AHMEDABAD PARLIAMNETARY CONSTITUENCY BROCHURE.Cdr

AHMEDABAD PARLIAMNETARY CONSTITUENCY BROCHURE.Cdr

C. ON GOING WORKS u Work commenced on the first ever Bullet train in India between Mumbai & Ahmedabad. u Vatva – Ahmedabad 3rd line with electrification & automatic signalling. u Ahmedabad – Mehsana Gauge Conversion with electrification u Ahmedabad – Botad Gauge Conversion u Provision of Solar Power System at Level Crossing gates u Provision of 2 escalators at Ahmedabad station – PF No. 4, 5 & 8/9 u Provision of 11 new lifts at Ahmedabad station u Improvement to platform surface of PF No.1 & 12 at Ahmedabad station. u Provision of various facilities for physically challenged persons at Maninagar station. Progressing Railways Progressing Gujarat Shri Narendra Modi, Hon'ble Prime Minister & Shri Shinzo Abe, Hon'ble Prime Minister of Japan at Ground Breaking Ceremony of Ahmedabad-Mumbai High Speed Rail Project Benches at Ahmedabad Station Car Loading facility at Detroj Divyangjan Friendly Ramps at Maninagar Drinking Water AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES DEVELOPMENTS BY RAILWAYS IN GUJARAT : 2014 – PRESENT AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES Developments by Railways INFRASTRUCTURE ENHANCEMENTS A. ASSEMBLY SEGMENTS Ongoing projects Dehgam, Gandhinagar South, Vatva, Nikol, Naroda, Thakkarbapa Nagar, Bapunagar, Asarwa, u New line projects of 500 kms at an approx. cost of Rs.4195 Cr. Danilimda, Amraiwadi, Ellisbridge, Dariapur, Jamalpur, Khadiya, Maninagar. u Gauge Conversion projects of 1533 kms at an approx. cost of Rs.10265 Cr. u Doubling projects of 1017 kms at an approx. cost of Rs.7122 Cr. B. WORKS COMPLETED IN LAST FOUR YEARS IMPROVING CONNECTIVITY FOR GUJARAT B1. Infrastructure Enhancement u Sabarmati – Khodiyar section (11 RKMs) commissioned. u 82 new trains introduced u Development of Sanand Private Freight Terminal. u 10 trains extended u 3704 special trains run B2. Improvement in Passenger Amenities u Mahamana, Antyodaya & Humsafar trains introduced u Development of circulating area at Saraspur end of Ahmedabad station. u Provision of 31 benches at Maninagar station. SAFETY A PRIORITY u Provision of 2 escalators at Ahmedabad station. u Free Wi-Fi facility at Ahmedabad station. u 43 Road Over Bridges constructed u Improvement to Dormitories at Ahmedabad station. u 238 Road Under Bridges/Limited High Subways constructed u Provision of full length loopline alongwith rail level platform to accommodate 24 u All Unmanned Level Crossings to be eliminated by March 2019 coaches at Chandlodiya. u Provision of 2 Passenger lifts at PF No.1 & 1 Passenger lift each at PF Nos.2/3, 4/5 & 6/7. BOOST TO PASSENGER AMENITIES u Providing FOB Bridge from PF No.1 to 4 for passengers at Vatva station. u u Upgradation of Waiting rooms/Retiring rooms Improvement to exterior of Broad Gauge and Metre Gauge Station Building at Ahmedabad station. u Fast & free Wi-fi at 35 stations u Coach Guidance System at 48 stations B3. Improvement in Train Services u Airport type trolleys at stations New Trains Introduced u Escalators and Lifts u 19421/22 Ahmedabad – Patna Express u 19401/02 Ahmedabad – Lucknow Express u 59550/59 Ahmedabad – Vadodara Sankalp Fast Passenger u 15560/59 Ahmedabad – Darbhanga Jansadharan Express u 19420/19 Ahmedabad – Chennai Express GUJARAT u 22920/19 Ahmedabad – Chennai Humsafar Express PARLIAMENTARY u 19415/16 Ahmedabad – Shri Mata Vaishnodevi Katra Express CONSTITUENCIES Ahmedabad (East & West) u 22497/98 Sriganganagar – Tiruchirappalli Humsafar Express u 17623/24 H. Sahib Nanded – Bikaner Jn Express u 22973/74 Gandhidham – Puri Express u 22939/40 Hapa – Bilaspur Express u 22936/35 Palitana – Bandra Terminus Express u 22992/91 Veraval – Bandra Terminus Superfast Express u 22990/89 Mahuva – Bandra Terminus Superfast Express u 22994/93 Mahuva – Bandra Terminus Superfast Express u 16587/88 Yeshvantpur – Bikaner Express u 22964/63 Bhavnagar Terminus – Bandra Terminus Superfast Express u 22937/38 Rajkot – Rewa Express u 19043/44 Bandra Terminus - Bhagat Ki Kothi Humsafar Express AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES DEVELOPMENTS BY RAILWAYS IN GUJARAT : 2014 – PRESENT AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES Developments by Railways INFRASTRUCTURE ENHANCEMENTS A. ASSEMBLY SEGMENTS Ongoing projects Dehgam, Gandhinagar South, Vatva, Nikol, Naroda, Thakkarbapa Nagar, Bapunagar, Asarwa, u New line projects of 500 kms at an approx. cost of Rs.4195 Cr. Danilimda, Amraiwadi, Ellisbridge, Dariapur, Jamalpur, Khadiya, Maninagar. u Gauge Conversion projects of 1533 kms at an approx. cost of Rs.10265 Cr. u Doubling projects of 1017 kms at an approx. cost of Rs.7122 Cr. B. WORKS COMPLETED IN LAST FOUR YEARS IMPROVING CONNECTIVITY FOR GUJARAT B1. Infrastructure Enhancement u Sabarmati – Khodiyar section (11 RKMs) commissioned. u 82 new trains introduced u Development of Sanand Private Freight Terminal. u 10 trains extended u 3704 special trains run B2. Improvement in Passenger Amenities u Mahamana, Antyodaya & Humsafar trains introduced u Development of circulating area at Saraspur end of Ahmedabad station. u Provision of 31 benches at Maninagar station. SAFETY A PRIORITY u Provision of 2 escalators at Ahmedabad station. u Free Wi-Fi facility at Ahmedabad station. u 43 Road Over Bridges constructed u Improvement to Dormitories at Ahmedabad station. u 238 Road Under Bridges/Limited High Subways constructed u Provision of full length loopline alongwith rail level platform to accommodate 24 u All Unmanned Level Crossings to be eliminated by March 2019 coaches at Chandlodiya. u Provision of 2 Passenger lifts at PF No.1 & 1 Passenger lift each at PF Nos.2/3, 4/5 & 6/7. BOOST TO PASSENGER AMENITIES u Providing FOB Bridge from PF No.1 to 4 for passengers at Vatva station. u u Upgradation of Waiting rooms/Retiring rooms Improvement to exterior of Broad Gauge and Metre Gauge Station Building at Ahmedabad station. u Fast & free Wi-fi at 35 stations u Coach Guidance System at 48 stations B3. Improvement in Train Services u Airport type trolleys at stations New Trains Introduced u Escalators and Lifts u 19421/22 Ahmedabad – Patna Express u 19401/02 Ahmedabad – Lucknow Express u 59550/59 Ahmedabad – Vadodara Sankalp Fast Passenger u 15560/59 Ahmedabad – Darbhanga Jansadharan Express u 19420/19 Ahmedabad – Chennai Express GUJARAT u 22920/19 Ahmedabad – Chennai Humsafar Express PARLIAMENTARY u 19415/16 Ahmedabad – Shri Mata Vaishnodevi Katra Express CONSTITUENCIES Ahmedabad (East & West) u 22497/98 Sriganganagar – Tiruchirappalli Humsafar Express u 17623/24 H. Sahib Nanded – Bikaner Jn Express u 22973/74 Gandhidham – Puri Express u 22939/40 Hapa – Bilaspur Express u 22936/35 Palitana – Bandra Terminus Express u 22992/91 Veraval – Bandra Terminus Superfast Express u 22990/89 Mahuva – Bandra Terminus Superfast Express u 22994/93 Mahuva – Bandra Terminus Superfast Express u 16587/88 Yeshvantpur – Bikaner Express u 22964/63 Bhavnagar Terminus – Bandra Terminus Superfast Express u 22937/38 Rajkot – Rewa Express u 19043/44 Bandra Terminus - Bhagat Ki Kothi Humsafar Express AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES C. ON GOING WORKS u Work commenced on the first ever Bullet train in India between Mumbai & Ahmedabad. u Vatva – Ahmedabad 3rd line with electrification & automatic signalling. u Ahmedabad – Mehsana Gauge Conversion with electrification u Ahmedabad – Botad Gauge Conversion u Provision of Solar Power System at Level Crossing gates u Provision of 2 escalators at Ahmedabad station – PF No. 4, 5 & 8/9 u Provision of 11 new lifts at Ahmedabad station u Improvement to platform surface of PF No.1 & 12 at Ahmedabad station. u Provision of various facilities for physically challenged persons at Maninagar station. Progressing Railways Progressing Gujarat Shri Narendra Modi, Hon'ble Prime Minister & Shri Shinzo Abe, Hon'ble Prime Minister of Japan at Ground Breaking Ceremony of Ahmedabad-Mumbai High Speed Rail Project Benches at Ahmedabad Station Car Loading facility at Detroj Divyangjan Friendly Ramps at Maninagar Drinking Water AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us