DISTRICT 8 URGENT NEEDS ROADS HIGHWAY PROJECT/DESCRIPTION COST I-35 21st Ave to Garfield TPP#1 $270,570,000 I-35 27th Ave to Garfield TPP#2 $270,570,000 8 2-4 lane expansion $58,520,000 10 Wadena: 2-4 lane expansion $39,210,000 371 Jenkins to Pine River: 2-4 lane expansion $48,020,000 371 TH 210: construct interchange $43,040,000 169 Pengilly to Bovey: 2-4 lane expansion $75,530,000 169 CSAH 7 to TH 65: 2-4 lane expansion $75,530,000 210 Pillager to Ironton: 2-4 lane expansion $98,480,000 10 Royalton: construct interchange $35,280,000 210 Motley to Baxter: 2-4 lane expansion $86,250,000 169 CSAH 7 to CSAH 80: 2-4 lane expansion $28,150,000 61 40th Ave: construct roundabout $14,990,000 169 CSAH 83 to TH 65: 2-4 lane expansion $18,530,000 I-35 CSAH 3: construct interchange $4,610,000 61 40th Ave: construct roundabout $3,230,000 2 CSAH 13: construct roundabout $1,640,000 61 40th Ave: construct intersection improvements $2,230,000 61 Homestead Rd: construct J-turn $630,000 2 Grand Rapids to TH 63: 4-5 lane expansion $2,880,000 53 CSAH 16: construct J-turn $610,000 210 TH 169 to TH 65: reconstruction $12,040,000 53 TH 1: construct J-turn $670,000 169 TH 25: construct J-turn $580,000 2 TH 194: construct roundabout $2,830,000 53 Solway Rd: construct J-turn $560,000 53 CSAH 9: construct J-turn $620,000 169 CSAH 137: construct J-turn $860,000 61 McQuade Rd: construct J-turn $980,000 53 CSAH 15: construct J-turn $475,000 169 CSAH 7 to TH 65: construct safety improvements $5,490,000 33 CSAH 7: construct J-turn $510,000 53 Virginia to Intl Falls: construct passing lane $2,900,000 169 Construct safety improvements $5,490,000 61 Ryan Rd: construct J-turn $1,640,000 BRIDGES CITY/COUNTY BRIDGE NO. ROAD COST Aitkin 1503 CSAH 14 $500,000 Carlton 9502 CSAH 1 $1,048,482 Carlton 9503 CSAH 6 $805,000 Cass 7435 East Gull Lake $250,000 Chisago 13507 CR 56 $700,000 Cook 16509 CR 46 $700,000 Crow Wing 18514 CSAH 36 $600,000 Hubbard 29501 CSAH 16 $700,000 Itasca 88209 CR 238 $400,000 Koochiching 36512 CSAH 8 $660,000 Lake 38503 CSAH 9 $1,000,000 Morrison 49501 CSAH 1 $800,000 Pine 58508 CSAH 46 $600,000 MORE DISTRICT 8 URGENT NEEDS - PAGE 2 BRIDGES CONTINUED CITY/COUNTY BRIDGE NO. ROAD COST Pine 58512 CSAH 52 $1,200,000 St. Louis 7646 CSAH 5 $1,700,000 St. Louis 88773 CR 796 $1,000,000 St. Louis 3601 CSAH 61 $2,500,000 St. Louis LT10’ CR 535 $1,000,000 Wadena 80502 CSAH 1 $387,000 AVIATION City Airport Project Cost Brainerd Brainerd Lakes Regional Airport ARFF Building / Utility Construction $5,800,000 Brainerd Brainerd Lakes Regional Airport Taxiway D Engineering/Construction $4,850,000 Brainerd Brainerd Lakes Regional Airport Rwy / Twy Pvmt Rehab & Twy A LED Lights Const $5,500,000 Chisholm-Hibbing Range Regional Airport Runway 13/31 Rehabilitation $10,500,000 Duluth Duluth International Airport Taxiway A Eng/Const (West, Center, East) $16,825,000 Duluth Duluth International Airport Runway 3/21 Reconstruction $8,600,000 International Falls Falls International Airport Runway 13/31 Reconstruction $38,000,000 DRINKING WATER AND WASTEWATER SYSTEM NAME PROJECT DESCRIPTION COST Askov Treatment - New RO Addition for TOC $1,357,000 Rush City Treatment - Filter Media Upgrade $237,500 Tower Treatment - Plant Improvements $4,500,000 Cuyuna Source - Repl with Wells #2 & #3/Treat $459,300 Aurora Consolidation - E Mesabi Joint Water Sys $17,200,000 Wyoming Treatment - New Ra/Fe/Mn Plant $8,057,500 Clinton Source - New Well $196,250 Floodwood Watermain - Looping $727,300 Bigfork Source - New Well & Plant Rehab $129,489 Onamia Treatment - New Plant $3,080,000 Onamia Watermain - Looping $592,000 Clinton Treatment - Repl Fe/Mn Plant $1,690,000 Clinton Watermain - Looping $376,180 Pine City Watermain - Second River Crossing $306,800 Bowlus Source - Backup Well #3 $40,880 Sandstone Watermain - Looping to Hospital $700,000 Two Harbors Treatment - Repl Chlorine Contact Tank $2,800,000 Harris Watermain - Looping $364,320 Deerwood Storage - Replace w/100,000 Gal Tower $923,000 Cromwell Watermain - Repl TH 210/TH 73 $232,000 Menahga Storage - Repl w/100,000 Gal Tower $770,000 Menahga Watermain - Main Street East Repl $458,430 Menahga Watermain - First Street NW Repl $360,378 Ogilvie Watermain - Repl E. Rutherford/Hill Ave $675,000 Floodwood Watermain - 5th Ave Repl $338,375 Floodwood Watermain - Repl 4 Inch Mains $2,369,900 Isle Watermain - Replacement $2,469,800 Isle Source - Improvements $307,700 Isle Storage - Tower Rehab $294,500 Northome Watermain - Repl Northeast Watermain $1,483,250 MORE DISTRICT 8 URGENT NEEDS - PAGE 3 DRINKING WATER AND WASTEWATER CONTINUED SYSTEM NAME PROJECT DESCRIPTION COST Northome Storage - Replace w/50,000 Gallon Tower $942,500 Northome Conservation-Repl Meters, Service Lines $341,250 Aitkin Watermain - Repl 1st St NW, 7th Ave NW $1,005,869 Onamia Storage - Tower Rehab $340,000 Ironton Treatment - Replace Plant $2,694,700 Crosby Watermain - Phase 3 Improvements $3,670,000 Deerwood Watermain - Repl 4 inch Mains, Phase 3 $1,242,000 Brainerd Treatment - Backwash Recovery $3,907,000 Brainerd Storage - 2MG Ground Reservoir $3,459,000 Clinton Storage - Tower Rehab $235,600 Walker Watermain - Replace on North Side $1,006,574 Cuyuna Storage - Replace with New Tower $616,800 Cuyuna Watermain - Replace for City $1,273,155 Cuyuna Conservation - Replace Meters $55,650 Calumet Watermain - Alley Replacement $415,000 Calumet Watermain - Repl 6th Ave/Shipka St. $260,000 Bovey Watermain - Replace in Business Area $658,880 Cass Lake Watermain - Repl Various Areas $588,326 Wadena Watermain - Replace SW Portion of City $4,925,000 Moose Lake Source - Well #1 Rehab, New Well House $1,100,000 Sebeka Treatment - New Plant, Remove Iron $1,750,000 Sebeka Watermain - Replace, Phase 2 $975,000 Ely Watermain - Repl Various Areas $700,000 Ely Watermain - Raw Water Intake/WM Repl $2,645,000 Ely Watermain - Water Plant to Tower $270,000 Gilbert Rehab collection $2,203,700 Scanlon Rehab collection $276,988 Proctor Rehab collection $1,250,000 White Township Rehab collection - Gardendale $350,000 Ogilvie Adv trmt - phos/mercury, rehab treatment $3,718,000 Hoyt Lakes Adv trmt - mercury, rehab treatment $10,936,462 Little Falls Adv trmt - phos, rehab treatment $14,075,800 Wadena Rehab collection $732,400 Babbitt Adv trmt - mercury, rehab treatment $11,000,000 Eveleth Rehab collection, Garfield St $189,707 Blackduck Rehab collection and treatment $484,655 Buhl Rehab collection $2,131,000 Rush City Rehab collection $863,688 Iona Rehab collection $181,100 DAMS/PORTS SYSTEM NAME PROJECT DESCRIPTION COST Duluth Seaway Port Authority Clure Expansion Berth 11 Dock wall construction & Slip dredging $9,500,000 Duluth Seaway Port Authority Warehouse/Rail Facility on Clure Expansion (Berths 8-11) $8,000,000 Duluth Seaway Port Authority Replace Transit Shed Pedestrian & Overhead Doors $150,000 Duluth Seaway Port Authority Replace and Modernize Water System at Clure Terminal $5,000,000 Duluth Seaway Port Authority Stormwater Sewer/Management Upgrades $4,000,000 Duluth Seaway Port Authority Building 51 Expansion $2,200,000 Duluth Seaway Port Authority East Warehouse Annex Expansion $3,000,000 Duluth Seaway Port Authority Rice’s Point Expansion - several properties on Rice’s Point $4,500,000 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us