Iso/Fdis 18796-1

Iso/Fdis 18796-1

FINAL INTERNATIONAL ISO/FDIS DRAFT STANDARD 18796-1 ISO/TC 67 Secretariat: NEN Petroleum, petrochemicals and Voting begins on: natural gas industries — Internal 2018-07-12 coating and lining of carbon steel Voting terminates on: process vessels — 2018-09-06 Part 1: Technical requirements Industries du pétrole, de la pétrochimie et du gaz naturel — Revêtement de protection interne et doublure des récipients de production en acier au carbone — Partie 1: Exigences techniques RECIPIENTS OF THIS DRAFT ARE INVITED TO SUBMIT, WITH THEIR COMMENTS, NOTIFICATION OF ANY RELEVANT PATENT RIGHTS OF WHICH THEY ARE AWARE AND TO PROVIDE SUPPOR TING DOCUMENTATION. IN ADDITION TO THEIR EVALUATION AS Reference number BEING ACCEPTABLE FOR INDUSTRIAL, TECHNO- LOGICAL, COMMERCIAL AND USER PURPOSES, ISO/FDIS 18796-1:2018(E) DRAFT INTERNATIONAL STANDARDS MAY ON OCCASION HAVE TO BE CONSIDERED IN THE LIGHT OF THEIR POTENTIAL TO BECOME STAN- DARDS TO WHICH REFERENCE MAY BE MADE IN NATIONAL REGULATIONS. © ISO 2018 ISO/FDIS 18796-1:2018(E) COPYRIGHT PROTECTED DOCUMENT © ISO 2018 All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address belowCP 401or ISO’s • Ch. member de Blandonnet body in 8 the country of the requester. ISOCH-1214 copyright Vernier, office Geneva Phone: +41 22 749 01 11 Fax:Website: +41 22www.iso.org 749 09 47 PublishedEmail: [email protected] Switzerland ii © ISO 2018 – All rights reserved ISO/FDIS 18796-1:2018(E) Contents Page Foreword ..........................................................................................................................................................................................................................................v Introduction ................................................................................................................................................................................................................................vi 1 Scope ................................................................................................................................................................................................................................. 1 2 Normative references ...................................................................................................................................................................................... 1 3 Terms, definitions and abbreviated terms ................................................................................................................................ 3 ....................................................................................................................................................................... 3 3.2 Abbreviations ........................................................................................................................................................................................... 4 3.1 Terms and definitions 4 Conformance ............................................................................................................................................................................................................. 5 4.1 Rounding ...................................................................................................................................................................................................... 5 4.2 Conformance to this document ................................................................................................................................................. 5 5 Pre-work requirements ................................................................................................................................................................................ 6 5.1 General ........................................................................................................................................................................................................... 6 ............................................................................................................. 6 .................................................................................................................................. 6 5.2 Safety precautions in flammable atmosphere .................................................................................................. 6 5.35.5 SafetyIsolation precautions and ventilation in confined ................................................................................................................................................................. space 7 5.4 Safety precautions for blasting and coating works ................................................... 7 6 Coating/lining materials .............................................................................................................................................................................. 7 5.6 Qualification of coating/lining application and inspection personnel 6.1 General ........................................................................................................................................................................................................... 7 6.2 Approvals ..................................................................................................................................................................................................... 7 ....................................................................................................................................... 8 6.4 Pre-production trial (PPT) ............................................................................................................................................................ 8 6.3 Procedure qualification trial (PQT) ................................................................................................................................... 9 6.6 Holding (blast) primer ..................................................................................................................................................................... 9 6.5 Thickness classifications of ........................................................................................................................................................... coatings 9 ................................................................................................10 6.7 Coating and lining systems 7 Surface preparation .......................................................................................................................................................................................11 6.8 Material approvals — Coating and lining systems 7.1 General ........................................................................................................................................................................................................11 7.2 Preparations ...........................................................................................................................................................................................11 ....................12 ...............................................................................................................................................12 7.3 Patching, grinding, ................................................................................................................................................................................ degreasing and washing (for new and rehabilitation works) 13 7.47.6 DryAfter abrasive blast cleaning blasting........................................................................................................................................................................... cleaning 14 7.5 Humidity control 8 Coating/lining application ......................................................................................................................................................................14 ....................................................................................................................................................................14 8.2 Application of environmental conditions .....................................................................................................................15 8.18.3 GeneralPrimer application requirements ............................................................................................................................................................................15 .............................................................................................................................................................15 9 Coating/lining application ......................................................................................................................................................................16 8.4 Coating/lining thickness 10 Inspection and testing .................................................................................................................................................................................16 ....................................................................................................................................................................16

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    32 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us