THE FUTURE of SASKTEL CENTRE Evolution of Sasktel Centre (Saskatchewan Place Association)

THE FUTURE of SASKTEL CENTRE Evolution of Sasktel Centre (Saskatchewan Place Association)

GROWING FORWARD: THE FUTURE OF SASKTEL CENTRE Evolution of SaskTel Centre (Saskatchewan Place Association) Cost: $26.1 million Opened: February 9, 1988 Capacity grown with community: • 1988: 7,800 • 1990: 11,330 • 2009: 15,100 Evolution of a City • Rating among top 100 arena concert venues in the world (Pollstar) • Made Saskatoon a destination for major events and tours Sports: • World Junior Hockey Championships (2); Memorial Cup (2) • Briers and Tournament of Hearts (5) • NHL Hockey (12) • Figure Skating, Rodeo, Volleyball, Basketball, Lacrosse Music and entertainment for all ages: • Elton John, Taylor Swift, Billy Joel, Katy Perry, The Eagles • Cirque du Soleil • Junos and Canadian Country Music Awards Evolving Market Environment • Katy Perry World Tour 2014 • 47 dates • Only four buildings older than SaskTel Centre • Of these four buildings all are either in the process of being replaced or renovated. • Second-smallest market-area population (272,000) Evolving Market Needs Major events and tours drawn to buildings with enhanced amenities Key Issues: • No Loading Dock for quickly loading shows in and out. • Roof and trusses are too low and inadequate for event rigging. • Kitchen and catering space is inadequate. • With additions in permanent seating, we have outgrown concourse space and concession service locations. • Limited public restrooms. • Lack of permanent artist dressing rooms. • Limited dressing rooms for national and international events. The Future of SaskTel Centre • SaskTel Centre is at a crossroads • An aging facility in an environment that is growing more competitive Comprehensive Maintenance Reserve • Well maintained throughout its history • Strategic expansions pushed facility to capacity limits • Maintenance Reserve planned for the following projects: • Roof replacement • Fixed seating replacement • Parking lot reconstruction and structural overlay • Ice slab replacement Comprehensive Maintenance Reserve Exploring Our Future • Need for market analysis to explore key questions: • What are our options to extend the life of the current facility? • Can SaskTel Centre remain competitive for the next 30 years? • What upgrades are necessary and what are the costs? • If a new venue is required, what role can a repurposed SaskTel Centre fill? • Should a new facility be recommended, the market analysis will address: • What locations should be considered? • What amenities would be required? • What are the costs? • What options are available to finance a new facility? .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us