CHP As a Boiler Replacement At

CHP As a Boiler Replacement At

Andy Colwell AnnMarie Mountz Penn State is a World Class University with more than 50,000 students, faculty and staff on campus on any given day. As a provider of utilities, Steam Services plays an important supporting role in the success of the University’s mission of teaching, research and service. 3/19/10 2 • Buildings Served • +40 Operations and • +700 total Maintenance Staff • +200 served with steam Power Plants • +19 million ft2 18 Operators 8 daylight maintenance • +10 engineering and 6 Coal and Ash handlers technical support 2 supervisors Distribution 7 Daylight Maintenance 1 supervisor 2 Staff Assistants 4/30/2013 3/19/10 3 4/30/2013 3/19/10 4 Additional Steam Capacity • Steam demands began to exceed firm capacity Aging Infrastructure • Last steam capacity upgrade was 1971 Essential Services • Where/How to care for 10,000+ folks during a total loss of power to campus • Estimated we need 12 mW to do this 4/30/2013 3/19/10 5 4/30/2013 3/19/10 6 4/30/2013 3/19/10 7 exhaust Steam to campus 32 kpph un-fired 117,000 kpph fired RENTEC HRSG 900 oF Natural gas or oil Combustor 7mW SOLAR TAURUS 70 air 4/30/2013 3/19/10 8 Combustion Turbine $3.9 million HRSG $1.4 million Total Project $19 million 4/30/2013 3/19/10 9 Covers • Planned in-service and out-of-service maintenance • Service calls • Complete overhaul after 30,000 hours Costs • $21,000/month, $35 per hour • ~$600,000 per year 4/30/2013 10 3/19/10 Before ECSP Upgrades Electricity After ECSP CHP Prior to 2011 Generated After 2011 (kWh) Electricity 4% Generated (kWh) 21% Purchased Purchased Electricity Electricity (kWh) (kWh) 96% 79% WCSP Upgrades w/ CHP Electricity sometime after 2015 Generated (kWh) (CHP at WCSP) 33% Purchased Electricity (kWh) 67% 3/19/10 11 Before ECSP Upgrades After ECSP Upgrades prior to 2011 after 2011 Gas (mmBtu) 4% Gas (mmBtu) 23% Coal Coal (mmBtu) (mmBtu) 96% 77% Coal WCSP Upgrades, Phase 1 WCSP Upgrades, Phase 2 (mmBtu) 2014 After 2015 0% Coal (mmBtu) Gas 38% (mmBtu) Gas 62% (mmBtu) 100% 4/30/2013 3/19/10 12 Campus Improvements 4/30/2013 3/19/10 13 4/30/2013 3/19/10 14 Actual Consumption MMBTUs 3,500,000 3,000,000 2,500,000 OIL 2,000,000 NGAS COAL MMBtu 1,500,000 ELECTRIC 1,000,000 500,000 0 4/30/2013 3/19/10 15 600,000 Greener Grid (AEPS) Green Design Campus Sustainability 550,000 End Renewable Transportation \ Waste Initiatives Energy Credits Combustion Turbine \ Operational changes Purchase 2012 Goal - 17.5% Fuel Switch -Coal to Natural Gas Boiler MACT regulatory response 500,000 Energy Program $7-10M\yr - Energy Savings Projects 15 yr simple payback $1-1.5M\yr - Energy Conservation Measures mt CO2e / yr 450,000 & and Continuous Commisioning 5 yr simple payback $20M - 2nd Combustion Turbine 30% below 2005 baseline 400,000 35% below 2005 baseline 350,000 4/30/2013 3/19/10 16 Campus Improvements CO2 Reduction 250,000 200,000 150,000 100,000 50,000 - Prior to 2011 After 2011 Beginning 2014 After 2015 before ECSP Changes After ECSP CHP WCSP Ph 1 WCSP Ph2 4/30/2013 3/19/10 17 • Comply with Boiler MACT at WCSP • Investigate a 2nd CT/HRSG installed at WCSP 4/30/2013 3/19/10 18 4/30/2013 3/19/10 19 o exhaust 400 F 4 x 100 kpph Boiler 150-170 psig Fans Pumps Electric To Campus Generation To Campus 4/30/2013 3/19/10 20 WCSP Floor Plan after Boiler MACT New Natural Gas Boilers 4/30/2013 3/19/10 21 WCSP with CT/HRSG Future CT/HRSG 4/30/2013 3/19/10 22 Energy Funding – CT/HRSG • Could meet Energy Program requirements of 8 year payback • Could provide stability as Power Companies eliminate coal • PJM – 16,000 mW ~ 10% of load (retirement requests) • Campus could operate at reduced but functional load • Recent catastrophies • 2003 Cascading NE Grid Collapse • 2005 Hurricane Katrina • 2009 Kentucky Ice Storms • 2011 Tropical Storm Lee • 2012 Hurricane Sandy 4/30/2013 3/19/10 23 Energy Funding - Planned CT#1 CT#2 Cost $20M $20M Ngas/dth $13 $5 Elect/kWh $0.04 $0.08 Coal/ton $80 ($3.20 per mmBtu) $125 ($5 per mmBtu) Funding Essential Services - Aug 2003 Energy Funds Utilities - Boiler Replacement At the expense of building improvements 4/30/2013 3/19/10 24 Energy Funding - Planned $12 Support Sustainability & $10 Academics Utilities Projects $8 $6 Lighting $4 Major $2 Construction Energy Initiatives MILLIONS OF DOLLARS OF MILLIONS $0 Buidlings 2013/ 2014/ 2015/ 2016/ 2017/ (Includes H&F) 2014 2015 2016 2017 2018 4/30/2013 3/19/10 25 Energy Funding – CT/HRSG $12 CT/HRSG $10 Utilities - Ag $8 Digester $6 Lighting $4 Major $2 Construction Energy Initiatives MILLIONS OF DOLLARS OF MILLIONS $0 Buidlings 2013/ 2014/ 2015/ 2016/ 2017/ (Includes H&F) 2014 2015 2016 2017 2018 4/30/2013 3/19/10 26 600,000 Greener Grid (AEPS) Green Design Campus Sustainability 550,000 End Renewable Transportation \ Waste Initiatives Energy Credits Combustion Turbine \ Operational changes Purchase 2012 Goal - 17.5% Fuel Switch -Coal to Natural Gas Boiler MACT regulatory response 500,000 Energy Program $7-10M\yr - Energy Savings Projects 15 yr simple payback $1-1.5M\yr - Energy Conservation Measures mt CO2e / yr 450,000 & and Continuous Commisioning 5 yr simple payback $20M - 2nd Combustion Turbine 30% below 2005 baseline 400,000 35% below 2005 baseline 350,000 4/30/2013 3/19/10 27 4/30/2013 3/19/10 29 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    29 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us