FORM – 1 & 1A “Residential and Commercial Project” At Sr.no78, Near celestial city, Ravet-Aundh BRT Road, Ravet ,Pune By M/s. BVG Developers FORM –1 “Residential and Commercial Project” At Sr.no78, Near celestial city, Ravet-Aundh BRT Road, Ravet ,Pune By M/s. BVG Developers APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the project Residential and Commercial project 2. S. No. in the schedule 8a 3. Proposed capacity/area/length/tonnage Total Plot area- 20,800.00 m2 to be handled/command area/lease area/number of wells to be drilled 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. - 6. Category of project i.e.’ A’ or ‘B’ B2 7. Does it attract the general condition? Not Applicable If yes, please specify. 8. Location Latitude :- 18°39’21.07”N Longitude :- 73°44’27.00”E Plot/Survey/Khasra No. S. NO. 78 Village Ravet Tehsil Haveli District Pune State Maharashtra 9. Nearest railway station Nearest Airport - Pune Airport – 19.69 Km Nearest airport Nearest Railway Station Dehu Road Railway station-2.82 Km Dapodi Railway station -12.81 Km Pune Railway Station- 19.90 Km 10. Nearest Town, city, Pune District headquarters Along with distance in kms. 11. Village Panchayats, ZillaParishad, PCMC Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 12. Name of the applicant Mr. B.V.Gaikwad 13. Registered Address Shop No-D/14/B-5,B-Wing,Sant Tukaram vyapar Sankul,Nigdi,Pune-411044 Off No:020- 27658259 14. Address for correspondence Shop No-D/14/B-5,B-Wing,Sant Tukaram vyapar Sankul,Nigdi,Pune-411044 Off No:020- 27658259 Name Mr. Bibhishan V Gaikwad Sr. No. Item Details Mr. Balasaheb V Gaikwad Designation (Owner/Partner/CEO) Partner Address Shop No-D/14/B-5,B-Wing,Sant Tukaram vyapar Sankul,Nigdi,Pune-411044 Off No:020-27658259 Pin Code 411044 E-mail [email protected] Telephone No. 020-27658259 Fax No. --- 15. Details of Alternative Sites Not applicable examined, if any. Location of these sites should be shown on a topo- sheet. 16. Interlinked Projects Not Any 17. Whether separate application of Not Applicable interlinked project has been submitted? 18. If yes, date of submission NA 19. If no, reason NA 20. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to No be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 21. Whether there is any Government No Order/Policy relevant/ relating to the site? 22. Forest land involved (hectares) No 23. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities Sr. Information/Checklist Yes / /rates, wherever possible) with source of No. confirmation No information data 1.1 Permanent or temporary change in No -- land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, -- -- vegetation and building? 1.3 Creation of new land uses? Yes Commercial+ Residential+ MHADA 4 Nos. Residential Building 1 MHADA Building Shops : 8 Nos. Office : 56 no Nos. 1.4 Pre-construction investigation e.g. Yes Pre construction investigation will be carried bore holes, soil testing? out as per relevant standards. 1.5 Construction works? No -- 1.6 Demolition works? No -- 1.7 Temporary sites used for Yes Excavation in the form of rubble and soil. Part construction works or housing of of this soil and rubble will be used for back construction workers? filling and remaining material will be disposed by covered trucks to our proposed site. 1.8 Above ground building, structures No -- or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No --- mining or Tunneling? 1.10 Reclamation works? No. --- 1.11 Dredging? No. --- 1.12 Offshore structures? No. --- 1.13 Production and manufacturing No. --- processes? 1.14 Facilities for storage of goods or Yes During construction phase temporary storage materials? facilities will be created for the raw materials. 1.15 Facilities for treatment or disposal Yes Facilities will be provided for collection of solid waste or liquid effluents? treatment and disposal for solid and liquid waste 1.16 Facilities for long term housing of No --- operational workers? 1.17 New road, rail, or sea traffic No --- during construction or operation? Details thereof (with approximate quantities Sr. Information/Checklist Yes / /rates, wherever possible) with source of No. confirmation No information data 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission No --- lines or pipelines? 1.21 Impoundment, damming, No --- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No --- 1.23 Abstraction or transfers of water ----- --- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to land surface affecting drainage or development and runoff after development run-off? there is some increment in runoff of storm water which will be recharged. 1.25 Transport of personnel or Yes There will be transport of construction materials for construction, materials. It will be planned during non peak operation or decommissioning? hours 1.26 Long-term dismantling or No --- decommissioning or restoration works? 1.27 Ongoing activity during No --- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes There will be influx of 3400 residential either temporarily or & 776 commercial population permanently? 1.29 Introduction of alien species? No --- 1.30 Loss of native species or genetic No --- diversity? 1.31 Any other actions? No --- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/checklist Yes / Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially Total Plot area 20,800.00m2. Yes undeveloped or agricultural land (ha) 2.2 Water (expected Yes During construction: Potable water shall be supplied source & competing through tankers users) unit : KLD During Operation: Quantity of fresh water: 320 KLD 2.3 Minerals (MT) No --- 2.4 Construction material Yes List of raw materials used during construction phase is – stone, aggregates, referred as an Annexure II. and / soil (expected source – MT) 2.5 Forests and timber No -- (source – MT) 2.6 Energy including During Operation phase: Yes electricity and fuels Source: MSEDCL (source, competing As per Energy requirements users) Unit: fuel During Construction phase: (MT), energy (MW) As per Energy requirements 2.7 Any other natural No -- resources (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or No -- materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No -- disease or affect disease vectors (e.g. insect or water Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data borne diseases) 3.3 Affect the welfare of people No -- e.g. by changing living conditions? 3.4 Vulnerable groups of people No -- who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No --- 4. Production of solid wastes during construction or operation or decommissioning (MT/month): Details thereof (with approximate quantities / Sr. Information/Checklist Yes / rates, wherever possible) with source of No. confirmation No information data 4.1 Soil, overburden or mine No --- wastes 4.2 Municipal waste (domestic Yes Total solid waste Generation: 1724 kg/day and or commercial wastes) 4.3 Hazardous wastes (as per No Being a construction project, no Hazardous Waste is Hazardous waste expected. Management Rules) 4.4 Other industrial process No --- wastes 4.5 Surplus product No --- 4.6 Sewage sludge or other Yes Dried sludge from STP will be used as manure for sludge from effluent the plants after treating in Organic Waste converter. treatment. 4.7 Construction or demolition Yes Construction waste management plan will be wastes. prepared and executed during the project implementation stage. 4.8 Redundant machinery or No --- equipment. 4.9 Contaminated soils or other No --- materials. 4.10 Agriculture wastes. No --- 4.11 Other solid wastes. No --- 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) : Sr. Information/Checklist Yes / No Details thereof (with approximate quantities/rates, No. confirmation wherever possible) with source of information data 5.1 Emissions from Yes D.G. Sets as per CPCB norms will be used during combustion of fossil power failure.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages14 Page
-
File Size-