The FA Guide to Floodlighting Building, Protecting and Enhancing Sustainable Football Facilities Welcome

The FA Guide to Floodlighting Building, Protecting and Enhancing Sustainable Football Facilities Welcome

THE FA GUIDE TO FLOODLIGHTING BUILDING, PROTECTING AND ENHANCING SUSTAINABLE FOOTBALL FACILITIES Welcome Floodlighting plays an important role in the delivery of football across several key areas of the game. It is a key requirement for clubs within the National League System and is also essential on 3G Football Turf Pitches to ensure extended community use which allows for Contents increased hours of play and football outcomes. This in turn assists in increasing revenues and improving sustainability of the facility. 04 Floodlighting for Grass and The purpose of this document is to guide clubs on the successful installation of artificial Artificial Surfaces lighting for football. There are some key issues with regards to the development of sites 08 Project Process for with floodlights and these include planning, health and safety, costs – both installation and Floodlighting Installations running costs, maintenance and achieving the required lux levels for the planned activities. 10 Appointment of Lighting Consultants This document highlights the main issues in relation to floodlighting for football, identifying 11 Design and Technical Requirements key areas for floodlight implementation. It also contains a process chart outlining the key 12 Design Solutions areas that will need to be considered when developing a project involving floodlights and 13 Planning Permission / discusses the appointment of lighting consultants, design and technical considerations, Construction Programming maintenance and potential issues relating to planning. Indicative costs are included as and Payment Schudules an outline guide for organisations when undertaking an early assessment of the financial 14 Maintenance and Testing viability of a floodlighting scheme. 15 Costs 16 Appendices and References: 17 Appendix A: Project Brief Template 18 Appendix B: Programme of Use Template 20 Appendix C: On-site Check List 22 Appendix D: Floodlighting Regulations / Survey Chart / Inspection Report 25 Appendix E: Cost of Ownership Calculator © The Football Association 2013 26 Contact Details This guide has been prepared by The Football Association with contributions from the Football Foundation, sports lighting specialist Abacus and Musco. Enquiries should be addressed to: Whilst every effort has been made to ensure the accuracy of the information contained in this publication any party The FA, Wembley Stadium, Wembley, London HA9 0WS who makes use of any part of this document in the developing natural grass pitches shall indemnify The Football Postal Address: The FA, Wembley Stadium, PO Box 1966, Association, its servants, consultants or agents against all claims, proceedings, actions, damages, costs, expenses and London SW1P 9EQ any other liabilities for loss or damage to any property, or injury or death to any person that may be made against or T 0844 980 8200 incurred by the Football Association arising out of or in connection with such use. E [email protected] W TheFA.com/my-football The FA Guide to Floodlighting Building, Protecting and Enhancing Sustainable Football Facilities 03 The FA Guide to Floodlighting Floodlighting for Grass and Artificial Surfaces Grass Pitches – Competitive matches COMPARATIVE FLOODLIGHTING CHART Clubs wishing to compete in FA competitions Clubs wishing to compete in and in the National League System must achieve Ground Grade / Step League Level Eave Emin Emin / Emax Requires Testing the required standard relevant to the level of Grade A (Step 1) Conference 250 lux 100 lux 0.25 Every two years competition. They must obtain an approved Grade B (Step 2) Conference N & S 180 lux 100 lux 0.25 Every two years FA competitions and in the Floodlighting Survey Chart and a Floodlighting Inspection Report in order for a club to be Grade C (Step 3) 120 lux / 180 lux new* n/a 0.25 Every two years accepted for entry into a competition (see the Grade D (Step 4) 120 lux / 180 lux new* Every two years Maintenance and Testing section for further National League System must Within 6 months details). Leagues sanctioned by The Football Grade E (Step 5 – 4) 120 lux / 180 lux new* n/a 0.25 of application Association or County Football Association may achieve the required standard. also operate a floodlighting standard. If a League Grade F (Step 5) 120 lux / 180 lux new* n/a 0.25 Every two years sets a standard below that set by The Football Grade G (Step 6) 120 lux / 180 lux new* n/a 0.25 Every two years Association, Clubs must still comply with The Football Association’s minimum standards if *120 lux refers to existing systems, any upgrades or new installations should achieve 180 lux. they are to be accepted into FA Competitions. Please note that lighting for clubs in the professional game or for televised matches are not covered in this guide. Similarly, if a League sets a standard higher, then the Club must comply with the League requirement. Glossary of Terms Term Symbol Explanation A club should check the required floodlighting Illuminance E The quantity of light falling on a surface standard with the league and process required Eave The average horizontal illuminance as a result of either calculation or measurement for acceptance to play in that league. As a general Emax Maximum pitch illuminance on a surface at a specific point guide, the table opposite shows the minimum Emin Minimum pitch illuminance on a surface at a specific point standards that apply to non-league clubs in the pyramid. Illuminance Uniformity Emin ÷ Emax Lux Lux The measurement of light; the unit of illuminance lumen per m2, incident on a pitch surface 1 Lux = 1 Lumen/m2 The FA Guide to Floodlighting The FA Guide to Floodlighting 04 Building, Protecting and Enhancing Sustainable Football Facilities Building, Protecting and Enhancing Sustainable Football Facilities 05 Grass Community Pitches & Training 3G Football Turf Pitches Installation of floodlights on community Projects involving 3G FTP construction Floodlighting is required to grass pitches tends to result in overuse and generally incorporate floodlights as part of the subsequently pitches that are not fit design for the overall project since floodlighting for purpose. As such floodlight installations on is required to maximise the use and improve maximise the use and improve community grass pitches are not encouraged. the economic sustainability of artificial grass pitches. The FA would not support On average, a well maintained grass pitch building a 3G FTP where floodlighting is the economic sustainability of should have a carrying capacity of about five not provided. to six hours of weekly use, depending on local conditions. The implementation of floodlights Lighting of full size pitches is normally achieved on such pitches will in most cases have a by two or three lamps mounted onto normally 3G Football Turf Pitches (FTPs). detrimental affect on the playing qualities of an eight-column system which is positioned the pitch surface. This will require increased along the side of the pitch and outside of maintenance and therefore additional the fence-line. Typically for 3G FTPs, eight expense. It is therefore vital that organisations columns, 15 or 16 metres high, are used. These assess the intended use of the proposed should be switchable so that segments of the pitch and assess the cost of implementing pitch can be lit independently. floodlights against any increase in outputs / income from the site when reviewed against As many league and cup competitions 3G Football Turf Pitches available budgets for additional maintenance. specify the minimum level of lighting they 8 x 15m masts require, it will be necessary to determine Average illuminance 200 lux (maintained) However it is recognised that not all clubs have the competitions that the teams using the access to appropriate 3G Football Turf Pitches pitch will compete in and alter the design and that in some cases the use of floodlights accordingly. Where no requirements are stated To minimise running costs and for flexibility Typically, 3G Football Turf Pitches are designed for training on separate training areas can the minimum levels of performance should of use, the lighting system should allow part for multi-sport use and consideration should be help reduce the pressure on the main playing be in accordance with FIFA’s Class II which for illumination of the pitch (half pitch and/or given to the specific lighting requirements of all pitches. Thus the recommended lux levels for a 11-a-side football is a minimum maintained thirds) and a lower level of lighting for training anticipated users. training pitch is 120 lux. average illumination of 200 lux. which is a minimum maintained average illumination of 120 lux. Image courtesy of Abacus The FA Guide to Floodlighting The FA Guide to Floodlighting 06 Building, Protecting and Enhancing Sustainable Football Facilities Building, Protecting and Enhancing Sustainable Football Facilities 07 The FA Guide to Floodlighting Project Process for Floodlighting Installations Stage 1: Stage 2: Stage 3: Stage 4: Stage 5: Stage 6: Stage 7: Project Inception Feasability Outline Proposals Procurement Construction Completion Maintenance and Scheme Design Plans • Scope out project brief and demonstrate • Appoint an accredited • Engage with lighting specialist • Select and appoint • Site preparation • Sign off • Annual general lighting consultant the need for floodlights to produce schematics, layouts contractors • Supply and installation • Illumination and maintenance (in • Consult with key stakeholders (league, proposed •

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us