Kraf 5396-Nordel Årsber 05 SV

Kraf 5396-Nordel Årsber 05 SV

Annual Report 2007 Cover photo:Tuomo Kouti 2 Contact infor Organisation . .36 Statistics . .28 TSO co-operationing Importantduring events 2007 ..20 Netw System responsibility and operation ..10 Electricity market . .6 Report of the Board . ..4 Nordel . .3 Contents ork development ..14 mation . r id planningwithinNor del ..22 39 Nordel Nordel is the collaboration organisation of the Trans- The most superior decision-making body is Nordel's mission System Operators (TSOs) of Denmark, Finland, annual meeting.The annual meeting elects the President Iceland, Norway, and Sweden. of Nordel for a period of two years.The Presidency rotates between the countries.The President appoints Nordel’s objective is to perform the following core tasks Nordel’s secretary and is responsible for the secretariat of system responsibility across the national borders: and its costs. Nordel has no budget of its own. • to ensure the operational security of the power system, The Nordel Board consists of the chief executive offi- • to maintain the instantaneous balance between cers of the TSOs.The Board has overall responsibility supply and demand, for the work within Nordel. • to ensure the long term adequacy of the trans- mission system, A major part of Nordel’s work is carried out by the • to enhance the efficient functioning of the Market, Operations, and Planning Committees as well as electricity market. working groups.The Committees consist of the leaders in the corresponding sections of the TSOs.The working Nordel continuously exchanges views with the authori- groups are staffed by the TSOs' experts. ties and the market participants.This is important for the evolution of an efficient electricity market and main- taining the security of supply. Key figures for 2007 Nordel Denmark Finland Iceland Norway Sweden Population mill. 25.0 5.5 5.3 0.3 4.7 9.2 Total consumption TWh 412.6 36.4 90.4 12.0 127.4 146.4 Maximum load1 GW 61.1 6.1 12.5 1.3 18.6 22.7 Electricity generation TWh 409.2 37.0 77.8 12.0 137.4 145.1 Breakdown of electricity generation: Hydropower % 55 0 18 70 98 45 Nuclear power % 21 - 29 - - 44 Other thermal power % 21 81 53 0 1 10 Wind power % 3 19 0 - 11 Geothermal power % - --30- - 1) Measured 3rd Wednesday in January - = Data are non-existent 0 = Less than 0.5 % 3 Report of the Board Co-operation - the fastest and most The first multiregional planning process with the Baltic and Polish TSOs has been established, covering the efficient way to enhance regional and Nordic and Baltic power systems as well as part of the European developments continental power system. The TSOs have an important role in facilitating the An efficient integration of the electricity markets electricity market and in maintaining and developing requires common market structures and harmonisation the physical infrastructure for electricity trading.The of the trading rules. Diverging developments of the sub- Nordic electricity market has often been referred to regions can jeopardize progress in European integration. as a forerunner and an example of a well-functioning To ensure a coherent development in the Nordic coun- regional electricity market.The Nordic TSOs have shown tries and Central West Europe, Nordel proposed the a good track record in contributing to this development establishment of a common body for these regions by and in ensuring a high level of security of supply. merging the existing Northern European and Central West European Regional Initiative areas in January 2008. Nordel is strongly committed to develop a seamless Nordic The Regional Initiative areas were established in 2006 electricity market and to integrate it further with the by the European Regulators' Group for Electricity and neighbouring regions. Nordel is also confident that the Gas (ERGEG) as a step in integrating the national markets. co-operation between the unbundled TSOs is the fastest and most efficient way to enhance regional and European More efficient functioning of the Nordic development. In the spring of 2007, Nordel identified the most important actions to ensure development both power system on the Nordic and multiregional level, and will imple- ment them during the next years. Investments in the grid reinforcements and principles for congestion management in the operational phase are Increasing focus on multiregional the most significant tools of the TSOs to contribute to the functioning of the electricity market in the long and co-operation short term. Implementation of the package of five pri- oritized Nordic grid reinforcements, worth more than The development towards a single European market one thousand million euros, is progressing with some will bring new challenges in the co-operation between changes and delays in the schedules.The original South the TSOs, especially across the regional borders. Link project in Sweden will be replaced with a South- New interconnections and reinforcements of the existing West Link project including a higher transmission capacity ones increased the transmission capacity to the continent in Sweden and a new interconnection to Norway. and the Baltic countries in 2007.The total import capa- Nordic Grid Master Plan 2008 was released in March city to the Nordic countries was increased by 1,200 MW 2008.The report identifies the Nordic grid reinforce- and the export capacity by 1,350 MW.New intercon- ments to be implemented by 2025 and potential grid nections to Continental Europe, the Baltic countries reinforcements from the Nordic countries to the neigh- and Poland are also planned. bouring regions. Nordel recommends the launching of more detailed studies of the identified projects.These New interconnections together with further market projects will reduce the congestions in the Nordic grid. integration will lead to growing complexity in operating and planning the power system.Therefore, strengthened The grid investments in the Nordic countries increased co-operation with the TSOs in the neighbouring regions substantially in 2007 reaching a level of about 500 mil- is in focus on Nordel's agenda.The co-operation includes lion euros. During the next years the grid investments planning and interoperability of the power systems and will further increase to over 600 million euros.The market planning issues. investments are used to build an adequate and robust Nordic transmission system for security and supply and Market coupling of the Nordic market with Central to connect new power plants to the grid. West Europe (Belgium, France, Germany, Luxemburg and the Netherlands) is the next big step to integrate During the wet summer and autumn of 2007, the high the European market. It is planned to be implemented hydropower production in Southern Norway resulted in at the beginning of 2009.Then, the integrated market considerable congestions on the interconnections to the will cover almost half of the European electricity demand. neighbouring countries.The total congestion rent in the The integration process is driven in co-operation with Nordic market increased to 174 million euros, which is the TSOs and the Power Exchanges. the highest level so far. In 2007, Energinet.dk, Fingrid, 4 Statnett and Svenska Kraftnät entered into a new agree- Future development of regional ment on the sharing of the congestion revenues between TSO co-operation the TSOs.The agreement is valid until 31 December 2011. During the term of contract the sharing key will The EU Commission published a proposal for the 3rd be gradually changing to a principle where the revenues package of European energy legislation in September between two prices areas are divided equally between 2007.The Commission proposed to strengthen co- the corresponding TSOs. operation between TSOs by establishing a European Nordel has agreed on harmonised principles for balance Network of Transmission System Operators for Electrici- management.The principles will be implemented natio- ty (ENTSOE).The purpose of ENTSOE is to facilitate nally by the beginning of 2009. Harmonisation on the the efficient functioning of the European electricity wholesale level thus paves the way for the development market. Nordel supports this proposal. of a Nordic retail market. Strenghtened TSO co-operation provides the best pre- Introduction of a Nordic intra-day market (Elbas) took requisites for the further development of the European a step forward when Elbas was established in Western electricity sector.The new co-operation structure will Denmark in 2007.The first regional intra-day market in also serve as a "home base" for the current regional the world will be a reality when Norway will join the TSO co-operation in Europe, and Nordic co-operation Elbas market. will continue as an integral part of ENTSOE. Transparency of market information is important for an New President of Nordel efficient electricity market, and it also contributes to security of supply. Nordel has actively contributed to From 7 February 2007 Jukka Ruusunen, President & the improvement of transparency using the website of CEO of Fingrid Oyj, serves as the President of Nordel Nord Pool Spot as a platform. European market trans- during the remaining period of the Finnish Presidency parency is also improved by releasing information on lasting until the Annual Meeting in June 2008. ETSOVista, the European website for market informa- Jan Magnusson left his position as Director General of tion in Europe developed by the European TSOs. Svenska Kraftnät at the end of March. Sture Larsson, Acting Director General of Svenska Kraftnät, replaced him in the Board from 1 April 2007. The members of the Board and the Chairmen of the Committees Jukka Ruusunen, Odd Håkon Peder Østermark Sture Larsson, Thordur Fingrid Oyj Hoelsæter, Statnett SF Andreasen, Svenska Kraftnät Gudmundsson, (President) (Vice President) Energinet.dk Landsnet hf. Outgoing Board member on 31 March 2007 Bente Hagem, Per Sørensen, Ulf Moberg, Jan Magnusson, Statnett SF Energinet.dk Svenska Kraftnät Svenska Kraftnät (Market Committee) (Operations Committee) (Planning Committee) 5 The laying of the NorNed cable between Norway and the Netherlands.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    40 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us