Annual Action Plan Saiha 2013

Annual Action Plan Saiha 2013

ANNUALACTION PLAN 201 3-20L4 I UNDER S +" I I BACKWARD REGION GRANT FUND Rs. L44L00 Lakhs SAIHA DISTRICT fi ANNUALA ACTION PLAN IINDER BRGF 20 3-20 DULY APPRO\rE BY DPIC SAIHA RD'BI .OCK ...:...:' Amount,, , a ,,":, ., , Narir6,of. , ],,fotal , already .Proposed, Amount (in sanctione AmoUntfoi it,.Jakh:),, . d:(in',.,,, 2013-14,,.,, :':'::: . 'l lAkhcl', ':: 1.,.t 7 2 3 4 5 6 7 I 9 10 Completion of agri link road between Rawmibawk and R. 7 Amotla 1.5km 1.5km 10.00 10.00 Kolodyne Continuing construction of Balu road from Siata to 2 Siata 3km 1.3km 10.00 10.00 Agri Link Singbawng (Beino) Rood 3 Maintenance of road between Niawhtlang to Hmairem Niawhtlans 14kms 14kms L0.00 10.00 Maintenance of road between Ainak to Chiamang 4 Ainak Bkms Bkms 10.00 10.00 includins 2 nos of culvert Sub Totol 40.00 0.00 40.00 Construction of RCC Culvert below Region Tuikhur at 7 Council Vaih 1 unit 1 unit 5.00 s.00 Council Vaih 2 Construction of culvert on Balu road at Tioi Ferrv Tipi Ferrv 2 unit 2 unit 5.O0' 5.00 l Construction of culvert on graveyard approach road at Culvert 3 Tipi Ferry 1 unit 1 unit s.00 5.00 d TipiFerry Construction of 2 nos of Culvert below AR Complex at -i 4 CouncilVfth 2 unit 2 unit 10.00 10.00 t Council Vaih Sub Total 25.00 0.00 25.00 Construction of drain at Saiho deep gorged below 7 Siata 60mx1.50 60mx1.50 5.00 5.00 PMGSY Culvert at Siata Construction of Link drain from C Vanmawia's house to 180mx1.5 2 Baptist Church upto end of VL Siama compound at College Veng-ll 1B0mx1.5m 10.00 10.00 m AGRICULT Collese Vaih - ll URE AND Construction of Drainage with step over head ALIED 3 ECM Vaih 35x1.83m 35x1.83m 10.00 10.00 I between DK Heitha house and ECM Vaih water point SECTOR Drainages Construction of RCC Drainage from ARCS road to 4 ECM Vaih 60mx1.5m 60x1.5m 5.00 s.00 Thingsen road Construction of Link Drain on ravine from PWD Road 5 to BRTF Road at Zyuhmao zoh-I near NH Pakhai Meisavaih E B0mts B0mts 8.00 8.00 residence Construction of Drainage with step over head 6 between PWD Road nearA. Beikhai House and MADC Meisavaih W 150mts 150mts 8.50 8.50 Road near C Meleka House Construction of Drainage from TKP tuikhur to PWD 7 NewSaihaE-ll road 60mxl-.Bm 60mx1.Bm 6.00 6.00 Construction of RCC drainage PWD road Bazar near I Siaha Vaihpi 50mx1.83 50mx1.83 5.00 5.00 Beitlualai residence to ioint link drain Construction of Drainages between Meisatla Halipad 9 Meisatla 150m 150m 15.00 15.00 near Dawlai [L) residence and BRTF Road Construction of RCC sidedrain between Chhumiraha's 70 Siahatla - ll 80m x 1.5m 80m x 1.5m 9 9.00 house and H Vadia's house at Siahatla-ll Construction of RCC sidedrain between K Thakhar's 77 Siahatla - lll 75m x 1.5m 75m x 1.5m 8 8.00 house and T Lianzara house at Siahatla - lll Construction of Masonry link drain from khurpui to 72 New Colony - ll 70m x 1.5m 70m x 1.5m 7 below YMA Hall at New Colony 7.OO Construction of RCC drainage with step below Fishery 73 Siaha Vaihpi 70m x 1.5m 70m x 1.5m 15.00 r.5.00 I department to PWD road M 74 Link drain between K Tleiko and LC Mawsi (L) house at Saiha Vengpui - lll , 1 unit 1 unit 5.00 5.00 \. i Sub Total 776.50 0.00 776.50 Sonstruction of RCC Step approach from near HC Ngolai 7 Siaha Vaihpi 100x1.83 100x1.83 8.00 8.00 :esidence to PWD Road near C Dawkho residence Construction of RCC Step near Pu Zathawnga's 2 Saihatlangkawn-l 100mtrs 100mtrs residence 5.80 5.80 RCC Steps from road below Tourist Lodge up to 3 New Saiha W 50mxL.5m 50mx1.5m 5.00 Sanglurnu's house. 5.00 Conctruction of RCC Step from Community Hall via p/S 4 NewSaihaE-ll 150x1.83m 150x1.83m s.00 5.00 il | soctAL compound upto upper PWD road at New Saiha E - ll I INFRASTR Step Construction of RCC Step from Khitha's house to pWD I urru*, 5 NewSaihaE-ll 120x1.83m 120x1.83m 7.00 7.OO road at New Saiha E - ll Construction of RCC Step from UPC Water point to N 6 New Colony - ll 80mx1.83 80mx1.83m 7.00 7.OO Chama Residence at New Colony - ll Construction of RCC Step with railing from Bus Station to 7 New Colony - Khurpui road at New Colony - ll ll 50mx1.83m 50mx1.83m 5.00 5.00 Construction of RCC Step from Vakua water point to L I New Colony - lV Dakhe's Residence at New Colony - lV 60x1.88m 60x1.BBm 5.00 5.00 9 Construction of Masonry step at Amotla Amotla 50x1.83m 50x1.83m s.00 5.00 Construction of RCC Step 70 from V. Nonai Residence to 100x1.83 Meisavaih 100x1.83m 6.00 MADC Road near K Biakvela residence of Babuvaih m 6.00 Construction of RCC Step from Playground 77 to Khaisa 100mx1.5 Chhuarlung-ll 100mx1.5m 5.80 House m 5.80 Construction of RCC Step from upper 72 NH 54 road to College vaih - | 100mx1.8 100mx1.8 Iower CPWD road at College Vaih - | 10.00 10.00 :onstruction of RCC Step from region tuikhurto HC 73 Council Llunthanga house at Council Vaih Veng 100mts 100mts s.00 5.00 Construction of RCC Step from MADC road near C 74 Seihmo house to upper BRG&road below Chalsanga,s College Vaih - ll 100x1.83m 100x1.83 8.00 8.00 I house site pass at College Vaih - ll Construction of RCC Step >. 75 between Donbosco and L. -{ Sapaw Residence New Colony IV 100mts 100mts 5.80 5.80 Construction of RCC Step from PWD Road near i 76 Vabeikhu house to MADC Road near N. Hiala Meisavaih W 75x1.83m 75x1.83m 5.00 5.00 Residence Construction of RCC Step from PWD Road near 77 Beimosa House to MADC Road via Chohmo fH Meisavaih W 75x1.83m 75x1.83m 5.00 5.00 Residence Construction of RCC Step From pC.Sanglawma 78 house to Thingsen road Council Veng 100mx2m L00mx2m 7.so 7.50 Construction of RCC Step from R Zedi House to pWD 79 Meisavaih E road at Meisavaih E 70x1.83m 70x1.83m 5.00 5.00 Sub Total 775.90 0.00 775.90 7 Completion o{Community Hall at Chhualung Chhuarlung 1 unit 1 unit 7.O0 7.O0 2 Completion of MYA Hall at New Saiha New Saiha 1 unit 1 unit 20.00 20.00 3 Construction of CommuniW Hall at CH Maubawk Maubawk CH 1 unit l- unit 30.00 10 20.00 Completion of Community Hall cum bazar shed at Hall 4 Council Council Veng fMarket Portion) Veng l unit L unit 25.00 25.00 5 of Tuisumpui Community 9ompletion Hall TuisumpuiOld 1 unit 1 unit 10 10.00 6 Construction of Community Hall at New Colony - I New Colony - I 1 unit 1 unit 30.00 5.50 Sub Totql 87.50 7 Construction of Pavilion at Rawmibawk Rawmibawk Pavillion 1 unit L unit 5.00 5.00 5.OO 7 Complqtion of Playground at Siata Siata 1 unit 1 unit 5.00 5.00 2 Construction of Playground at Riasikah Riasikah 1 unit 1 unit 10.00 10.00 Playground j Construction of Playground at Thiahra Thiahra 1 unit 1 unit 20.00 10.00 4 Completion of Playground at Thingsen Thingsen 1 unit L unit 30.00 25 10.00 Sub Total 65.00 25.00 35.00 7 Construction of Godown at Thiahra Godown Thiahra 1 unit L unit 10.00 10.00 Sub Totdl 70.00 0.00 70.00 7 Construction of KNP Haat at Council Vaih louncil Vaih L unit 1 unit 10.00 10.00 Hoot / Shed 2 Construction of Bazar shed at Niawhtlane - Il Niawhtlans - II 1 unit l unit 10.00 10.00 Sub Totol 20.00 0.00 20.00 Approoch Continuing construction ofgpproach road to Tia-ao _ 7 Theiva I 'road Kawlchaw from NH-54 6kms 2.5kms 40.00 25 15.00 /o 40.00 25.00 75.00 Soiling & Metalling of ECM Church to primary School at 7 Maubawk Maubawk CH CH 25mx3.75m 25mx3.75m s.00 5.00 I Soiling and metalling of road from Donbosco,s gate to 2 New Chhochhopaw water point. Colony lll 40mts 40mts 8.2s 8.25 Soiling, metalling and blactopping of road from 3 - Solling, Richaby to Lungbun Lungbun II 12kms 1.5kms 360.00 30.00 Metalling ROAD Soiling and metalling of road from Meisatla pWD road to 4 Saiha Vengpui-l ilt COMMUN DC Office approach road via Health Sub-Centre 600mts 600mts 10.00 10.00 ICATION Soiling & Metalling of Road within 4 lgth Assam Riffle New E Complex Saiha 4 4.00 Sub Totql 387.25 0.00 57.25 Rigid pavement of road 7 between DZ tlang and MADC Judicial quarter New Saiha'W' 250m 250m 5.00 5.00 Rigid Pavemnet Over existing road pproach 2 to Siaha Pavement Vaihpi graveyard Siaha Vaihpi 1km 1KM 30.00 18.00 Rigid Pavemnet on approach to Tourist 2 Lodge at Maubawk L Maubawk L 50m 50m 10.00 10.00 Sub Totql 45.00 o.00 33.00 Construction of Retaining Wall below Playground near 7 Chhuarlung-l Pu.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us