Jsc Sma Flight Safety Office

Jsc Sma Flight Safety Office

JSC SMA FLIGHT SAFETY OFFICE Significant Incidents and Close Calls in Human Spaceflight: EVA Operations June 28, 2018 SMA Engineering Contract Product 6, Delivery 1 JS-2018-031 NNJ13RA01B Significant Incidents and Close Calls in Human Spaceflight: EVA Operations + STS-97/4A, EVA 1 12/3/2000 • Crew member experienced eye irritation, likely from STS-130/20A, EVA 1 2/11/2010 A Product of the JSC SMA Flight Safety Office anti-fog agent used in helmet. • EV2 observed water droplets in helmet and sensed water at feet. United Russia China STS-98/5A, EVA 1 2/10/2001 • EV2 was sprayed with ammonia and required STS-130/20A, EVA 2 2/14/2010 States decontamination procedure (aka “bakeout”). • EV2 exposed to ammonia from leaking quick- disconnect. STS-100/6A, EVA 1 4/22/2001 Mir, PE-6, EVA 1 7/17/1990 + • EV1 experienced eye irritation in both eyes. • Procedural error damaged airlock hatch, preventing STS-130/20A, EVA 3 2/17/2010 # % Attributed to leaking in-suit drink bag and anti-fog • EV1 observed water droplets in helmet. closure. Backup airlock used. agent used in helmet. Loss of Crew 0 0 Mir, PE-8, EVA 3 1/26/1991 U.S. EVA 15 8/7/2010 STS-100/6A, EVA 2 4/24/2001 • EV1 exposed to ammonia from leaking quick- • Inadvertent kick knocked Kurs antenna off. Not + • EV1 experienced eye irritation in both eyes. noticed until subsequent EVA. disconnect and experienced difficulty actuating Attributed to leaking in-suit drink bag and anti-fog quick-disconnect. Crew Injury 12 3 agent used in helmet. + STS-37, EVA 1 4/7/1991 + • Palm bar punctured glove and caused minor U.S. EVA 16 8/11/2010 ISS Exp-9 US EVA Ops 5/19/2004 • EV1 exposed to ammonia from leaking quick- contusion. • Temporary loss of ISS U.S. EVA capability due to x Early Termination 14 3 • Eye irritation in one crew member. disconnect and experienced difficulty actuating EMU cooling loop contamination. quick-disconnect. x RS EVA 9A 6/24/2004 System Issue 56 14 Apollo 15, EVA 2 7/31/1971 STS-37, EVA 2 4/8/1991 STS-134/ULF6, EVA 1 5/20/2011 • EVA terminated early due to misconfigured valve • Carbon dioxide sensor failure resulted in reduced • Drink bag would not dispense water. • Recommended against EVAs on consecutive days depleting Orlan suit oxygen supply at start of EVA. • Rover front wheel steering failed. due to fatigue and time constraints. EVA timeline. • Dust made EMU fittings difficult to operate. Operational Issue 38 9 RS EVA 10 8/3/2004 • Hand pain from gloves pressing against fingernails. Mir, PE-9, EVA 6 7/27/1991 STS-134/ULF6, EVA 3 5/25/2011 + • CMGs saturated during EVA. ISS went into free drift. + • One EV experienced eye irritation, likely from • Heat exchanger of one Orlan suit ran out of water, No IVA crew. Apollo 15, EVA 3 8/1/1971 resulting in helmet fogging. Other cosmonaut guided anti-fog agent. 409 total spacewalks. • Radio antenna broke – taped back in place. crew member back. 80 (20%) experienced significant incidents and/or close calls. • Difficulty navigating back to the LEM. • Crew member had bruises on hands, elbows, and STS-121/ULF1.1, EVA 2 7/10/2006 U.S. EVA 18 8/30/2012 shoulders. • EV1’s SAFER left tower latch was bumped into • EV2 experienced elevated EMU water cooling loop All hours represent EVA hours, not crew member hours. the unlatched position, resulting in the left tower temperatures. Apollo 16, EVA 1 4/21/1972 Mir, PE-10, EVA 1 12/20/1992 disengaging from the EMU. EVA was suspended All data accurate as of 6/15/2018. • Crew member slipped and fell on the PLSS after • Heat exchanger of one Orlan suit failed to work, until latch could be re-engaged by EV2. U.S. EVA 22 7/9/2013 jumping. requiring use of umbilical for cooling. Umbilical • Crew member observed the presence of water in • Lunar dust problems (jammed connectors, limited translation range. STS-116/12A.1, EVA 1 12/12/2006 the EMU helmet. accelerated wear, scratches). • Crew member conducted portions of EVA alone. • EV1’s SAFER HCM inadvertently deployed during • Tripped over cable to heat-flow sensors. airlock egress. EV2 re-stowed HCM on second x U.S. EVA 23 7/16/2013 Mir, PE-13, EVA 1 4/19/1993 attempt. SAFER NSI (pyro) accidentally fired. • 1 to 1.5 liters of water entered the EMU ventilation Voskhod 2 3/18/1965 Apollo 16, EVA 2 4/22/1972 Salyut 7 PE-1, EVA 1 7/30/1982 • Orlan suit ventilation problems. loop and collected in the EMU helmet. EVA • Suit ballooning impeded operations and made • EMU radio antenna broke. + • Tool use resulted in wrist ring pressing on wrist and x STS-118/13A.1, EVA 3 8/15/2007 terminated early. airlock ingress difficult. numbing hand. • EVA terminated early due to cut glove. • Workload exceeded cooling capacity. STS-57, EVA 1 6/25/1993 Apollo 16, EVA 3 4/23/1972 • Cold to point of experiencing hand pain. U.S. EVA 24 12/21/2013 • Temporary LRV navigation failure. • After returning to the airlock, an EMU feedwater STS-41-B, EVA 1 2/7/1984 • Almost lost untethered piece of IUS tilt table Gemini 4 6/3/1965 equipment. STS-120/10A, EVA 3 10/30/2007 switch procedural error resulted in water flooding • Difficulty closing hatch after EVA. Apollo 17, EVA 1 12/11/1972 • Slidewire bracket pip-pin pulled free. • One EMU unusable after EVA due to degraded the sublimator rendering EMU no-go for EVA. • Workload exceeded cooling capacity. + • Minor contusions from extracting stuck core sample. x Mir, PE-14, EVA 3 9/28/1993 sublimator. • One LRV fender broke off, which resulted in the crew STS-41-C, EVA 1 4/8/1984 U.S. EVA 25 12/24/2013 • Hardware configuration difference prevented EVA • EVA terminated early due to Orlan suit cooling + Gemini 9 6/5/1966 getting showered by dust while driving. system failure. • Crew members experienced difficulty disconnecting Difficulty maneuvering. crew member from capturing satellite. Resulted in RS EVA 20A 7/10/2008 ammonia fluid lines and reported seeing ammonia • Multiple areas of suit damage caused a thermal satellite losing sun-lock and tumbling. • Jettisoned Soyuz thruster cover collided with U.S. flakes escaping a valve. burn on the crew member’s back. • Low temperature of MMU led to false low-nitrogen x Mir, PE-14, EVA 4 10/22/1993 radiator. Skylab 2, EVA 2 6/7/1973 • EVA terminated early due to Orlan suit oxygen flow • Workload exceeded cooling capacity. reading. U.S. EVA 32 10/28/2015 • Primary EVA heat exchanger module suffered minor system problem. x STS-126/ULF2, EVA 2 11/20/2008 clogging during the EVA, leading engineers to • EMU feedwater switch inadvertently switched on Gemini 10 7/19/1966 STS-41-C, EVA 2 4/11/1984 • One EV experienced high carbon dioxide levels. prior to the airlock being at vacuum. + • EVA terminated early due to eye irritations from design a new module to serve as a backup. • EMU urine containment failure. STS-61, EVA 2 12/5/1993 EVA terminated early. x • One EV experienced radio problems. lithium hydroxide being blown into helmets when suit • EMU helmet fogging. U.S. EVA 35 1/15/2016 fans were run simultaneously. Skylab 3, EVA 3 9/22/1973 • Small trash bag lost due to inadvertent release of x STS-126/ULF2, EVA 4 11/24/2008 x • Water cooling system failed. • EV1 observed water in helmet. EVA terminated MWS lock. STS-63, EVA 2 2/9/1995 • One EV experienced high carbon dioxide levels. early. + • EVA terminated early when EV became EVA terminated early. Gemini 10 7/20/1966 Skylab 4, EVA 1 11/22/1973 Salyut 7 PE-3, EVA 6 8/8/1984 x “unacceptably cold.” • Umbilical blocked view of instruments and caused • Difficulty keeping umbilicals separated. + • One spacesuit experienced a failure of the cooling • One EV experienced eye irritation, likely from RS EVA 21A 3/10/2009 U.S. EVA 38 1/6/2017 inadvertent shutdown of Gemini radio. water pump. anti-fog agent. • EVs working close to rotating port Service • Crew used glove in hammer-like manner. Glove • Dislodged sharp-edged electric discharge ring. Skylab 4, EVA 2 12/25/1973 • Physician reported the hands of the EVA crew were Module solar array. Solar arrays should have removed from flight use. • Cooling water leak resulted in ice forming. injured. x STS-80, EVA 1 11/29/1996 been parked for EVA. x Gemini 11, EVA 1 9/13/1966 • EVA terminated early. Loose screw jammed airlock U.S. EVA 41 3/30/2017 • EVA terminated early due to fatigue. Skylab 4, EVA 3 12/29/1973 STS-51-I, EVA 2 9/1/1985 hatch latch mechanism, preventing operation. x STS-125/HST, EVA 4 5/17/2009 • Helmet lights detached from helmet, but were held • Workload exceeded cooling capacity. • Cooling water leak resulted in ice forming. • EMU helmet fogging due to suit temperature • Tear in palm of EMU glove noticed when EVA captive by the electrical cable. adjustments. STS-86, EVA 1 10/1/1997 was near completion. EVA terminated early. Skylab 4, EVA 4 2/3/1974 • Difficulty in handling satellite due to lack of visual • SAFER pyro failed to fire. Resulting lack of self- U.S. EVA 42 5/12/2017 • Cooling water leak resulted in ice forming. cues between EVA astronauts.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us