Proposed Improvement of Interstate 80/94

Proposed Improvement of Interstate 80/94

Proposed Improvement of Interstate 80/94 Interstate 294 to U.S. Route 41 (Calumet Avenue) Cook County, Illinois Lake County, Indiana T.H.E. Conference – University of Illinois February 24, 2004 Regional Map Project Dates • July 1995 – Project Initiated • May 1999 – Funding Announced through Illinois FIRST • September 2001 – Begin Phase II Design • November 2001 – Public Hearing • June 2003 – Design Approval • August 2003 – First of Over 25 Contract Awards Project Location Traffic Volumes Current: 130,000 - 159,000 Vehicles per Day Projected 2020: 164,000 - 192,000 Vehicles per Day 27 % Multi-Unit Trucks Needs Identified • Improve Highway Safety • Improve Mobility • Improve the Configuration and Condition of the Roadway Project Overview EB I-80 to NB I-94 I-80/I-94 Junction WB I-80/94 Split WB I-80 Under Capacity Torrence Ave Interchange BERNICE ROAD 176th PLACE Proposed Features • Proposed Improvement Plan – Complete Reconstruction – Four Continuous Through Traffic Lanes in Each Direction – Auxiliary Lanes for Entrance and Exit Maneuvers – Drainage System – Elimination of 2 Pump Stations – Noise Abatement Walls – Roadway Lighting Origin-Destination Study – 354267 % of westboundeastboundtraffic is through traffictraffic traffic exitingfrom Torrencecontinuing at Torrence Avenue east- Avenuecontinueswest along comes west Interstate onfrom Interstate Interstate 80 80 94 I-80/I-94/IL 394 Interchange Flyover to I-94 4 Through Lanes To Torrence Ave Flyover to IL 394 I-80/94 Reconfiguration I-80 I-94 / IL 394 4 Through Lanes I-94 IL 394 To Torrence Ave C-D Road Torrence Ave Interchange 3 Travel Lanes in Each Direction Environmental Stewardship • Illinois Department of Natural Resources • Illinois Nature Preserve Commission • Forest Preserve District of Cook County • US and Illinois EPA • Army Corps of Engineers • US Fish and Wildlife • Illinois Historic Preservation Agency • University of Illinois – Archeological Dept Environmental Resources Exceptional Natural Communities Wetlands Floodplain Volbrecht Woods Orchid Locations Natural Area Natural Areas & Preserves Volbrecht Woods Zander’’’ s Natural Woods Area Nature Prairie Remnants Archeological Site Avoidance/Minimization • Alignment Studies • Interchange Configurations • Retaining Walls • Special Commitments – Low Weight Vehicles – Drainage Restrictions – Preconstruction Training – Off-Limit Areas Associated Impacts • Wetlands: 3.86 Acres • Tree Removal: 3,593 Total – (2,122 @ Interchange, 1,471 Elsewhere) • Floodplain: Thorn Creek & Little Calumet River • Business Relocations: 10 • Business Impacts: 11 Parking and Building Modifications • Residential: None Noise Abatement • Both Sides of I-80/94 from west of Torrence to U.S. Route 41 • West Side of I-94 north of 170th Street Land Acquisition • Approximately 23.3 Acres of Right-of- Way Required • Approximately 4.7 Acres of Temporary Construction Easements Required • Approximately 3.1 Acres of Give Back to Cook County Forest Preserve District Puzzle Master I-94 EB Bridge Abutment I-94 EB Temporary Widening I-94 EB Temporary Widening IL/IN Stateline Looking West Railroad Ave Looking West Welcome to Illinois Gateway Welcome to Indiana Gateway Website Project Management Website Project Management Website Project Management Maintenance of Traffic 2004 • Same Number of Lanes on I-80 and I-94 • Indiana – I-80/94 from Calumet Ave. to Cline Ave. (3 Lanes in each direction) 2005 • I-80 - 3 Lanes each Direction • I-94 Reduced to 2 Lanes each direction • I-94 EB Reduced to 1 Lane at I-80 Merge • IL 394 Reduced to 1 Lane each direction • Indiana – I-80/94 from Cline Ave. to Grant St. (3 Lanes in each direction) Maintenance of Traffic 2006 • I-80 – 3 Lanes each Direction • I-94 – Reduced to 2 Lanes each Direction 2007 & 2008 • Indiana Construction of I-80/94 at I-65 Interchange 2002 Construction I-80/94 Resurfacing 2003 Construction I-94 EB Grading 2003 Construction I-94 EB Grading I-80/94 & I-94 Temporary Widening 2 - Lighting Procurement Contracts 2004 Construction 170th Street 2004 Construction 170th Street Wentworth Avenue 2004 Construction 170th Street Wentworth Avenue I-94 EB Paving 2004 Construction 170th Street Wentworth Avenue I-94 EB Paving Ramp J Flyover Bridge 2004 Construction 170th Street Wentworth Avenue I-94 EB Paving Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI 2004 Construction 170th Street Wentworth Avenue I-94 EB Paving Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls 2004 Construction 170th Street Wentworth Avenue I-94 EB Paving Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls Thornton-Lansing Road 3 – Beam Fabrication Contracts 2004 Construction 170th Street Wentworth Avenue I-94 EB Paving Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls Thornton-Lansing Road 3 – Beam Fabrication Contracts Highway Lighting Installation 2004-05 Winter Construction Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls Thornton-Lansing Road Highway Lighting Installation 2005 Construction Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls 2005 Construction Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls I-80 Mainline Contract I-80/94 Mainline Contract I-80/94 Mainline Contract 2005 Construction Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls I-80 Mainline Contract I-80/94 Mainline Contract I-80/94 Mainline Contract I-94/IL 394 NB Lanes and Ramp G Flyover Bridge 2005 Construction Ramp J Flyover Bridge IL 83 - Torrence Avenue SPUDI Local Roads and Retaining Walls I-80 Mainline Contract I-80/94 Mainline Contract I-80/94 Mainline Contract I-94/IL 394 NB Lanes and Ramp G Flyover Bridge Highway Lighting Installation 2005-06 Winter Construction Ramp G Flyover Bridge Highway Lighting Installation 2006 Construction Ramp G Flyover Bridge I-80 Mainline Contract I-80/94 Mainline Contract I-80/94 Mainline Contract 2006 Construction Ramp G Flyover Bridge I-80 Mainline Contract I-80/94 Mainline Contract I-80/94 Mainline Contract I-94/IL 394 SB Lanes 2006 Construction Ramp G Flyover Bridge I-80 Mainline Contract I-80/94 Mainline Contract I-80/94 Mainline Contract I-94/IL 394 SB Lanes Highway Lighting Installation 2007 Construction Projectwide Landscaping Contract Unique Items on Project • 3 Levels of Interchange under Construction at the same time with 3 different Contractors • Interchange located within a Forest Preserve • Environmental Training Sessions held prior to Construction for Prime Contractor & Sub- Contractors on every Contract • Using standards from ISTHA, INDOT & IDOT • Removal of 2 Pump Stations • $155 Million in Construction Work by June 2004 By the Numbers 2006 Construction Completion • 1 Multi-Use Recreation Path at Railroad Avenue • 2 Interchanges Reconstructed • 3 Interstates and 1 State Route • 10.5 Kilometers (6.5 Miles) of Roadway will have been Reconstructed • 23 Bridges including 2 - _ Mile Flyovers • 42 Retaining Walls including a 10 meter (33 foot) Counterfort Retaining Wall • 122 High Mast Light Towers By the Numbers 2006 Construction Completion • 3,600 Meters (12,000 Feet) of Sidewalk • 29,500 Meters (97,000 Feet) Fiber Optic Wire • 62,000 Metric Tons (68,300 Tons) Bituminous Asphalt Pavement • 179,000 Meters (587,000 Feet) Roadway Pavement Marking • 2 Million Cubic Meters (70 Million Cubic Feet) Embankment • 10 Million Kilograms (22 Million Pounds) Rebar • 16 Million Kilograms (35 Million Pounds) Structural Steel .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    64 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us