Presentation by Steve Metague, PGE.Pdf

Presentation by Steve Metague, PGE.Pdf

Steve Metague Sr. Director, Project Development Pacific Gas & Electric Co. 2012 National Electric Transmission Congestion Study Western Regional Workshop December 13, 2011 – Portland, Oregon California Transmission Planning Group (CTPG) • CTPG is a voluntary organization comprised of all the entities within California responsible for transmission planning: - California Independent System Operator (ISO) - Imperial Irrigation District (IID) - Los Angeles Department of Water and Power (LADWP) - Pacific Gas and Electric (PG&E) - Southern California Edison (SCE) - Southern California Public Power Authority (SCPPA) - San Diego Gas and Electric (SDG&E) - Sacramento Municipal Utility District (SMUD) - Transmission Agency of Northern California (TANC) - Turlock Irrigation District (TID) - Western Area Power Administration (Western) • CTPG’s role is to coordinate transmission planning studies and produce a statewide transmission plan in support of 33% RPS - CTPG does not have project approval authority • CTPG study process is open and transparent: - Assumptions, methods, and results are documented and publicly available (http://www.ctpg.us/public/index.php) 2010 CTPG Statewide Transmission Plan High and Medium Potential Transmission Upgrades and Corridors California Oregon Intertie – Path 66 Update • In 2010 and 2011 Pacific Intertie owners undertook a joint study to explore opportunities to: - Increase utilization of the existing AC Pacific Intertie - Expand the intertie by up to 2,000 MW using existing corridors. • Key Findings: - There is not space on the existing intertie to support firm delivery of new renewable PPA energy to California - The cost of a brown field expansion of the Intertie from Mid C to the greater S.F. Bay Area (approx. 700 miles) is $4 billion + - There does not appear to be sufficient commercial interest at this time to justify significant expansion of the Intertie • The California Oregon Intertie Utilization Report and the PNW-CA feasibility report can be found in the General Information folder at: http://www.oatioasis.com/wasn/index.html. Central California Transmission Study – Path 15 Update In September, 2011, PG&E submitted a request to the CAISO to evaluate the need to upgrade transmission between Midway and Tesla substations..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us