Study on Orient / East-Med TEN-T Core Network Corridor

Study on Orient / East-Med TEN-T Core Network Corridor

Study on Orient / East-Med TEN-T Core Network Corridor 2nd Phase Final Report on the related Core Network in the Western Balkan countries 4th of December 2017 4th of December 2017 1 Study on Orient / East-Med TEN-T CNC, 2nd Phase, Final Western Balkan Report Table of content Table of content .................................................................................................... 2 Figures ................................................................................................................. 4 Tables .................................................................................................................. 4 Abbreviations ........................................................................................................ 6 Disclaimer ............................................................................................................ 7 1 Introduction .................................................................................................... 8 1.1 Background of this analysis ........................................................................ 8 1.2 Outline of this report ................................................................................. 8 1.3 Consortium information .............................................................................. 9 1.4 Executive Summary on Main Findings .........................................................10 2 Stakeholders identification ...............................................................................14 2.1 SEETO ....................................................................................................14 2.2 The Western Balkan states ........................................................................16 2.3 The neighbouring EU member states ..........................................................21 3 Existing studies review ....................................................................................23 3.1 SEETO Multi-Annual Plan 2016 ...................................................................23 3.2 The SEETIS Database ...............................................................................23 3.3 SEETO Flagship Report ..............................................................................24 3.4 Update of the Regional Balkans Infrastructure Study (REBIS) ........................24 3.5 WBIF Gap Analysis ...................................................................................25 3.6 Western Balkans Intermodal Study .............................................................26 3.7 National Infrastructure Project Pipelines ......................................................28 4 Characteristics of the Network ..........................................................................32 4.1 Alignment of the analysed corridor .............................................................32 4.1.1 Alignment .........................................................................................32 4.1.2 Statistical Information on the Corridor ..................................................35 4.1.3 Core Network Nodes of the OEM related WB Core Network ......................35 4.1.4 Corridor sections belonging to several corridor studies/consortia ..............37 4.2 Description of the Technical Parameters of the Corridor Infrastructure ............38 4.2.1 Rail infrastructure of the OEM related WB Core Network ..........................38 4.2.2 Rail Road Terminals ............................................................................48 4.2.3 Maritime Transport: Seaports ..............................................................53 4.2.4 Corridor road infrastructure .................................................................55 4.2.5 Corridor airport infrastructure ..............................................................62 5 State of Play of WB6 Networks .........................................................................66 5.1 Introduction ............................................................................................66 5.2 List of Infrastructure Works and Preparations ..............................................68 5.2.1 Implementation of Rail Infrastructure including RRT ...............................68 5.2.2 Implementation of Road Infrastructure .................................................69 5.2.3 Implementation of Maritime and Airport Infrastructure............................72 5.3 Environmental impacts, Decarbonisation and Climate Change Adaptation ........72 5.3.1 Mitigation of environmental impacts .....................................................72 5.3.2 Climate Change Resilience ...................................................................73 6 Potential Administrative and Operational Barriers and Measures ...........................75 6.1 Introduction ............................................................................................75 6.2 Rail ........................................................................................................78 6.3 Roads .....................................................................................................83 6.4 Deployment of ITS solutions ......................................................................85 7 Urban Nodes Analysis ......................................................................................87 7.1 Scope .....................................................................................................87 7.2 The Analysed Urban Nodes ........................................................................87 7.3 Methodology of the Analysis ......................................................................87 4th of December 2017 2 Study on Orient / East-Med TEN-T CNC, 2nd Phase, Final Western Balkan Report 7.4 Beograd ..................................................................................................89 7.5 Skopje ....................................................................................................90 7.6 Podgorica ................................................................................................91 7.7 Prishtine/Priština ......................................................................................92 7.8 Summary and Main Conclusions .................................................................93 8 Key Performance Indicators ..............................................................................94 8.1 Scope and Methodology ............................................................................94 8.2 Rail ........................................................................................................96 8.2.1 Realistic scenario ...............................................................................96 8.2.2 Optimistic scenario ........................................................................... 102 8.2.3 Summary of both scenarios ............................................................... 107 8.3 Ports..................................................................................................... 107 8.4 Roads ................................................................................................... 107 8.4.1 Realistic scenario ............................................................................. 108 8.4.2 Optimistic scenario ........................................................................... 110 8.4.3 Summary of both scenarios ............................................................... 111 8.5 Airports ................................................................................................. 112 Annex 1 Relevant Project Fiches ........................................................................... 113 Annex 2 Identified projects per transport mode ...................................................... 125 Annex 3 Urban Nodes Analysis ............................................................................. 133 4th of December 2017 3 Study on Orient / East-Med TEN-T CNC, 2nd Phase, Final Western Balkan Report Figures Figure 1: Schematic overview map of the Orient / East-Med Corridor indicative extension in the WB Region (brown colour) ............................................32 Figure 2: Alignment of the Orient / East-Med Corridor related WB core network (Road network) ............................................................................................33 Figure 3: Alignment of the Orient / East-Med Corridor related WB core network (Rail network) ............................................................................................34 Figure 4: Overview on core network urban and traffic/logistic nodes on the OEM Corridor related WB Core Network ........................................................36 Figure 5: Overlapping of the analysis networks in the Western Balkan countries with other corridor studies ..........................................................................37 Figure 6: Rail alignment of the Western Balkan ....................................................38 Figure 7: Maximum operating speed on the OEM WB rail network (2014) ................40 Figure 8: Maximum train length on the OEM WB rail network (2014) ......................41 Figure 9: Maximum axle load on the OEM WB rail network .....................................42 Figure 10: Electrification on the OEM WB rail network .............................................43 Figure 11: Core Rail Road terminals in the Western Balkan ......................................49 Figure

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    145 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us