Minor Flood Mitigation Works & Coastal Protection Scheme Approved Projects 2016 Local Authority Project Project Approved Locations Details Funding Construction of chambers, installation of gates and non-return €49,500 Carlow Paupish Lane, valves (additional funding) Carlow County Council Associated works Installation of flood gates at key loc- ations, place new concrete floor & Tinnahinch Loch up stand wall in garage €17,280 Raise level by 350mm for a distance of 80m downstream of Graignaman- agh Bridge, provide demountable flood gate to isolate area from flood- ing from Mill Race, provide de- Tinnahinch Quay mountable flood gates to each of the €31,050 properties and provide 350mm up (additional funding) stand to existing wall along Mill Race for 20m Install flood gates at pedestrian, vehicular & field gate entrances and openings on opposite side of public Fonthill, road. Provide sump to facilitate over Ballinabrannagh pumping of surface waters & con- €14,760 struct buttress wall to rear of wall of property Construct reinforced concrete flood Cassidy's House, wall & provide demountable flood Gotham gates €6,030 Construct new wall on the car park €17,985 side of existing wall & carry out Kennedy Car Park works to include drainage and sumps Removal of trees Clare Reconstruction of embankment- set back from channel edge, graded at County Council Mountcatherine €49,500 approximately 1:3 on both sides and flat on top (width of 1.5 to 2m) Associated works Tree & shrub removal from Inchinossig Bridge to the Bunsheelin River, on Bunsheelin River from €22,500 Cork Ballingeary GAA pitch to confluence with the County Council River Lee & in an area known as “The Ford” Selectively clear bank side trees & Inchigeelagh shrubs Clear river bed material €22,500 Donegal Lower Mount Merrion, Clean open drain County Council Milford €1,800 Sloddan Port to Binbane Head (to include Pollan Strand, Coastal Erosion Risk Management €76,500 Ballyliffin & Five Fingers Study Strand) (coastal) Inver Installation of rock armour to protect €36,000 (coastal) the existing falling sea wall Coastal Flooding and Erosion Risk €76,500 Inishfree Bay Management Study (coastal) Installation of 60m rock armour along the Eany Water River bank to Ecclesiastical Graveyard, €13,500 protect the old graveyard and Inver, Glebe ecclesiastical remains Dunlaoghaire/ Loreto Park, Rathdown Install new screen to latest Nutgrove €31,500 County Council standards Study, upgrade of trash screen, ac- Johnstown / Granville Road cess road realignment & replace €30,000 section of boundary fence Galway Carry out drainage works upstream Deerpark, of the main Deerpark River channel County Council Ballinasloe €19,000 Purchase Temp Flood Defence- Aquadam to be deployed as Ballinasloe Town Centre required, to be available for Galway €96,849 County also Ardacong, Tuam Study €9,000 Construct a surface water pipe along the route of the Tuam bypass for a Ardacong, distance of 750m to a tributary of the €83,700 Tuam River Clare (allow in principle) Lakyle, Study Craughwell €9,000 Construct an earthen embankment- crest level is required to have a minimum of 500mm freeboard above the highest recorded flood level which occurred in 2015. A drainage system to cater for internal Blackrock, surface drainage will also be Gort €18,000 required. Relevant environmental criteria shall be complied with as the proposed works are adjacent to the Peterswell Turlough SAC Fahy's, Construct a 40m length of reinforced €5,400 Grannagh concrete retaining wall, 1.2m high around a section of the farmyard Construct a 140m length of stone faced concrete block retaining wall, Whyte's, €13,500 750mm high around a section of the Carrownamadra, property & to install a sump & road Kinvarra crossing. Beagh, To extend a 900mm diameter pipe Tuam across the N83 €14,220 To clean & maintain overgrown sections of the open channel, upsize 1 no. road crossing to a 900mm diameter pipe, install 100m of Parkacurry, 225mm diameter surface water Monivea drainage pipe & road gullies and €11,700 provide two new headwalls and trash screens to outfall to existing open channel Culvert upgrade, channel Roo, €76,500 improvements & environmental Kinvara reports. Dark Road, Castletaylor North, Study Ardrahan €9,000 To construct a reinforced concrete Kilcloghans, flood defence wall, a 600mm pipe Tuam and flap valve to be fitted to the outfall of the existing open land drain €19,845 to the Clare River To construct a 1.2m earthen embankment and install a flood gate Kilcreevanty, €14,400 barrier, along with construction of an Tuam internal collection sump and delivery pipeline with non-return valves Labane, Maintenance & improvements to €9,000 Gort existing swallow holes Kerry Raising of retaining wall, culvert Tullig, replacement at Tullig, storm water County Council €58,520 Castleisland drainage pipe at Kilbannivane & (additional funding) associated works Clieveragh, €22,495 Study Listowel Kilkenny Fanningstown & County Council Owning Study €9,000 Knockhouse to Portnascully via Dungooley Study €9,000 Leitrim Liscoghill, Clear obstructions up & downstream Drumkeeran of the bridge on the local road and €21,002 County Council the bridge on R200 (Dowra Road) Cut back trees that hang over the river Construction of land bank 300m x Mountcampbell 10m above summer level, will allow €47,700 river during winter to increase in width and reduce current winter levels Limerick City & Condell Road, Strengthening, widening & raising to €90,000 County Council Limerick City a level of 4.46 metres O.D. (Malin) 600 metres section of embankment To carry out an evaluation of current Ballinlonnig, pipe structure & remedial work to €36,000 Dromcollogher include increased capacity, if required Corbally Rebuild the embankment with rock €41,400 gabions & compacted clay €46,332 Longford Ballymulvey, Channel cleaning works (550m) Ballymahon County Council Fort William, Install a 600mm diameter pipe over Lanesboro a distance of 640 metres to drain the €54,000 area Tureen/ Clean land drains over 2kms and Lismacmaunus repair old/blocked stone culverts €21,600 Killeen, Replace culvert with 1.35mm Granard diameter pipe €18,800 Tomiskey Construct a 25m 1200mm diameter culvert €16,206 To repair the sea defence, including: Louth realignment and raising of a 21m County Council Baltray section of the existing promenade (coastal) wall re-point & fill low level voids on €54,000 seaward side to prevent further water ingress structural analysis of wall. Rampark, Construction of rock armour €14,400 Lordship revetment for 65m Mayo €9,000 Salmon Leap Cottage, Divert flood waters away from house County Council Belclare back into main channel To remove existing railing, construct €95,220 Crossmolina wall & flood barrier & associated Car Park works To remove existing shrubbery, €64,350 Crossmolina construct walls, supply & install flood Walkway gate & associated works €29,700 Crossmolina To repoint/repair existing stone wall Chapel Street Copper Beach, Raise embankment at site- 35m €5,490 Straide embankment 5600 high with slopes 1:1 Seasonmaster, 175m long raised embankment at €28,575 Straide site perimeter Raise road surface above adjacent watercourse Upgrade culverts at Racehill Lane, Huntsgrove, Brookville Rd & Hunter's Lane Utilise the existing diversion pipe but Ashbourne limit the flow to 1.2 m3/5 Remove or reconstruct bridge crossing on private land downstream Meath (Rathlodge; Racehill Lane; Huntsgrove; Brookville Road; of Racehill Lane County Council Hunter's Lane; Cedar Road & Increase size of open channel €450,000 Milltown Road) adjacent to 29 Huntsgrove Reinstatement of nos 28 and 29 Huntsgrove Increase size of open channel running from Brookville Rd to Hunter's lane Construct a shallow embankment adjacent to the Broadmeadow River on Milltown Rd (Miller's Cottage) Provide a new separate culvert to €61,200 cater for flood conditions Woodtown independent of the existing Road Drainage Monaghan Corleck / €15,000 Study County Council Annahaia Remove existing 600mm diameter pipe & replace with 900mm diameter pipe Drummillard/Lakeview, Supply & erect non-return valve & Castleblayney €37,530 chamber on network Upsizing of existing bridge crossing Donaghmoyne at Mannan Golf Club €85,500 Bunnoe River €40,500 Study Catchment Lower river channel & upsize two €21,600 Edengilrevy field access culverts To construct a clay embankment of approximate height of 1.0-1.2m around the perimeter of the Portavolla Estate to a total length of Offaly Portavolla Estate, approximately 470m. Scope of €153,000 County Council Banagher works also includes the diversion of an existing drain from the rear of the houses to outside of the new bund Facility to over pump during a flood event to be installed Replace culvert at Onagh & remove Roscommon growth from Killeglan Stream over County Council Killeglan Stream distance of 5kms €64,800 Beagh Brabazon, To install drain to divert surface Ballinasloe water to open drain €27,000 Works to raise the ground level and Fairhill, install piping Dysart €18,000 To install culvert drain & inspection Moneymore chamber €20,700 To install pipe Curnalee The pipe size to be a minimum of 900mm in diameter €18,000 Ogulla River To carry out maintenance on €54,000 channel, replace culverts & repair to existing weir structure Beagh Brabazon, To install 250m length of 900mm Ballinasloe twinwall HOPE drainage pipe with 4 manholes €36,000 To install pipe & construct 4 new manholes & a sluice valve Curnalee The pipe size to be a minimum of €1,800 900mm in diameter Install 160m of 600mm diameter
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-