MONTHLY PROGRESS REPORT UPTO 31.08.2016 DEVELOPMENT PROGRAMME 2016-17 Sector WATER SUPPLY & SANITATION Rs.in Million Sr. GS. No. Name of Scheme District Approved Exp Upto Provision for Revised Funds Funds %age Total Physical Remarks (including detailed physical No. Cost June 2016 2016-17 allocation for released by utilized utilization Accummulati progress progress) 2016-17 FD till till 31.08.16 on release ve exp: till till current (i) Date of Start of the Project 31.08.16 31.08.16 31.08.16 month (ii) Date of completion of the Project (%age) ON-GOING SCHEMES 1 1223 Bulk Water Supply Project from River Jhelum to Rawalpindi 4254.770 1013.048 5.000 5.000 5.000 0.000 0% 1013.048 24% Funds released on 04.08.2016. Work is in progress. Murree However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 2 1224 Water Supply Scheme Fazaiyia Housing Colony Rawalpindi 373.663 50.000 25.808 25.808 25.808 6.700 26% 56.700 15% Work in progress. Turnol Tehsil & District Rawalpindi 3 1225 Installation of Water supply scheme for residents Attock 484.223 156.871 10.000 10.000 10.000 0.000 0% 156.871 32% Funds released on 04.08.2016. Work is in progress. of Fateh Jang Attock However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 4 1226 Water Supply Scheme Chakwal Based on Khai Chakwal 572.103 128.085 10.000 10.000 10.000 0.000 0% 128.085 22% Funds released on 04.08.2016. Work is in progress. Dam However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 5 1227 Est. of W.S. Scheme Talagang Chakwal 91.750 41.000 10.000 10.000 10.000 0.000 0% 41.000 45% Funds released on 04.08.2016. Work is in progress. However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 6 1228 Reh: of W.S. Scheme Kallar Kahar Chakwal 77.036 10.000 10.000 10.000 10.000 0.000 0% 10.000 13% Funds released on 04.08.2016. Work is in progress. However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 7 1229 W/S/S based on Naroomi Dhan Spring Phase-II Jhelum 288.227 265.980 10.000 10.000 10.000 0.000 0% 265.980 92% Funds released on 04.08.2016. Work is in progress. However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 8 1230 Comp: Urban Water Supply & sewerage Sargodha 195.437 184.308 11.129 11.129 11.129 0.000 0% 184.308 94% Funds released on 04.08.2016. Work is in progress. Drainage Scheme Phullarwan (Revised) However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 9 1231 Urban Water Supply Scheme Kot Momin Sargodha 184.332 152.282 10.000 10.000 10.000 0.000 0% 152.282 83% Funds released on 04.08.2016. Work is in progress. (Revised) However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 10 1232 Aug: of Water Supply Scheme, Sargodha based Sargodha 252.190 150.127 10.000 10.000 10.000 0.000 0% 150.127 60% Funds released on 04.08.2016. Work is in progress. on Canal Water Supply Sargodha. Phase-I However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 11 1233 Water Supply Scheme 49-NB (Tail) & Adjoining Sargodha 139.053 123.300 10.000 10.000 10.000 0.000 0% 123.300 89% Funds released on 04.08.2016. Work is in progress. Abadies in with improved material & better However payment not claimed by contractor due to sustainability Sargodha City Tax levied by PRA @ Rs.16% for which final decision awaited. 12 1234 Water Supply Scheme for Farooq Colony, Sargodha 97.990 31.000 10.000 10.000 10.000 0.000 0% 31.000 32% Funds released on 04.08.2016. Work is in progress. Imtiazabad Abad Sargodha City However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 13 1235 PC-II Conducting Study for Designing of Water Sargodha 8.000 4.964 1.536 1.536 1.536 0.000 0% 4.964 62% Funds released on 04.08.2016. Work is in progress. Supply Scheme & Sewerage System along with However payment not claimed by contractor due to Treatment Solution Sargodha City Tax levied by PRA @ Rs.16% for which final decision awaited. Sr. GS. No. Name of Scheme District Approved Exp Upto Provision for Revised Funds Funds %age Total Physical Remarks (including detailed physical No. Cost June 2016 2016-17 allocation for released by utilized utilization Accummulati progress progress) 2016-17 FD till till 31.08.16 on release ve exp: till till current (i) Date of Start of the Project 31.08.16 31.08.16 31.08.16 month (ii) Date of completion of the Project (%age) 14 1236 Water Supply Scheme Canal Park Sargodha city Sargodha 4.120 3.507 0.613 0.613 0.613 0.000 0% 3.507 85% Funds released on 04.08.2016. Work is in progress. However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 15 1237 Comprehensive Water Supply & Sewerage Khushab 328.747 320.280 8.467 8.467 8.467 0.000 0% 320.280 97% Funds released on 04.08.2016. Work is in progress. Scheme Khushab However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 16 1238 Comp. U/W/S & Sew: Scheme Jauharabad Khushab 500.886 412.319 10.000 10.000 10.000 0.000 0% 412.319 82% Funds released on 04.08.2016. Work is in progress. However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 17 1239 Comprehensive Water Supply & Sewerage Mianwali 493.846 474.444 19.402 19.402 19.402 0.000 0% 474.444 96% Funds released on 04.08.2016. Work is in progress. Scheme Mianwali However payment not claimed by contractor due to Tax levied by PRA @ Rs.16% for which final decision awaited. 18 1240 Urban Water Supply T.T.Singh (Revised) Toba Tek 851.476 765.476 20.000 20.000 20.000 3.400 17% 768.876 90% 1-Date of A.A (Revised) 10.04.2014 Singh 2-Date of T.S (Revised) 15-04-2014 3-Date of Prequalification 15.01.2011 4-Date of invitation of tenders 01.02.2011 5- Date of Receipt of tenders 07.02.2011 6- Date of work order 14.02.2011 7-Date of completion as per PC-I 08.12.2012 8- Anticipated date of completion 30.06.2017 (if full funds recieved) 9- No. of Beneficiary - 129271 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds (+/-) Nil Work is in progress. 19 1241 Urban Water Supply Scheme for Pir Mahal Toba Tek 344.269 335.806 8.463 8.463 8.463 1.500 18% 337.306 98% 1-Date of A.A (Revised) 22.01.2013 Tehsil Kamalia, District T.T. Singh Singh 2- Date of T.S (Revised) 28.01.2013 3-Date of Prequalification 11.09.2012 4-Date of invitation of tenders 01.02.2013 5- Date of Receipt of tenders 16.02.2013 6- Date of work order 21.02.2013 7-Date of completion as per PC-I 13.05.2014 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 69380 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds (+/-) Nil Work is in progress. 20 1242 Extension / Improvement of Urban Water Supply Toba Tek 154.441 140.262 14.179 14.179 14.179 2.500 18% 142.762 92% 1-Date of A.A 17.01.2014 Scheme Gojra City (Phase-I) District T.T. Singh. Singh 2- Date of T.S 23.01.2014 3-Date of Prequalification 23.01.2014 4-Date of invitation of tenders 22.01.2014 5- Date of Receipt of tenders 30.01.2014 6- Date of work order 08.02.2014 7- Date of completion as per PC-I 16.07.2016 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 268756 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds (+/-) Work is in progress. Sr. GS. No. Name of Scheme District Approved Exp Upto Provision for Revised Funds Funds %age Total Physical Remarks (including detailed physical No. Cost June 2016 2016-17 allocation for released by utilized utilization Accummulati progress progress) 2016-17 FD till till 31.08.16 on release ve exp: till till current (i) Date of Start of the Project 31.08.16 31.08.16 31.08.16 month (ii) Date of completion of the Project (%age) 21 1243 Comprehensive Water Supply Scheme Kamalia Toba Tek 459.088 139.725 38.000 38.000 38.000 9.000 24% 148.725 32% 1-Date of A.A 16.10.2014 City Singh 2- Date of T.S 28.11.2014 3-Date of Prequalification 08.12.2014 4-Date of invitation of tenders 07.12.2014 5- Date of Receipt of tenders 23.12.2014 6- Date of work order 31.12.2014 7- Date of completion as per PC-I 15.10.2017 8- Anticipated date of completion 30.12.2017 9- No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    148 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us