2020 Budget Proposal

2020 Budget Proposal

JTTRI International Seminar on Railway Department of Transportation 12 February 2020 New World Makati Hotel 1 Rail Transportation in Comparable Cities: Massive Infrastructure Gap Tokyo Manila Seoul Shanghai Area Density City (sq. Population Km of rail Ridership (Pop/sq. km) km) Manila 620 12M 19,000 85 (+45) 1.3 M including PNR Tokyo 620 9M 14,000 700 30 M Shanghai 500 10M 20,000 590 (+100) 8.4 M (Metro) 2 Source: Metro Manila Rail Network Program Seoul 605 10M 16,000 390 (+100) 7.2 M (Metro) Optimal Funding Mix: Hybrid Funding Funding for projects can be done in any combination of the four. Land Value Capture Revenue can be made possible through one or many of the mechanisms previously outlined. Land Value Capture Government of the Private Sector Lending Partner/s Revenue Philippines and/or Local Government Units 3 Optimal Funding Mix: Hybrid Funding 4 How Do Mass Transit Investments Affect Land Values? Evidence from MRT-3 Abdul Abiad and Jill Adona Asian Development Bank September 2018 The views expressed are those of the authors and do not necessarily reflect the views and policies of the ADB, its Board of Governors, or the governments they represent. Land Value Uplift in the Philippines: Evidence from Manila’s MRT 3 Source: Abiad, A. (2019). Sustaining transit 6 investment in Asia's cities. Land Value Uplift in the Philippines: Evidence from Manila’s MRT 3 Evolution of Commercial and Residential Land Values within 1-km and 2-km the MRT 3 Station Source: Abiad, A. (2019). Sustaining transit 7 investment in Asia's cities. Land Value Uplift in the Philippines: Evidence from Manila’s MRT 3 Conclusions and Policy Implications MRT-3 caused residential and commercial land values within 1 km of stations to increase more than in other residential and commercial areas in Metro Manila—by PHP3,700-6,300 per sq. m. and PHP14,000-22,100 per sq. m., respectively About half of the incremental increase in land values due to MRT-3 occurred even before completion On aggregate, the incremental impact of MRT-3 on land values within 1 km of stations is close to PHP180 billion, or about US$3.4 billion Source: Abiad, A. (2018). Sustaining transit 8 investment in Asia's cities. Proposed TOD Concept of NSCR Calumpit Station (Preliminary) Land Use Image of TOD Area To the Old Town Commercial & Institutional Residential Green & Open Space Existing Hospital Station Plaza New Road Existing College 500m Residential Zone Source: N2SC JICA Design Team 9 Proposed TOD Concept of NSCR Calumpit Station (Preliminary) Basic Structure of TOD Area Symbolic Tree Zone Sports Complex Zone • Park Academic and Business Incubation Zone Zone Reservoir Complex Zone • Station Plaza; • Reservoir; • Commercial facilities; • Office; and, New Suburban Residential • Residential Units Zone • Residential Units 500m Cruise Port Source: N2SC JICA Design Team 10 Proposed TOD Concept of NSCR Calumpit Station (Preliminary) Image of TOD Area Source: N2SC JICA Design Team 11 Proposed TOD Concept of NSCR Angeles Station (Preliminary) Land Use Image 200m 500m Commercial (with greenery) Complex (Office+R&D+Data Center) Hotel tree Residential Green (Green Plaza + Green Space) Station Plaza (Bus Terminal main) Station Plaza & Angeles Feeder Complex Terminal WEST WING Green Loop (Phase 1) 15ha Future Development EAST WING (Phase 2) 13ha Source: N2SC JICA 12 Design Team Proposed TOD Concept of NSCR Calumpit Station (Preliminary) Image TOD Area Source: N2SC JICA Design Team Financing Scheme: Estimated Land Value Impact of the North-South Commuter Railway Project Source: 14 N2SC JICA Design Team Financing Scheme: Special Infrastructure Levy • Special Infrastructure Levy (SIL). The Local Government Code (R.A. 7160, Sec. 240) allows an LGU to impose a special levy on the lands benefited by public works projects or improvements funded by that LGU. • SIL Features • SIL shall not exceed 60% of total project cost, including land acquisition. • SIL shall be imposed through a Local Tax Ordinance. • SIL proceeds directly accrue to the general fund of the LGU. • SIL must be levied yearly (min: 5 years, max: 10 years). 15 Rail Investment and Transit Oriented Development 16 Source: GCR Consortium, TOD Inception Report. Project Timelines 17 NEDA / ICC CA: Concession Agreement NEDA Re-approval CD: Commencement Date FS: Feasibility Study F: Failed Rail Projects Timeline (1/6) DD: Detailed Design S: Signed P: Procurement IC: Independent Consultant R: ROW Site Acquisition GC: General Consultant SUMMARY C: Construction PO: Partial Operability O: Operations FO: Full Operations 2000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 FS DD PH-P255 S: Mar. LRT 1 Cavite GC P LRVs Depo Extension S: Dec. S: t Dec. S: Feb. (Pasay to CA C Cavite) S: Oct. Details R PO: Package 1 FO: Package 2&3 O 2007 FS DD 2007 2011 Common GC GC P DB Contractor DB Station S: S: Jul. F: Dec. and May Contractor Jan. (LRT 1, MRT 3, S: Feb. | CD: May MRT 7, MMSP) Details C PO: Area C (MRT 7) O NEDA / ICC CA: Concession Agreement NEDA Re-approval CD: Commencement Date FS: Feasibility Study F: Failed Rail Projects Timeline (2/6) DD: Detailed Design S: Signed P: Procurement IC: Independent Consultant R: ROW Site Acquisition GC: General Consultant SUMMARY C: Construction PO: Partial Operability O: Operations FO: Full Operations 2000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 FS DD PH-P255 LRT 2 East S: Mar. Extension (Santolan to GC GC Viaducts Stations E&M S: S: S: Mar. | CD: S: Dec. | CD: P S: Feb. | CD: Antipolo) Apr. Dec. Mar. Feb. Jul. Details CMX: E&M FKS: Viaducts and C O Stations Project on hold due to FS Proposed Privatization of LRT Line 2 GC GC F: Jul. and Oct. S and CD: P Aug. LRT 2 West DD Extension (Recto to Pier 4) C Details O NEDA / ICC CA: Concession Agreement NEDA Re-approval CD: Commencement Date FS: Feasibility Study F: Failed Rail Projects Timeline (3/6) DD: Detailed Design S: Signed P: Procurement IC: Independent Consultant R: ROW Site Acquisition GC: General Consultant SUMMARY C: Construction PO: Partial Operability O: Operations FO: Full Operations 2000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 1993 CP01 S: May | CD: Nov. FS CP02 S: Jan | CD: Jul. DD CP03 NSCR Phase 1 PH-P262 S: Jul. | CD: Aug. (Tutuban to S: Nov. GC S: P Malolos) Dec. R Details C PO FO O FS DD PH-P270 PHI-3796 NSCR S: Jan. S: Jul. Extension GC P (Malolos to S: Sept. Clark, Manila to R Calamba) C Details PO SC: 2Q 2025 PO FO N2: 1Q 2024, SC: 2026 O NEDA / ICC CA: Concession Agreement NEDA Re-approval CD: Commencement Date FS: Feasibility Study F: Failed Rail Projects Timeline (4/6) DD: Detailed Design S: Signed P: Procurement IC: Independent Consultant R: ROW Site Acquisition GC: General Consultant SUMMARY C: Construction PO: Partial Operability O: Operations FO: Full Operations 2000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 FS DD PBC 2019 No. 9 S: Aug. PNR South Long Haul / PM P C PNR Bicol S: Nov. (Manila to R Batangas / 2025 Sorsogon) C Details PO FO: 2025 O Pre-FS FS DD PH-P267 S: Mar. Metro Manila GC CP10 P Subway S: 1 Nov. Project S: Feb. R (Phase 1, Quezon City to PO Section Remaining Section Taguig) C Details PO FO: 2025 O NEDA / ICC CA: Concession Agreement NEDA Re-approval CD: Commencement Date FS: Feasibility Study F: Failed Rail Projects Timeline (5/6) DD: Detailed Design S: Signed P: Procurement IC: Independent Consultant R: ROW Site Acquisition GC: General Consultant SUMMARY C: Construction PO: Partial Operability O: Operations FO: Full Operations 2000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 PH-P269 S: Nov. FS P MRT 3 Sumitomo Corp. Handover Supervision Consultant Rehabilitatio S: Dec May Ongoing n Project Track Replacement Rehab. (26 months) Maint. (17 Details Started: Nov. Completion: Jul. months) Completion: Dec. Rehabilitation and Maintenance O FS P Subic-Clark Railway DD (Subic Bay R Freeport Zone, Clark Freeport) C Details O NEDA / ICC CA: Concession Agreement NEDA Re-approval CD: Commencement Date FS: Feasibility Study F: Failed Rail Projects Timeline (6/6) DD: Detailed Design S: Signed P: Procurement IC: Independent Consultant R: ROW Site Acquisition GC: General Consultant SUMMARY C: Construction PO: Partial Operability O: Operations FO: Full Operations 2000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ADB Prelim. (Arup) Detailed (PMC) Sept. May to Present Feb. to Jul. FS DD Mindanao P Railway Project Start: Dec. (Tagum-Davao- Digos) R C Details PO FO O P CPs Completion Period MRT 7 Submission CA Implementation CA (North EDSA to of S: 2008 Guidelines Effective Feb. Unsolicited S: Jul. Concession Period San Jose Del is 25 years. Proposal Monte, Bulacan) 2002 C Details DD PO FO R O Project Photos 24 PNR Clark Phase 1 (Malolos - Tutuban) Contract Package 01 Ongoing Construction of Batching Plant at CW 3 Ongoing Construction of Temporary Site Office at CW 3 Meycauayan Construction Yard Meycauayan Construction Yard (As of 31 January 2020) (As of 31 January 2020) PNR Clark Phase 1 (Malolos - Tutuban) Contract Package 01 Ongoing Embankment Works at Malanday Depot (As of 31 January 2020) PNR Clark Phase 1 (Malolos - Tutuban) Contract Package 02: Balagtas Transferring of 1st Precast Segment to PR 5- 114 to PR 5- 115 (As of 27 January 2020) PNR Clark Phase 1 (Malolos - Tutuban) Contract Package 02 Installation of Protection to Guiguinto Old Installation of Protection to Malolos Old Station (As of 23 January 2020) Station (As of 22 January 2020) LRT 1 Cavite Extension Project Construction Activities Precast Yard - 90% Complete PI Girder Molds was Delivered, Start of Assembly

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    45 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us