Sir Francis Drake Boulevard Rehabilitation Project Final Environmental Impact Report

Sir Francis Drake Boulevard Rehabilitation Project Final Environmental Impact Report

SIR FRANCIS DRAKE BOULEVARD REHABILITATION PROJECT FINAL ENVIRONMENTAL IMPACT REPORT STATE CLEARING HOUSE NUMBER 2008112004 January 2011 SIR FRANCIS DRAKE BOULEVARD REHABILITATION PROJECT FINAL ENVIRONMENTAL IMPACT REPORT SCH # 2008112004 Submitted to: Marin County Department of Public Works 3501 Civic Center Drive San Rafael, California 94903 Contact: Mr. Dave Bernardi (415) 499-6530 Prepared by: LSA Associates, Inc. 157 Park Place Point Richmond, California 94801 (510) 236-6810 LSA Project No. BKF0902 January 2011 TABLE OF CONTENTS CHAPTER 1.0 INTRODUCTION.........................................................................................................1 1.1 PURPOSE OF THE EIR..................................................................................................1 1.2 PROPOSED ACTION .....................................................................................................1 1.3 CONTENTS OF THE EIR...............................................................................................2 1.4 PUBLIC REVIEW AND COMMENTS..........................................................................3 1.5 EIR PROCESS.................................................................................................................3 CHAPTER 2.0 SUMMARY ..................................................................................................................5 2.1 SUMMARY OF THE PROPOSED PROJECT ................................................................5 2.2 SUMMARY OF SIGNIFICANT UNAVOIDABLE ADVERSE IMPACTS ..................5 2.3 SUMMARY OF GROWTH INDUCING IMPACTS.......................................................5 2.4 SUMMARY OF CUMULATIVE IMPACTS ..................................................................6 2.5 SUMMARY OF PLAN AND POLICY CONSISTENCY ...............................................8 2.6 EFFECTS FOUND NOT TO BE SIGNIFICANT............................................................9 2.7 SUMMARY OF ALTERNATIVES ANALYSIS ............................................................9 2.8 AREAS OF CONTROVERSY .......................................................................................10 2.9 SUMMARY OF MAJOR CONCLUSIONS...................................................................11 2.10 ISSUES TO BE RESOLVED .........................................................................................12 2.11 SUMMARY TABLE OF IMPACTS AND MITIGATIONS .........................................13 CHAPTER 3.0 PROJECT DESCRIPTION.........................................................................................59 3.1 PROJECT BACKGROUND...........................................................................................59 3.2 PROJECT OBJECTIVES ...............................................................................................59 3.3 EXISTING CONDITIONS.............................................................................................59 3.4 PROPOSED PROJECT...................................................................................................73 3.5 REQUIRED PERMITS AND APPROVALS.................................................................96 CHAPTER 4.0 ENVIRONMENTAL IMPACT ANALYSIS .............................................................99 4.1 LAND USE AND PLANNING POLICY.....................................................................101 4.2 AESTHETICS...............................................................................................................133 4.3 BIOLOGICAL RESOURCES ......................................................................................150 4.4 CULTURAL RESOURCES .........................................................................................217 4.5 GEOLOGY AND SOILS..............................................................................................235 4.6 HYDROLOGY AND WATER QUALITY..................................................................252 4.7 HAZARDS AND HAZARDOUS MATERIALS.........................................................273 4.8 TRAFFIC AND CIRCULATION.................................................................................282 4.9 AIR QUALITY .............................................................................................................295 4.10 NOISE...........................................................................................................................311 4.11 PUBLIC SERVICES AND UTILITIES .......................................................................320 4.12 GLOBAL CLIMATE CHANGE ..................................................................................331 CHAPTER 5.0 ALTERNATIVES ANALYSIS ................................................................................345 5.1 NO PROJECT ALTERNATIVE ..................................................................................346 5.2 RESURFACE ROADWAY ALTERNATIVE .............................................................349 5.3 MITIGATED ROADWAY ALTERNATIVE ..............................................................351 5.4 ALTERNATIVES CONSIDERED BUT REJECTED FROM FURTHER CONSIDERATION .................................................................................................................352 5.5 ENVIRONMENTALLY SUPERIOR ALTERNATIVE..............................................353 CHAPTER 6.0 CEQA REQUIRED ASSESSMENT CONCLUSIONS ...........................................355 P:\BKF0902\EIR\Final EIR\SFDB_Final EIR.doc (01/09/11) i 6.1 GROWTH INDUCING IMPACTS ..............................................................................355 6.2 UNAVOIDABLE SIGNIFICANT ENVIRONMENTAL IMPACTS..........................355 6.3 SIGNIFICANT IRREVERSIBLE CHANGES.............................................................355 6.4 CUMULATIVE IMPACTS ..........................................................................................356 6.5 EFFECTS FOUND NOT TO BE SIGNIFICANT........................................................362 CHAPTER 7.0 REPORT PREPARATION .......................................................................................365 7.1 REPORT PREPARERS ................................................................................................365 7.2 REFERENCES..............................................................................................................366 7.3 COMMUNICATIONS..................................................................................................374 CHAPTER 8.0 ACRONYMS AND GLOSSARY OF TERMS ........................................................375 8.1 ACRONYMS ................................................................................................................375 8.2 GLOSSARY..................................................................................................................378 APPENDICES A: SUMMARY TABLE OF PUBLIC COMMENTS B: NOTICE OF PREPARATION C: COMMENTS RECEIVED IN RESPONSE TO THE NOTICE OF PREPARATION D: TRANSCRIPT OF PUBLIC SCOPING SESSION E: BIOLOGICAL ASSESSMENT F: TREE INVENTORY G: AIR QUALITY MODELING H: GEOTECHNICAL REPORT I: SLOPE INSTABILITY PRELIMINARY GEOTECHNICAL MEMORANDUM P:\BKF0902\EIR\Final EIR\SFDB_Final EIR.doc (01/09/11) ii FIGURES AND TABLES FIGURES Figure 3.1-1: Project Vicinity Map ......................................................................................................61 Figure 3.3-1: Project Location Map .....................................................................................................63 Figure 3.3-2: Existing Site Conditions .................................................................................................65 Figure 3.3-3: Existing Drainage Structures ..........................................................................................69 Figure 3.3-4: Pavement Conditions......................................................................................................71 Figure 3.4-1: Drainage Improvement Illustrations...............................................................................75 Figure 3.4-2: Pullout Improvements.....................................................................................................78 Figure 3.4-3: Slope Repair ...................................................................................................................81 Figure 3.4-4: Visual Simulations of Slope Repair................................................................................83 Figure 3.4-5: Additional Project Improvements...................................................................................85 Figure 3.4-6: Retaining Wall Improvements........................................................................................87 Figure 3.4-7: Visual Simulation of Low Retaining Wall .....................................................................89 Figure 3.4-8: Option A Improvements .................................................................................................93 Figure 4.1-1: Land Use Designations.................................................................................................103 Figure 4.2-1: Project Site and Topography ........................................................................................135 Figure 4.2-2: Tree Removal for Slope Repair ....................................................................................143 Figure 4.2-3: Tree Removal for Option A..........................................................................................145

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    387 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us