5 Environmental and Social Impacts ______27 5.1 Introduction ______Error! Bookmark Not Defined

5 Environmental and Social Impacts ______27 5.1 Introduction ______Error! Bookmark Not Defined

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company EGAS ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FRAMEWORK Prepared by: Executive Summary Public Disclosure Authorized NATURAL GAS CONNECTION PROJECT IN 20 GOVERNORATES IN EGYPT (January 2017) Executive summary 1 List of acronyms and abbreviations AFD Agence Française de Développement (French Agency for Development) BUTAGASCO The Egyptian Company for LPG distribution CAPMAS Central Agency for Public Mobilization and Statistics EHDR Egyptian Human Development Report 2010 EEAA Egyptian Environmental Affairs Agency EGAS Egyptian Natural Gas Holding Company EGP Egyptian pound ESDV Emergency Shut Down Valve ESIAF Environmental and Social Impact Assessment Framework ESMMF Environmental and Social Management and Monitoring Framework ESMP Environmental and Social Management Plan FGD Focus Group Discussion GoE Government of Egypt HP High Pressure HSE Health Safety and Environment LDC Local Distribution Companies LPG Liquefied Petroleum Gas LP Low Pressure mBar milliBar NG Natural Gas NGO Non-Governmental Organizations PAP Project Affected Persons PRS Pressure Reduction Station QRA Quantitative Risk Assessment RAP Resettlement Action Plan RPF Resettlement Policy Framework SDO Social Development Officer SFD Social Fund for Development SSIAF Supplementary Social Impact Assessment Framework TOR Terms of Reference Town Gas The Egyptian Company for Natural Gas Distribution for Cities WB The World Bank US $ United States Dollars € Euros Exchange Rate: US$ = L.E 16 as of November 2016 Executive summary 1 Contents List of acronyms and abbreviations _________________________________ 1 List of Tables ___________________________________________________ 4 List of Figures __________________________________________________ 5 1 Introduction _________________________________________________ 5 1.1 Project Objectives ___________________________________________________________________ 8 1.2 Objectives of the ESIA Framework Study _________________________________________________ 9 2 Project Description ____________________________________________ 9 2.1 Background _________________________________________________________________________ 9 2.2 Coverage Framework ________________________________________________________________ 11 2.3 Project Components ________________________________________________________________ 12 2.3.1 Design and material take-off (MTO) including procurement _______________________________________ 12 2.3.2 Piping and connections ____________________________________________________________________ 12 2.3.3 Pressure Reduction Stations ________________________________________________________________ 12 2.4 Activities of the Construction Phase ____________________________________________________ 14 2.4.1 Mobilization of equipment, materials and workers ______________________________________________ 14 2.4.2 Excavation and pipe laying _________________________________________________________________ 14 2.4.3 Leakage testing __________________________________________________________________________ 14 2.4.4 Connections to households _________________________________________________________________ 14 2.4.5 Conversion of appliances ___________________________________________________________________ 14 2.4.6 Construction works for PRSs and regulators ____________________________________________________ 14 2.5 Activities of the operation phase ______________________________________________________ 14 2.5.1 Operation of the PRS ______________________________________________________________________ 14 2.5.2 Operation of the network __________________________________________________________________ 14 2.5.3 Repairs in households _____________________________________________________________________ 14 3 Legislative and Regulatory Framework __________________________ 15 3.1 Preface ___________________________________________________________________________ 15 3.2 ESIA NATIONAL ADMINISTRATIVE AND LEGAL FRAMEWORK _______________________________ 15 3.3 Applicable Environmental and Social Legislation in Egypt __________________________________ 16 3.3.1 Law 217/1980 for Natural Gas ______________________________________________________________ 16 3.3.2 Law 4/1994 for the Environment (amended by Law 9/2009) ______________________________________ 16 3.3.3 Law 38/1967 for General Cleanliness _________________________________________________________ 16 3.3.4 Law 93/1962 for Wastewater _______________________________________________________________ 16 3.3.5 Law 117/1983 for Protection of Antiquities ____________________________________________________ 16 3.3.6 Traffic planning and diversions ______________________________________________________________ 16 3.3.7 Work environment and operational health and safety ___________________________________________ 16 3.3.8 EEAA ESIA guidelines related to the Public Consultation __________________________________________ 16 3.3.9 Land Acquisition and Involuntary Resettlement _________________________________________________ 16 3.3.10 Relevant international treaties to which Egypt is a signatory ______________________________________ 16 3.4 Applicable World Bank Safeguard Policies_______________________________________________ 16 3.4.1 OP 4.01 – Environmental Assessment ________________________________________________________ 16 3.4.2 OP 4.11 – Physical Cultural Resources ________________________________________________________ 16 3.4.3 OP 4.12 – Involuntary Resettlement __________________________________________________________ 16 4 Description of the Environment ________________________________ 16 4.1 Introduction of the 11 governorates ___________________________________________________ 16 4.2 Selected background data ____________________________________________________________ 17 4.3 Basic Demographic Characteristics _____________________________________________________ 23 4.3.1 Population Characteristics __________________________________________________________________ 24 4.3.2 Living Conditions _________________________________________________________________________ 24 4.3.3 Access to Basic Services ____________________________________________________________________ 24 4.3.4 Human Development Profile ________________________________________________________________ 24 4.3.5 Poverty index ____________________________________________________________________________ 24 Executive Summary 2 4.3.6 Income and expenditure ___________________________________________________________________ 25 4.3.7 Fuel currently used in households ___________________________________________________________ 25 4.3.8 Problems faced with the current household fuel ________________________________________________ 25 4.3.9 Perception towards the project _____________________________________________________________ 25 4.3.10 Willingness to pay ________________________________________________________________________ 25 5 Environmental and Social Impacts ______________________________ 27 5.1 Introduction _________________________________________________ Error! Bookmark not defined. 5.2 Positive Impacts ____________________________________________________________________ 27 5.2.1 During the construction phase _______________________________________ Error! Bookmark not defined. 5.2.2 During the operation phase__________________________________________ Error! Bookmark not defined. 5.3 Potential Negative Impacts during Construction ____________________ Error! Bookmark not defined. 5.3.1 Reduction of Traffic Flow (disruption of local and regional traffic) ___________ Error! Bookmark not defined. 5.3.2 Air Emissions _____________________________________________________ Error! Bookmark not defined. 5.3.3 Noise ___________________________________________________________ Error! Bookmark not defined. 5.3.4 Risk on Infrastructure and underground utilities _________________________ Error! Bookmark not defined. 5.3.5 Possible effects on structures ________________________________________ Error! Bookmark not defined. 5.3.6 Effect on Culturally Valuable Sites ____________________________________ Error! Bookmark not defined. 5.3.7 Effect on ecological systems _________________________________________ Error! Bookmark not defined. 5.3.8 Solid and Liquid Waste Disposal ______________________________________ Error! Bookmark not defined. .Restoration _________________________________________ Error! Bookmark not defined (رد الشئ ﻷصله) 5.3.9 5.3.10 Potential Impacts of PRS Construction ________________________________________________________ 29 5.4 Potential Negative Impacts during Operation ____________________________________________ 30 5.4.1 User health and safety _____________________________________________________________________ 30 5.4.2 Improper handling of the Odorant ___________________________________________________________ 31 5.4.3 Noise of PRS _____________________________________________________________________________ 31 5.4.4 Safety Aspects of PRS Operation _____________________________________________________________ 31 5.4.5 Integrity of the pipelines ___________________________________________________________________ 31 5.4.6 Potential negative Socioeconomic impacts during operation ______________________________________ 31 6 Analysis of Alternatives _______________________________________ 33 6.1 No Project Alterative ________________________________________________________________ 33 6.2 Energy Alternatives

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    82 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us