Fiber Optic – Rate Card Massdot Owned Land MBTA Owned Land

Fiber Optic – Rate Card Massdot Owned Land MBTA Owned Land

Fiber Optic – Rate Card MassDOT Owned Land MBTA Owned Land Longitutinal* Transverse Crossing* Zone 1 Rate $10.001 per linear foot per year Zone Tunnels Tunnels Red Line South Station to Harvard Station Rate Per Linear Foot per year $49.15 X Green Line Lechmere to Kenmore/Prudential Annual Escalation ** X Blue Line Bowdoin to Airport Per-Strand Multiplier $.07 per-fiber X Orange Line Community College to Ruggles Zone Urban Urban Silver Line Airport to South Station Rate Per Linear Foot per year $11.63 $10.61 Per-Strand Multiplier $.056 per-fiber Annual Escalation ** ** Zone 2 Rate $5.704 per linear foot per year Per-Strand Multiplier $.05 per-fiber $.05 per-fiber Red Line Harvard to Alewife Zone Suburban Suburban South Station to Braintree/Ashmont Rate Per Linear Foot per year $5.41 $4.67 Green Line Surface Annual Escalation ** ** Blue Line Airport to Wonderland Per-Strand Multiplier $.03 per-fiber $.03 per-fiber Orange Line Community College to Oak Grove Zone Exurban Exurban Ruggles to Forrest Hills Rate Per Linear Foot per year $2.40 $2.40 Commuter Rail Within 128 Annual Escalation ** ** Per-Strand Multiplier $.056 per-fiber Per-Strand Multiplier $.02 per-fiber $.02 per-fiber Zone 3 Rate $4.844 per linear foot per year Access Point Connections (Longitutinal ROW) Route 128 to Route 495 • Turnpike: $1.35141 per-foot-per-year, plus $472.9836 per- Per-Strand Multiplier $.033 per-fiber fiber-per-year, plus annual CPIU (All Boston) escalations, (2.5% Zone 4 Rate $2.579 per linear foot per year min.) per-year • Other Right-of-Way: No charge other than permit and other Beyond Route 495 one-time fees Per-Strand Multiplier $.023 per-fiber *Rates apply to any fiber optic cable with 216 strands or less. • Zones are based on the distance between stations and commuter Multipliers are applied to all strands above 216 strands on a per- rail (to the state line) strand-basis. Cables with 432 strands or more are subject to • Rate assumes a maximum of 216 strands on a cable for the baseline negotiations. rates above. Above 216 strands, rates are subject to negotiations. • Transverse Crossings are $5,305 per occupancy. **All rates on an annual basis are subject to CPIU (All Boston) • All rates on an annual basis are subject to CPIU (All Boston) escalations (3% min.) per year. escalations (3% min.) per year. Plan review fees apply to each application. • Plan review fees apply to each application..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us