed for revision of tra nsmission ta riff due to a dditiona l c a pita l expenditure inc urred in respec t of tra nsmission elements </p><p>Page <strong>1 </strong>of <strong>28 </strong></p><p>given in the ta ble below together with their da tes of c ommerc ia l opera tion under System Strengthening Sc heme (the tra nsmission sc heme) in Ea stern Region during the period from 1.4.2008 to 31.3.2009 for Asset-I a nd Asset-II a nd 1.4.2007 to 31.3.2009 for Asset-III a nd Asset-IV, ba sed on the C entra l Elec tric ity Regula tory C ommission (Terms a nd C onditions of Ta riff) Regula tions, 2004 (hereina fter referred to a s “the 2004 regula tions: </p><ul style="display: flex;"><li style="flex:1">S.No. </li><li style="flex:1">Na me of Assets </li><li style="flex:1">Da te of the </li></ul><p>c ommerc ia l opera tion </p><ul style="display: flex;"><li style="flex:1">1.10.2006 </li><li style="flex:1">1. </li></ul><p>2. </p><p>315 MVA, 400/220 kV, IC T a t Siliguri <strong>(Asset-I) </strong></p><p>400 kV D/C Biha rsha riff-Muza ffa rpur line, Biha rsha riff 400 1.11.2006 </p><p>kV extension a nd Muza ffa rpur 400 kV extension <strong>(Asset-II) </strong></p><p>315 MVA, 400/220 kV, IC T-I Subha shgra m sub-sta tion 1.4.2007 </p><p>(New) <strong>(Asset-III) </strong></p><p>LILO of one c irc uit of 400 kV D/C Fa ra kka -Jeera t line a t 1.3.2007 Subha shgra m a nd esta blishment of 400/220 kV substa tion (New) a t Subha shgra m inc luding 1X315 MVA, IC T- </p><p>II <strong>(Asset-IV) </strong></p><p>3. 4. </p><p></p><ul style="display: flex;"><li style="flex:1">2. </li><li style="flex:1">The petitioner ha s a lso pra yed for reimbursement of the petition filing </li></ul><p>fee, lic enc e fee a nd other expenditure in c onnec tion with the filing of the petition </p><p></p><ul style="display: flex;"><li style="flex:1">3. </li><li style="flex:1">The investment a pprova l for the tra nsmission sc heme wa s a c c orded by </li></ul><p>the Boa rd of Direc tors of the petitioner c ompa ny vide letter da ted 25.2.2003 a t a n estima ted c ost of Rs. 24791 la kh, whic h inc luded IDC of Rs. 2364 la kh. Subsequently, the revised c ost estima te for the tra nsmission sc heme wa s a pproved by Boa rd of Direc tors of the petitioner c ompa ny vide its letter da ted 9.7.2007 a t a n estima ted c ost of Rs. 33618 la kh, whic h inc luded a n IDC of Rs.1837 la kh. </p><p>Page <strong>2 </strong>of <strong>28 </strong></p><p></p><ul style="display: flex;"><li style="flex:1">4. </li><li style="flex:1">The tra nsmission c ha rges a pproved for the Asset-I a nd Asset-II vide </li></ul><p>order da ted 6.5.2008 in Petition No. 97/2007 were revised by the C ommission vide its order da ted 19.8.2009 in Petition No. 68/2009. Tra nsmission c ha rges for Asset-III a nd Asset-IV were a pproved vide order da ted 1.5.2008 in Petition No. 160/2007. The summa ry of the tra nsmission c ha rges a pproved by the sa id orders da ted 19.8.2009 a nd 1.5.2008 is extra c ted hereunder: </p><p>(Rs. in lakh) </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Asset-I </strong></li><li style="flex:1"><strong>Asset-II </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>2007-08 </strong></li><li style="flex:1"><strong>2008-09 </strong></li><li style="flex:1"><strong>2007-08 </strong></li><li style="flex:1"><strong>2008-09 </strong></li></ul><p></p><p>Depreciation </p><p></p><ul style="display: flex;"><li style="flex:1">34.59 </li><li style="flex:1">35.67 </li><li style="flex:1">486.43 </li><li style="flex:1">496.82 </li></ul><p>917.99 771.13 <br>0.00 <br>63.02 </p><p>202.52 </p><p>Interest on Loan Return on Equity Advance against Depreciation Interest on Working Capital O & M Expenses </p><p><strong>Total </strong></p><p>48.82 40.35 <br>0.00 4.73 </p><p>63.26 </p><p>48.28 41.61 <br>0.00 4.88 </p><p>65.80 </p><p>927.68 755.15 <br>0.00 <br>61.41 </p><p>194.50 </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>191.76 </strong></li><li style="flex:1"><strong>196.25 </strong></li><li style="flex:1"><strong>2425.16 </strong></li><li style="flex:1"><strong>2451.48 </strong></li></ul><p></p><p>(Rs. in lakh) </p><p><strong>Asset-III </strong></p><p><strong>2007-08 </strong></p><p><strong>Asset-IV </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>2007-08 </strong></li><li style="flex:1"><strong>2006-07 </strong></li></ul><p><strong>(Pro rata) </strong></p><ul style="display: flex;"><li style="flex:1"><strong>2008-09 </strong></li><li style="flex:1"><strong>2008-09 </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">Depreciation </li><li style="flex:1">23.29 </li></ul><p>44.66 34.09 <br>0.00 3.21 </p><p>22.86 </p><p>282.27 529.42 412.69 <br>0.00 <br>38.84 </p><p>285.13 </p><p></p><ul style="display: flex;"><li style="flex:1">282.27 </li><li style="flex:1">37.33 </li></ul><p>51.18 43.53 <br>0.00 6.03 </p><p>63.26 </p><p>37.33 <br>Interest on Loan Return on Equity Advance against Depreciation Interest on Working Capital O & M Expenses Total <br>507.52 412.69 <br>0.00 <br>39.36 </p><p>296.67 </p><p>47.54 43.53 27.18 <br>6.67 </p><p>65.80 </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>128.10 </strong></li><li style="flex:1"><strong>1548.35 </strong></li><li style="flex:1"><strong>1538.51 </strong></li><li style="flex:1"><strong>201.33 </strong></li><li style="flex:1"><strong>228.05 </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">5. </li><li style="flex:1">The releva nt deta ils of the c a pita l expenditure of the tra nsmission </li></ul><p>a ssets c la imed by the petitioner a re a s under: <br>(Rs. in la kh) </p><p>C a pital c ost a s on the date of c ommerc ia l opera tion <br>C a pita l expenditure from the date of c ommerc ia l operation to 31.3.2007 <br>64.55 <br>Additional c a pita l expenditure during 2007-08 </p><ul style="display: flex;"><li style="flex:1">C a pita l c ost </li><li style="flex:1">Additional </li><li style="flex:1">C a pita l c ost </li></ul><p></p><ul style="display: flex;"><li style="flex:1">a s on 1.4.2008 </li><li style="flex:1">C a pita l </li><li style="flex:1">a s on 1.4.2009 </li></ul><p>Expenditure during 2008-09 </p><p>Asset-I Asset-II Asset-III Asset-IV <br>866.38 <br>17432.95 <br>1036.90 9657.71 <br>59.97 761.24 <br>0.00 <br>990.90 <br>18440.10 1036.90 10480.77 <br>10.74 101.35 49.81 <br>1001.64 18541.45 1086.71 10942.28 <br>245.91 <br>-</p><ul style="display: flex;"><li style="flex:1">171.80 </li><li style="flex:1">651.26 </li><li style="flex:1">461.51 </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">6. </li><li style="flex:1">The petitioner ha s c la imed the tra nsmission c ha rges a s under: </li></ul><p></p><p>Page <strong>3 </strong>of <strong>28 </strong></p><p>(Rs. in la kh) </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Asset-IV </strong></li><li style="flex:1"><strong>Asset- I </strong></li><li style="flex:1"><strong>Asset-II </strong></li><li style="flex:1"><strong>Asset- III </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">2008-09 </li><li style="flex:1">2008-09 </li><li style="flex:1">2007-08 </li><li style="flex:1">2008-09 </li><li style="flex:1">2007-08 </li><li style="flex:1">2008-09 </li></ul><p></p><p>35.87 48.63 41.84 <br>0.00 <br>498.12 921.35 773.26 <br>0.00 <br>37.33 51.18 43.53 <br>0.00 <br>38.22 49.24 44.57 26.28 <br>6.73 <br>291.55 552.02 426.36 <br>0.00 <br>306.96 566.67 449.73 <br>0.00 </p><p>Deprec ia tion Interest on Loa n Return on Equity Adva nc e a ga inst Deprec ia tion Interest on Working C a pita l O & M Expenses </p><p></p><ul style="display: flex;"><li style="flex:1">4.90 </li><li style="flex:1">63.14 </li><li style="flex:1">6.03 </li><li style="flex:1">39.63 </li><li style="flex:1">41.46 </li></ul><p>65.80 </p><p><strong>197.04 </strong></p><p>202.52 </p><p><strong>2458.39 </strong></p><p>63.26 </p><p><strong>201.33 </strong></p><p></p><ul style="display: flex;"><li style="flex:1">65.80 </li><li style="flex:1">285.13 </li><li style="flex:1">296.67 </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>1661.49 </strong></li><li style="flex:1"><strong>230.84 1594.69 </strong></li></ul><p></p><p>Tota l </p><p></p><ul style="display: flex;"><li style="flex:1">7. </li><li style="flex:1">The deta ils submitted by the petitioner in support of its c la im for interest on </li></ul><p>working c a pita l a re given hereunder: <br>(Rs. in la kh) </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Asst-IV </strong></li><li style="flex:1"><strong>Asset- I </strong></li><li style="flex:1"><strong>Asset-II </strong></li><li style="flex:1"><strong>Asset- III </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">2008-09 </li><li style="flex:1">2008-09 </li><li style="flex:1">2007-08 2008-09 2007-08 2008-09 </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">9.46 </li><li style="flex:1">189.41 </li><li style="flex:1">10.37 </li></ul><p>5.27 <br>10.99 <br>5.48 <br>97.06 23.76 <br>102.88 <br>24.72 </p><p>Ma intena nc e Spa res O & M expenses Rec eiva bles Tota l Ra te of Interest Interest </p><p>5.48 <br>32.84 47.78 <br>16.88 <br>409.73 616.02 <br>10.25% </p><p><strong>63.14 </strong></p><p>33.56 49.20 <br>38.47 54.94 <br>265.78 386.60 <br>10.25% </p><p><strong>39.63 </strong></p><p>276.92 404.52 <br>10.25% </p><p><strong>41.46 </strong></p><p></p><ul style="display: flex;"><li style="flex:1">10.25% </li><li style="flex:1">12.25% </li><li style="flex:1">12.25% </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>4.90 </strong></li><li style="flex:1"><strong>6.03 </strong></li><li style="flex:1"><strong>6.73 </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">8. </li><li style="flex:1">BSEB in its reply da ted 22.2.2010 ha s submitted tha t the a dditiona l </li></ul><p>c a pita l expenditure c la imed in the petition a re ma inly on a c c ount of retention/fina l pa yments a nd a c onfirma tion be ta ken from the petitioner tha t no pa rt of the c la im belongs to a ny other c a tegory not c overed by Regula tion 53 of the 2004 regula tions. The petitioner in its rejoinder ha s c onfirmed tha t the expenditure shown in the petition for the yea r 2007-08 a nd 2008-09 ha s been c la imed a s per Regula tion 53 (2) of the 2004 regula tion on a c c ount of fina l/retention pa yments. In view of the c la rific a tion of the petitioner, the objec tions of BSEB no more survive. BSEB ha s a lso objec ted to c onsidering O & M c ha rges, levies, duties, c ess or a ny other </p><p>Page <strong>4 </strong>of <strong>28 </strong></p><p>sta tutory ta xes etc ., reimbursement of the petition filing fee a nd lic enc e fee. These c onc erns ha ve been ta ken c a re of in the order. </p><p><strong>CAPITAL COST </strong></p><p></p><ul style="display: flex;"><li style="flex:1">9. </li><li style="flex:1">The deta ils submitted by the petitioner in support of its c la im for </li></ul><p>a dditiona l c a pita l expenditure a re given hereunder: <br>(Rs. in la kh) </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Asset-I </strong></li><li style="flex:1"><strong>Asset-II </strong></li><li style="flex:1"><strong>Asset-III </strong></li><li style="flex:1"><strong>Asset-IV </strong></li></ul><p></p><p>Amount <br>(Rs. in la kh) <br>Na ture a nd deta ils of expenditure <br>Amount <br>(Rs. in la kh) <br>Na ture a nd deta ils of expenditure <br>Amount <br>(Rs. in la kh) <br>Na ture a nd deta ils of expenditure </p><ul style="display: flex;"><li style="flex:1">Amount </li><li style="flex:1">Na ture a nd </li></ul><p></p><ul style="display: flex;"><li style="flex:1">Yea r </li><li style="flex:1">Yea r </li><li style="flex:1">Yea r </li><li style="flex:1">Yea r </li><li style="flex:1">(Rs. in la kh) </li><li style="flex:1">deta ils of </li></ul><p>expenditure </p><ul style="display: flex;"><li style="flex:1">Ba la nc e/ </li><li style="flex:1">2007-08 </li><li style="flex:1">Building, </li></ul><p></p><ul style="display: flex;"><li style="flex:1">tra nsmission </li><li style="flex:1">retention </li></ul><p></p><ul style="display: flex;"><li style="flex:1">pa yments </li><li style="flex:1">line </li><li style="flex:1">a nd </li></ul><p>sub-sta tion= Rs. la kh <br>651.26 <br>2008- <br>09 sub-sta tion = Rs. 10.74 la kh retention /Fina l pa yments <br>2008- 09 <br>Tra nsmission line= <br>Retention/Fi na l pa yments </p><ul style="display: flex;"><li style="flex:1">2008-09 </li><li style="flex:1">sub-station </li></ul><p>= Rs. 49.81 la kh <br>Ba la nc e pa yments </p><ul style="display: flex;"><li style="flex:1">2008-09 </li><li style="flex:1">Building, </li><li style="flex:1">Ba la nc e/ </li></ul><p>retention pa yments tra nsmission </p><ul style="display: flex;"><li style="flex:1">Rs. </li><li style="flex:1">101.35 </li><li style="flex:1">line </li></ul><p>sub-sta tion= a nd la kh <br>Rs. la kh <br>461.51 </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Total </strong></li><li style="flex:1"><strong>Rs. 10.74 </strong></li></ul><p><strong>lakh </strong><br><strong>Rs. lakh </strong></p><ul style="display: flex;"><li style="flex:1"><strong>101.35 </strong></li><li style="flex:1"><strong>Rs. 49.81 </strong></li></ul><p><strong>lakh </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Total </strong></li><li style="flex:1"><strong>Rs. 1112.77 </strong></li></ul><p><strong>lakh </strong></p><p></p><ul style="display: flex;"><li style="flex:1">10. </li><li style="flex:1">The petitioner ha s submitted a udited c a pita l c ost up 31.2.2009 duly </li></ul><p>c ertified by C ha rtered Ac c ounta nt. The a dditiona l c a pita l expenditure c la imed is within the origina l sc ope of work a nd on a c c ount of retention/fina l/ba la nc e pa yments. The a dditiona l expenditure sought to be c a pita lised is a llowed under Regula tion 53 of the 2004 regula tions. </p><p><strong>Initial spares </strong></p><p>11. C la use (1) of the Regula tion 52 of the 2004 regula tions <em>i n te r a l ia </em>provides tha t,- </p><p></p><ul style="display: flex;"><li style="flex:1">“(1) </li><li style="flex:1">Subjec t to prudenc e c hec k by the C ommission, the a c tua l </li></ul><p>expenditure inc urred on c ompletion of the projec t sha ll form the ba sis for determina tion of fina l ta riff. The fina l ta riff sha ll be determined ba sed on the a dmitted c a pita l expenditure a c tua lly inc urred up to the da te of c ommerc ia l opera tion of the tra nsmission system a nd sha ll inc lude c a pita lized initia l spa res subjec t to a c eiling norm a s 1.5% of origina l projec t c ost”. </p><p>Page <strong>5 </strong>of <strong>28 </strong></p><p></p><ul style="display: flex;"><li style="flex:1">12. </li><li style="flex:1">The deta ils of a c tua l expenditure inc urred a nd spa res inc luded therein by the </li></ul><p>petitioner a s per origina l sc ope of projec t up to 31.3.2009 a re a s under:- </p><p></p><ul style="display: flex;"><li style="flex:1">C a pita l Expenditures </li><li style="flex:1">(Rs in lakh) </li><li style="flex:1">Remarks </li></ul><p>Pa rtic ulars </p><p>Up to the da te of c ommerc ia l opera tion <br>From the da te of c ommerc ia l opera tion to 31-3-2007 <br>From 4-2007 to 31- 3-2008 </p><ul style="display: flex;"><li style="flex:1">1- </li><li style="flex:1">From </li><li style="flex:1">Tota l up to </li></ul><p>c utoff da te <br>Initial Spa res inc luded therein <br>1-4-2008 to 31-3- 2009 </p><p>Asset-I Asset-II </p><ul style="display: flex;"><li style="flex:1">866.38 </li><li style="flex:1">64.55 </li><li style="flex:1">59.97 </li><li style="flex:1">10.74 </li><li style="flex:1">1001.64 </li><li style="flex:1">2.18 </li></ul><p>1</p><p>23</p><p>4</p><p>Fina l tra nsmission ta riff up to the date of </p><ul style="display: flex;"><li style="flex:1">17432.95 </li><li style="flex:1">245.91 </li><li style="flex:1">761.24 </li><li style="flex:1">101.35 </li><li style="flex:1">18541.45 </li><li style="flex:1">148.43 </li></ul><p>c ommerc ial operation and a dd c a p up to <br>31.3.2008 allowed vide petition No. <br>68/2009 </p><ul style="display: flex;"><li style="flex:1">Asset-III </li><li style="flex:1">1036.90 </li><li style="flex:1">0.00 </li><li style="flex:1">0.00 </li><li style="flex:1">49.81 </li><li style="flex:1">1086.71 </li><li style="flex:1">0.00 </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">Asset-IV </li><li style="flex:1">9657.71 </li><li style="flex:1">171.80 </li><li style="flex:1">10942.28 </li><li style="flex:1">148.46 </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">651.26 </li><li style="flex:1">461.51 </li></ul><p></p><p>Fina l tra nsmission ta riff up to the date of c ommerc ial operation and a dd c a p up to <br>31.3.2007 allowed vide petition No. <br>160/2007 </p><p>13. <br>In rega rd to Asset-I, Asset-II, Asset-III a nd Asset-IV, tota l a c tua l expenditure </p><p>inc urred by the petitioner up to 31.3.2009 is Rs. 31572.08 la kh a nd c ost of spa res inc luded therein is Rs. 299.07 la kh. The tota l c ost without initia l spa res is Rs. 31273.01 la kh a nd c ost of spa res inc luded therein is Rs. 299.07 la kh whic h is found within the c eiling of 1.5% up to the c ut off da te a s per the 2004 regula tions. </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages28 Page
-
File Size-