Addendum No. 1

Addendum No. 1

ADDENDUM NO. 1 TO: Interested Parties FROM: Blair Reynolds, Chief Project Manager, Division of Engineering DATE: Thursday, January 7, 2021 RE: Pavement Maintenance & Rehabilitation Program – FY-‘21 Hot Mix Asphalt (HMA) Applications Contract No. MS-PMP-285-28 _____________________________________________________________________________________ Acknowledge receipt of this Addendum No. 1 by signing in the space provided below and returning with your Bid. Failure to sign and return with your Bid may subject the Bidder to disqualification. This Addendum No. 1 forms a part of the Bid Documents, it supplements and modifies them as outlined herein. This Addendum No. 1 consists of 68 pages, including this page and attachments. I hereby acknowledge receipt of Addendum No. 1: By: ________________________________ Date__________________________ Signed Name ________________________________ Typed Name ________________________________ Title For: ________________________________ Firm To: All prime Contractors and all others to whom specifications have been issued. Item 1.01 PRE-BID CONFERENCE, held Wednesday, January 6, 2021 at 10:00 a.m.: Pre-Bid Conference Minutes (consisting of 4 pages). Item 1.02 Special Provisions, Pages SP-1 thru SP-46 DELETE in its entirety. REPLACE with Revised SP-1R thru SP-50R, as attached. Special Provisions revised to include Pay Item 509 Ultra-Thin Bonded Wearing Course. Item 1.02 Road List - Summary of Quantities DELETE in its entirety. REPLACE with Revised RL-1, as attached. Item 1.03 Bid Forms, Page BF-12 thru BF-21 DELETE in its entirety REPLACE with Revised BF-12R thru BF-21R, as attached. Attachments: Pre-Bid Conference Minutes with attachments (4 pages) Revised Special Provisions, Pages SP-1R thru SP-50R (50 pages) Revised Road List - Summary of Quantities, Page RL-1 (1 page) Revised Bid Forms, Pages BF12R thru BF-21R (10 Pages) END ADDENDUM No. 1 Washington County Pavement Maintenance & Rehabilitation Program FY'21 Hot Mix Asphalt Applications Contract No. MS-PMP-285-28 Pre-Bid Conference Minutes Wednesday, January 6, 2021 at 10:00a.m. Washington County Administrative Annex via Zoom Attendance: Blair Reynolds Division of Engineering Scott Hobbs Division of Engineering Pam Mohn Division of Engineering Darin Jenkins Craig Paving, Inc. Richard Craig Craig Paving, Inc. Francisco Martinez INL Masonry A Pre-Bid Conference Meeting for the referenced project was held at the Washington County Administrative Annex Building, located at 80 West Baltimore Street, Hagerstown, Maryland via Zoom. Those in attendance for the meeting are named above. PRE-BID COMMENTS: PBl After welcoming everyone in attendance, introductions were made for all attendees and eve1yone was asked to introduce themselves along with the company in which they are affiliated. PB2 Those in attendance were given a general overview of the project. The project is a Project Cost Group Letter "E" - 2.5 million to 5 million dollars and the work is generally described as asphalt preservation and corrective practices including but not limited to; Preparation work for a separate Chip Seal contract consisting ofleveling course, Crack Filling, Milling, Patching, Wedge & Level, Superpave Hot Mix Asphalt (HMA) Overlay (9.5mm and 12.5mm), Paving Fabric applications, Utility Adjustments (Manhole Risers), Pavement Paint Markings, and Thermoplastic Pavement Markings (lines and preformed applications) PB3 Bidders were provided a Road List - Summaty of Quantities and maps displaying the proposed roadways identified as part of the HMA Applications contract. PB4 Bidders were informed to mark the outside of bid envelope accordingly as pertaining to the Hot Mix Asphalt Applications. 80 West Baltimore Street I Hagerstown, MD 21740-6003 I P: 240.313.2460 I TDD: 711 WWW.WASH CO-MD.NET - PBS Bidders were made aware that a bid bond in the amount of 5% of the total bid is required and should be made payable to the Board of County Commissioners of Washington County, MD. PB6 Bidders were made aware that bids must be submitted on the forms provided. It was noted that these forms are not to be scanned or duplicated. Bids may be considered non-responsive if any other forms are used. PB7 Bidders were advised that the deadline for questions is January 13, 2021 at 4:30PM. Bidders may send questions via fax or email. The faxnumber is 240-313-2401 and email address [email protected] PB8 It was noted that this contract is a 185 consecutive calendar day contract. Milestones proposed include: • Anticipated NTP -April 5, 2021 • Contract Completion- October 8, 2021 • It was noted that the Contract is broken down into two phases: o Preparation work forseparate Chip Seal project - April 5, 2021 - May 9, 2021 (35 days) o Hot Mix Asphalt project - May 10, 2021- October 8, 2021 (150 days) PB9 With the submission of their bid, Bidders agree to pay as liquidated damages in the amount of $500.00 foreach consecutive calendar day after the deadline for each phase of the contract. PBlO Bidders were made aware of the Sub-Contractor Listing Form within the Bid Forms, Page BF-7, which is required to be completed and submitted with the bid. PB11 The successful Contractor must provide contract security in the form of a PerformanceBond and Labor & Material Payment Bond, each equal to 100% of the total contract price. Those requirements may be foundin the Contract Forms Section of the Bid Document. PB12 Bidders were informedthat the successful Contractor shall perform all required testing for quality control. PB13 The County has entered into agreement with Specialized Engineering to performquality assurance laboratory testing forthis contract. The Contractor is responsible for collecting all test samples under the direction of the County's Inspection Staff. PB14 Inspection and Inspection Authority will be provided by the County's Consultant Inspection Services Contractor, DFI (Development Facilitators Incorporated) and the County's Inspection Staff. PB15 Contingent Items/Quantities are included in the contract for use when and as directed by the County. PB16 The General Notes sections of the Special Provisions were pointed out to all attendees. Note #7 PB-2 was referenced to informthe bidders of the possibility of an extension to this contract upon mutual agreement of both parties • Note #7 - This Contract may be extended fora period of up to two (2) one (1) year extensions, upon mutual agreement of both parties, the County and the Contractor. Any change in unit price will be subject to approval by the Washington County Board of County Commissioners. PBl 7 The following info1mation was reviewed with the Bidders relative to Categ01y 100 Preliminary - MOT: • The Contractor shall provide all required maintenance of traffic, materials, equipment and ce1tifiedpersonnel. • The Contractor shall assign and designate a certified Traffic Control Manager foreach crew/location of work. PB18 The following informationwas reviewed relative to Category 500 - PAVING: • SHA approved/certified Superpave mix designs are required forthis contract. • Incidental items foreach individual pay item are listed in the Measurement and Payment section. Please make yourselves aware of all pe1tinent information. • Permanent Pavement Markings - Waterbourne Paint and Thermoplastic for Line Striping and PreformedThermo forPavement Markings such as RR Crossings, Crosswalks, and Stopbars. 1. Contractor is responsible fordocumenting all pavement markings on the proposed roads beforework begins. PB19 Attendees were advised to make themselves familiar with the road list and take time to review prior to submitting their bid. PB20 The STANDARD PLATES Section of the Bid Document includes construction details and MDOT - SHA Tempora1y Traffic Control Typical Applications that will be required on this contract. Bidders were advised that: • If the successful Contractor chooses to manage the control of traffic by other means and methods, the Contractor will be required to make formalsubmission of his traffic control plans to the County for approval. • Road closures are not allowed • If the Contractor chooses to performany work by road closure, formalsubmittal of his detour plans must be issued to the County forapproval. PB21 Bidders were made aware of the Contract Forms which are in the Bid Document for reference purposes. PB22 Bidders were reminded to submit any followup questions, which must be received submitted in writing no later than 4:30 p.m. Wednesday, Janua1y 13, 2021. PB23 Bids are due no later than, Wednesday, January 27, 2021 at 10:00 a.m. at which time the bids will be publicly opened and read aloud. Bids received later than 10:00 a.m. on the bid opening date, will be returned to the Bidder unopened. PB24 The Pre-Bid ConferenceMeeting was adjourned at 10:28 a.m. PB-2 � BlairReyz Chief Project Manager Division of Engineering cc; All Attendees Project File PB-3 SPECIAL PROVISIONS CONTRACT NO. MS-PMP-285-28 SPECIAL PROVISIONS PAVEMENT MAINTENANCE & REHABILITATION PROGRAM FY-’21 HOT MIX ASPHALT (HMA) APPLICATIONS CONTRACT NO. MS-PMP-285-28 PROJECT NO. 28-285 TABLE OF CONTENTS Page Numbers TABLE OF CONTENTS .................................................................................................... SP 1-2R GENERAL NOTES ................................................................................................................ SP-3R CATEGORY 100 - PRELIMINARY 101 - Maintenance of Traffic .................................................................................................... SP 4R 102 - CONTINGENT – Temporary

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    68 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us