Caltrain Funding 101

Caltrain Funding 101

Caltrain Funding 101 Prepared for: SFMTA Board Meeting Prepared by: Caltrain Staff Date: February 7, 2012 Caltrain Funding 101 Overview • Funding contribution is guided by Joint Powers Agreement • Funding for Caltrain Operations • Funding for Caltrain Capital Projects 2 Funding for Caltrain Operations • Member Agencies provide operating contributions to the JPB according to the Joint Powers Agreement (JPA) • After fares and other funding sources, the JPA provides that each member subsidize the operating budget based upon each county’s morning peak hour boarding • In FY2006, the Members agreed to an annual increase of 3% • Since FY2009, Member contributions have been frozen • In FY2011, SamTrans reduced its contributions, but did “fund swaps” to keep its contribution near FY2010 levels for FY2011 and FY2012 3 Summary of FY2012 Budget (in millions) Total Revenues % Total Expenses % Fares $ 54.0 50% Rail Op Contract & Maint $ 63.0 59% Parking 3.0 3% Contract Transition Costs 4.7 4% Other Income 5.8 5% Fuel 15.2 14% AB434 & Grants 10.3 10% Other Operating Expenses 11.7 11% Member 25.3 24% Administrative 10.6 10% Agencies Other Sources 9.0 8% Long-term Debt 1.1 1% Total Revenue $107.4 100% Total Expenses $106.3 100% Revenue over Expenses $ 1.1 4 Commuter Railroads FareBox Recovery Ratio Comparison Caltrain’s farebox recovery ratio is comparable with other commuter rail systems in the country. 70.0% 58.9% 60.0% 51.2% 47.4% 46.1% 50.0% 36.7% 40.0% 30.0% 18.4% 20.0% 14.0% 9.5% 10.0% 0.0% CalTrain ACE VRE LIRR Tri-Rail Coaster Front Runner Rail Runner (NCTD) (UTA) (Rio Metro RTD) Sources: FY2009 NTD Reports 5 Member Agency Operating Contributions Historical Member Agency Operating Contributions $40 $7.0 $7.0 $6.6 $6.8 $6.2 $30 $6.0 $15.4 $15.9 $15.9 $15.0 $14.1 $4.5 $20 $13.5 Millions $10.2 $10 $15.6 $16.0 $16.5 $16.5 $14.7 $10.6 $14.0 $0 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013* SamTrans VTA CCSF Sources: FY2007-2010 Financial Statement, FY2011 and FY2012 Adopted Budgets; FY2013 Preliminary Budget * Projected level of member contribution based on estimated SamTrans’ share of $14.0 million in FY2013. 6 Joint Power Agreement (JPA) Boarding Formulas • Per the original JPA (as amended October 3, 1996), each member agency shall subsidize the Caltrain operating budget based upon each county’s morning peak hour boarding. • Since 2006, the current share of Caltrain operating expenses is divided among the member agencies on the following basis: – SamTrans 42% – VTA 41% – SFMTA 17% • Based upon the Feb 2011 Caltrain passenger counts, the AM peak boardings within each county would be: – SamTrans 35.1% – VTA 43.8% – SFMTA 21.1% • Based upon the Feb 2011 Caltrain passenger counts, the total boardings within each county the breakdown would be: – SamTrans 32.5% – VTA 40.8% – SFMTA 26.7% 7 Average Weekday Boardings in SF (Data source: annual passenger counts conducted each February) Year 4th & King 22nd St. Bayshore SF Station System SF % of Total Total Total 2006 6,713 729 150 7,592 29,760 25.5% 2007 7,230 767 155 8,152 31,507 25.9% 2008 7,759 817 150 8,726 34,611 25.2% 2009 7,996 863 134 8,993 36,232 24.8% 2010 8,038 840 125 9,003 34,120 26.4% 2011 8,897 1,036 138 10,071 37,779 26.7% 8 Discussions for FY2014 and beyond • Revision to cost sharing formulas is being considered • VTA to restore payment obligations toward Gilroy service is also being considered 9 Funding for Caltrain Capital Programs • Per JPA, outside of grants and other revenues, Member Agencies share equally on capital project costs • Capital program focuses on state-of-good repair projects; and it fluctuates year-to-year due to: asset life cycles Regulatory/legal requirements Caltrain modernization 10 Caltrain Capital Budget by Category ($M) State of Good Repair $200.0 Legal Mandates and Enhancements 1 $66.0 Electrification/Caltrain Modernization $150.0 Capital Support and Contingency 2 $100.0 $120.7 $129.0 $81.9 $50.0 $38.4 $50.2 $0.5 $0.5 $25.4 $25.0 $2.9 $2.4 $19.5 $7.3 $6.0 $8.7 $9.5 $0.0 $3.4 $6.3 $2.2 $2.0 $2.0 '07 '08 '09 '10 '11 '12 1 This category includes safety and security improvements; FY10 includes San Bruno Grade Separation and FY12 includes Caltrain PTC 2 In 2007, $23M is for Dumbarton Rail Caltrain Capital Budget by Funding Source ($M) Members $200.0 $16.6 Other 1 State Federal $150.0 $86.3 $10.7 $5.0 $28.1 $100.0 $58.8 $58.0 $9.5 $67.2 $8.2 $50.0 $8.3 $5.3 $31.5 $13.7 $45.0 $38.8 $4.0 $6.4 $41.5 $26.3 $17.5 $15.5 $- '07 '08 '09 '10 '11 '12 1 The "Other" sources include county specific local match funds Caltrain Modernization Program Prepared for: SFMTA Board Meeting Prepared by: Caltrain Staff Date: February 7, 2012 Key Projects • Advanced Signal System • Caltrain Electrification • HSR Coordination 14 Advanced Signal System • CBOSS PTC • Communication based overlay signal system (CBOSS) – Caltrain operating needs – Increase capacity • Positive Train Control (PTC) – FRA safety requirements – Unfunded mandate • Implement Project by 2015 15 Caltrain Electrification • Purpose – Improve performance – More service – Improve air quality – Decrease O/M subsidy • Project – Diesel to electric – 5 to 6 trains / peak hour / direction • Implementation TBD 16 HSR Coordination • HSR approved by voters • Caltrain corridor selected to support HSR • Both systems need electrified corridor • Caltrain and HSR partnership • Combine resources to modernize corridor 17 Peninsula Vision Blended System What? • Supports integrated Caltrain and HSR service • Upgrade railroad from SJ to Transbay Terminal • Maximize use of existing tracks Why? • Minimize community impact • Lower project cost • Advance project delivery 18 Corridor Capacity Analysis Is the “blended system” concept feasible? Multiple considerations – Operational – Infrastructure – Funding Strategy 19 Computer Simulation Existing Railway • System – Electric – Advanced Signal System • Tracks – Existing Mainline Tracks – 3 HSR Stations – Additional Passing Tracks 20 Key Findings Blended system concept has merit Potential: Up to 10 trains / hour / direction # of Trains Without With Passing Tracks Passing Tracks Caltrain 6 6 HSR 2 4 21 Next Steps • Finalize capacity analysis • 2 new planning studies – Stakeholder requested simulations – Grade crossing analysis • Model expansion to DTX 22 Overall Planning Process 23 Q/A 24 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us