Swimming Pool

Swimming Pool

Swimming pool Planning, construction and installation of prefabricated elements on site Reference Schloss Montabaur Customer Akademie Deutscher Genossenschaften ADG Location Montabaur, Germany Year 2008 wedi project reference ¡ Swimming pool ¡ Schloss Montabaur | Page 2 of 6 Type of project In only three months, the old and now out-of-date „swimming Renovation pool-sauna-gym concept of the 80‘s was replaced with an architectural piece of art and a spa area for the 21st century. The overall design highlight is the variety of flowing, amorphous forms that come together to create cocoons of relaxation, relaxation pipes and tropical showers Architect Architektbüro Graf, Dernbach Contractor Akademie Deutscher Genossenschaft ADG Tradesman Fliesenfachgeschäft Manfred Rörig, Nentershausen wedi project reference ¡ Swimming pool ¡ Schloss Montabaur | Page 3 of 6 Short description Schloss Montabaur Since 1970, Schloss Montabaur has been the German Federal centre for management qualification for high-potentials, up-and-coming management personnel, managing directors of the Raiffeisen bank and Volksbank as well as cooperative goods, trade and service cooperatives. And not only that, the Akademie Deutscher Genossenschaften also runs a 4-start hotel in Schloss Montabaur with approximately 300 rooms. With over 70,000 overnight stays annually, Schloss Montabaur is one of the largest and most successful hotels in Rhineland-Palatinate. Since 2007, over-night stays have also been possible for individual guests. wedi project reference ¡ Swimming pool ¡ Schloss Montabaur | Page 4 of 6 Used Products Used Products Used Products Basis Products Individual Products Plug and Play Systems Secura exhibit 27 form elements for the so-called relaxation pipe - 7 “cocoons“ (the „niches“ integrated into the wall with made to measure linear loungers as well as seats with accompanying foot bath. 3 tropical showers with lighting The “cocoons” before and after The “relaxation pipe” before and after wedi project reference ¡ Swimming pool ¡ Schloss Montabaur | Page 5 of 6 Particular requirements Time was an important factor. Because the building work had to be carried out while the hotel was open and operating, it had to be done quickly. The wedi release drawings were drafted according to the architect‘s sketches and the made-to- measure elements made of building boards were cut, bent and finished. The relaxation pipe alone is made up of 27 individual parts which just needed to be glued together and tiled or plastered on site. It was the combination of wedi materials and the high-degree of prefabrication which allowed that such a tight timeframe of only 3 months for the work could be met. If the elements had had to be treated in order to protect them against moisture, damp and water on the building site, and if all forms would have had to be cut by hand, not only would the time plan not have been realistic, neither would the budget. wedi project reference ¡ Swimming pool ¡ Schloss Montabaur | Page 6 of 6.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us