C3 Habitat Centre (Research Centre)

C3 Habitat Centre (Research Centre)

Application for Environmental Clearance for Expansion of “C3 Habitat Centre (Research Centre) At Plot No. C-3, Qutab Institutional Area, Katwaria Sarai, New Delhi BEING DEVELOPED BY: M/s Habitat India C-3, Qutab Institutional Area, Katwaria Saria, New Delhi PREPARED BY: Environmental Consultant M/s PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered wide list of accredited consultants organizations/ Rev 83/ 20 January, 2020 at S. No-120) NN Mall, Sector-3, Rohini, New-Delhi-85; Phone: 011-49281360 Scanned by CamScanner TABLE OF CONTENTS SECTION A- FORM 1 A-1 to A-19 SECTION B- FORM 1A B-1 to B-15 SECTION C- CONCEPTUAL PLAN C-1 to C-7 SECTION D- ENCIRONMENT MANAGEMENT PLAN D-1 to D-31 SECTION E- RISK ASSESSMENT E-1 to E-5 SECTION F- ENCLOSURES F-1 to F-98 Enclosure 1- Consultant Authorization F-1 Enclosure 2:Land Papers F-3 Enclosure 3: AAI Approval F-44 Enclosure 4:Electricity Bill F-48 Enclosure 5:Water Bill F-50 Enclosure 6: Air Dispersion Report F-53 Enclosure 7:Traffic Report F-68 Enclosure 8: Topographical Map F-86 Enclosure 9: Layout Plan F-88 Enclosure 10: Section Elevation Plan F-90 SECTION A : FORM 1 Expansion of “C3 Habitat Centre (Research Centre)” at Plot No. C-3, Qutab Institutional Area, New Delhi By M/s Habitat Centre APPENDIX I (See paragraph – 8.9) Form-1 I. Basic Information S. No. Item Details 1. Name of the project/s Expansion of “C3 Habitat Centre (Research Centre)” 2. S. No. in the schedule 8 (a) 3. Proposed capacity/ area/length/ tonnage to Total Plot Area - 9914.807 m2 ​ be handled/ command area/ lease area/ Total Built-up area-42541.285 m2 ​ number of wells to be drilled 4. New/ Expansion/ Modernization Expansion 5. Existing Capacity/ Area etc. Total Plot Area-: 9914.807 m2 ​ 2 Total Built-up area (existing) -: 13514.431 m ,​ The ​ construction was done in the year 2002. Thus, EIA Notification 2006 and its amendments were not applicable. At present the building is non-operational. 6. Category of Project i.e. ‘A’ or ‘B’ Category B 7. Does it attract the general condition? If Not Applicable yes, please specify. 8. Does it attract the specific condition? If Not Applicable yes, please specify. 9. Location Latitude: 28°32'12.55"N Longitude: 77°11'23.95" Plot/ Survey/ Khasra No. Plot No. C-3, Qutab Institutional Area, Village Katwaria Sarai Tehsil - District South Delhi State New Delhi 10. Nearest railway station/ airport along with Nearest Airport: ​ distance in kms. Safdarjung Airport-5.55 Km NNE Nearest Railway Station: ​ Okhla Railway Station -7.75 Km NEE Nearest National Highway: ​ NH 236 -3.45 Km SSW Nearest Metro Station : Hauz Khas Metro Station-1.70 Km NE 11. Nearest Town, city, District Headquarters The project is in New Delhi along with distance in kms. 12. Village Panchayats, Zilla Parishad, South Delhi Municipal Corporation. Municipal Corporation, Local body South Zone KD Colony, Sector 9, Rama Krishna (complete postal addresses with telephone Puram, New Delhi 110022 nos. to be given) E-mail ID: mcdonline.gov.in 13. Name of the applicant M/s Habitat India Environmental Consultant- M/s Perfact Enviro Solutions Pvt. Ltd. A-2 Expansion of “C3 Habitat Centre (Research Centre)” at Plot No. C-3, Qutab Institutional Area, New Delhi By M/s Habitat Centre 14. Registered Address C-3, Qutab Institutional Area, Katwaria Saria, New Delhi 15. Address for correspondence: C-3, Qutab Institutional Area, Katwaria Saria, New Delhi Name Mr. Ajay Singh Pathania Designation (Owner/Partner/CEO) DGM Address H-65, Cannaught Circus, New Delhi Pin Code 110001 E-mail [email protected] Telephone No. 01143034400 Fax no. - 16. Details of Alternative Sites examined, if No alternate site has been examined. any. Location of these sites should be shown on a Toposheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, Not Applicable 1980? (b) The Wildlife (Protection) Act, Not Applicable 1972? (c) The C.R.Z. Notification, 1991? Not Applicable 22. Whether there is any Government Order/ Not Applicable Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending No against the project and/ or land in which the project is propose to be set up? (a) Name of the Court Not applicable (b) Case No. Not applicable (c) Orders/ directions of the Court, Not applicable if any and its relevance with the proposed project. II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Environmental Consultant- M/s Perfact Enviro Solutions Pvt. Ltd. A-3 Expansion of “C3 Habitat Centre (Research Centre)” at Plot No. C-3, Qutab Institutional Area, New Delhi By M/s Habitat Centre S. No. Information/Checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No The land use of the total area of the project i.e in land use, land cover or 9914.807 sqm (2.45 Acres) has been changed to topography including increase in institutional use as per perpetual lease deed by Delhi intensity of land use (with respect Development Authority. (Lease deed has been to local land use plan) enclosed in Section-F). Expansion of the complex is being proposed for the existing non- operational building. Hence, there will be no change in land use. 1.2 Clearance of existing land, No There will be no clearance of existing buildings or vegetation and buildings? land on the project site. 1.3 Creation of new land uses? No Since, the proposed project is Expansion of an existing non- operational research centre. Hence, there will be no creation of new land uses. 1.4 Pre-construction investigations Yes Pre-construction Geo-technical investigation has e.g. bore houses, soil testing? been done. 1.5 Construction works? Yes Construction has been done as per approved building plans & applicable by-laws. The same will be followed for further construction for expansion also. 1.6 Demolition works? No There will be no demolition works on the site. 1.7 Temporary sites used for No Approx. 150 no. of workers during the construction construction works or housing of phase will be hired from nearby areas and hence no construction workers? housing provisions will be made. Only temporary shelters will be provided. 1.8 Above ground buildings, Yes Above ground, the building is elevated up to a structures or earthworks including maximum height of 32.31 m. Topsoil shall be linear structures, cut and fill or preserved at designated areas for landscaping excavations purposes while the rest of the excavated soil shall be used for backfilling purposes. 1.9 Underground works including No Not Applicable mining or tunneling? 1.10 Reclamation works? No No reclamation work will be done. 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No It is a building construction project; hence no processes? production or manufacturing processes will be carried out. Environmental Consultant- M/s Perfact Enviro Solutions Pvt. Ltd. A-4 Expansion of “C3 Habitat Centre (Research Centre)” at Plot No. C-3, Qutab Institutional Area, New Delhi By M/s Habitat Centre 1.14 Facilities for storage of goods or Yes During Construction Phase: materials? ♦ Separate raw material yards will be made within the project site. ♦ Cement will be separately stored under cover in bales. ♦ Sand will be stacked nearby under tarpaulin cover. ♦ Bricks and steel will be laid in open. ♦ The raw material yard will be located within the project site. During Operation Phase: Since the project is an Office Complex, storage of products like eatables, toiletries etc. will be done. 1.15 Facilities for treatment or disposal Yes Solid waste: of solid waste or liquid effluents? During Construction phase: Total 150 labourers will be hired during the construction phase and hence 23 kg/day of solid waste will be generated which will be disposed of at the Municipal Solid Waste Disposal Site. Mobile toilets will be provided at sites for laborers which will be regularly cleaned. The wastewater generated will be disposed of to septic tanks which will be cleaned regularly. During Operation Phase: Total after Expansion: 341 kg/day of total solid waste will be generated from the complex. Out of which, 137 kg/day of biodegradable waste will be treated in Organic Waste Convertor and converted to manure. 102 kg/day of non-biodegradable waste and 102 kg/day will be given approved recycler. Liquid Effluent : ​ 3 KLD of treated water from ETP along with waste water generated after expansion total waste water will be 98 KLD which will be treated in the STP of capacity 120 KLD for treatment of waste water generated from the complex. 93 KLD treated water will be reused completely within the premises for purposes like flushing, gardening and cooling and additional 55 KLD of treated water will be outsourced for cooling purposes. It will be a Zero-Liquid Discharge Complex. Details of Water Management & Solid Waste Management are given in Section-D. Environmental Consultant- M/s Perfact Enviro Solutions Pvt. Ltd. A-5 Expansion of “C3 Habitat Centre (Research Centre)” at Plot No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    80 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us