0 0 71119124812171Authletter.Pdf

0 0 71119124812171Authletter.Pdf

GOVERNMENT OF ANDHRA PRADESH ABSTRACT PMGSY- Phase X – Roads – 266 works with an estimated cost of Rs.398.09 crore under PMGSY Phase X in 6 IAP Districts – Administrative Sanction - Orders - Issued. ------------------------------------------------------------------------------------------------------------- PANCHAYAT RAJ & RURAL DEVELOPMENT (PROGS.II) DEPARTMENT G.O.Ms.No.362 Dated: 09-11-2012. Read the following :- 1. Lr.No. P-17024/1/2012-RC, MoRD, GOI, Krishi Bhavan, New Delhi, dated: 01.08.2012. 2. Lr.No. P-17024/58/2011-RC, MoRD, GOI, Krishi Bhavan, New Delhi, dated 16-8-2012 and 17.09.2012. 3. From the ENC, PR, PMGSY, Lr.No. W27/DEE.III/PMGSY/786/Proposals /12, dt.13-9-2012 and 18-10-2012. <<>> O R D E R: In the reference 2 nd read above, the Ministry of Rural Development Government of India, have communicated the clearance of the project proposal as submitted by the State Government for Construction of 266 Road works with an Estimated cost of Rs.398.09 Crore measuring a length of 802.41 Km in 6 IAP Districts (Srikakulam, Vizianagaram, Visakhapatnam, East Godavari, Warangal and Adilabad) under Pradhan Mantri Gram Sadak Yojana (PMGSY) as these proposal was considered by the Empowered Committee in its meeting held on 26 th July, 2012. 2. In the reference 3 rd read above the ENC, PR, PMGSY while sending the Package-wise works and requested to accord Administrative Sanction for Rs.398.09 crore including the GOI share and State share. The details of the works are given below: Routine Construction Cost in Lakhs Maintenan No. of ce Cost @ Total State Sl. No. of Length in District Package 2.00 Share in Rs. No Works Kms State No. MORD share Total Lakhs per Lakhs share Km for 5 Years 12 34 6 7 8 9 10 11 1 Srikakulam 1 1 0.80 58.50 0.00 58.50 1.60 1.60 Vizianagara 2 20 17 70.17 3552.77 40.93 3593.70 140.33 181.26 m Visakhapatn 3 120 112 357.79 18206.90 137.22 18344.12 715.59 852.81 am East 4 10 9 39.65 1833.93 22.57 1856.50 79.30 101.87 Godavari 5 Warangal 40 32 100.34 4757.42 6.32 4763.74 200.67 206.99 6 Adilabad 75 71 233.66 11192.53 0.00 11192.53 467.32 467.32 Total 266 242 802.41 39602.05 207.04 39809.09 1604.81 1811.85 p.t.o. ::2:: 3. Government after careful examination of the proposal in the light of the clearance communicated by the GOI, Ministry of RD, in the reference 2nd read above, hereby accord Administrative Sanction in respect of 266 works as per the details mentioned in the above table under PMGSY, Phase X. The details of the works as appended to this order. 4. The Engineer-in-Chief, Panchayat Raj, PMGSY, Hyderabad is requested to take necessary action accordingly. 5. This order issues with the Concurrence of the Finance Department vide their U.O.No.8090/590/12/Expr.PR&RD, dated 06.11.2012. 6. A copy of this order is available on the internet and can be accessed at www.ap.gov.in/goir . (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) C.R.BISWAL PRINCIPAL SECRETARY TO GOVERNMENT To The Engineer-in-Chief, Panchayat Raj, PMGSY, Hyderabad Copy to: The Director (RC), Government of India, Ministry of Rural Development, Krishibhavan, New Delhi. The Accountant General, Andhra Pradesh,Hyderabad. The P.S to Minister ( Panchayat Raj &RWS) The P.S. to Principal Secretary (PR) The Finance (Expr. PR&RD) Department. Sc/Sf. //FORWARDED BY ORDER// SECTION OFFICER. NEW CONNECTIVITY PROPOSALS UNDER PMGSY X (IAP) ABSTRACT Construction Cost in Lakhs Routine No. of Maintenance Total State Sl. No. of Length District Package Cost @ 2.00 Share in Rs. No Works in Kms State No. MORD share Total Lakhs per Km Lakhs share for 5 Years 1 2 3 4 6 7 8 9 10 11 1 Srikakulam 1 1 0.80 58.50 0.00 58.50 1.60 1.60 2 Vizianagaram 20 17 70.17 3552.77 40.93 3593.70 140.33 181.26 3 Visakhapatnam 120 112 357.79 18206.90 137.22 18344.12 715.59 852.81 4 East Godavari 10 9 39.65 1833.93 22.57 1856.50 79.30 101.87 5 Warangal 40 32 100.34 4757.42 6.32 4763.74 200.67 206.99 6 Adilabad 75 71 233.66 11192.53 0.00 11192.53 467.32 467.32 Total 266 242 802.41 39602.05 207.04 39809.09 1604.81 1811.85 1 ANNEXURE TO G.O.Ms.No.362 OF PR and RD (PROGS.II) DEPARTMENT, DATED 09-11-2012 Rs.in Lakhs State:Andhra Pradesh Length in Km Sl. District Name of the Package No. Name of the Road Length Construction Cost in Lakhs Routine Total No Block / Mandal in Kms MORD State Total Maintenance State share share Cost @ 2.00 Share in 1 2 3 4 5 6 7 8 9 10 11 1 Srikakulam Palasa AP18XA 01 R/F R&B Road @ km 10/2 to 0.80 58.50 0.00 58.50 1.60 1.60 Gollamakanapalli Srikakulam 0.80 58.50 0.00 58.50 1.60 1.60 2 Vizianagaram G.L.Puram AP20XA 01 ER road to Rella 0.65 25.19 0.41 25.60 1.30 1.71 3 Vizianagaram G.L.Puram AP20XA 01 Muliguda road at 18/4Km to 0.67 26.11 0.39 26.50 1.33 1.72 Mulabinnidi Vizianagaram Package Total AP20XA 01 1.32 51.30 0.80 52.10 2.63 3.43 4 Vizianagaram Komarada AP20XA 02 Masimanda to Pedasakha 0.60 44.15 0.85 45.00 1.20 2.05 5 Vizianagaram Kurupam AP20XA 02 G.Sivada R&B road to Gujjuvai 0.60 30.14 0.36 30.50 1.20 1.56 Vizianagaram Package Total AP20XA 02 1.20 74.29 1.21 75.50 2.40 3.61 6 Vizianagaram Vepada AP20XA 03 Karakavalasa road to Marika 10.60 500.00 0.00 500.00 21.20 21.20 7 Vizianagaram Komarada AP20XA 04 Kemiseela to Gunadateelesu 2.90 224.03 6.97 231.00 5.80 12.77 8 Vizianagaram Parvathipuram AP20XA 05 Koraput R&B road to Chandalangi 2.50 186.90 3.10 190.00 5.00 8.10 9 Vizianagaram G.L.Puram AP20XA 06 Thadikonda road to Lappati 2.10 84.71 1.29 86.00 4.20 5.49 10 Vizianagaram G.L.Puram AP20XA 07 ER Road to Thota 11.15 518.58 6.42 525.00 22.30 28.72 11 Vizianagaram G.L.Puram AP20XA 08 Muliguda R&B Road @18/4 km to 2.30 127.23 2.27 129.50 4.60 6.87 Bathugudaba 12 Vizianagaram G.L.Puram AP20XA 09 Deruvada @ 7/0 km to Jarna 9.74 401.29 4.71 406.00 19.48 24.19 13 Vizianagaram Gurla AP20XA 10 Kondagandredu to Munakalapeta 2.45 133.10 0.00 133.10 4.90 4.90 14 Vizianagaram Bhogapuram AP20XA 11 Chittivalasa Jute mill to 0.87 34.00 0.00 34.00 1.74 1.74 Sreeramnagar colony 15 Vizianagaram Denkada AP20XA 11 Mukkam R&B road to Malapalli 1.20 45.00 0.00 45.00 2.40 2.40 Vizianagaram Package Total AP20XA 11 2.07 79.00 0.00 79.00 4.14 4.14 16 Vizianagaram Bondapalli AP20XA 12 MKPalem road to 6.18 308.50 0.00 308.50 12.36 12.36 Pathapanasalapadu 17 Vizianagaram Salur AP20XA 13 Thunda road to Chinavootagedda 1.70 88.86 1.14 90.00 3.40 4.54 18 Vizianagaram G.L.Puram AP20XA 14 Deruvada-Goipaka R&B road to 4.50 206.71 2.29 209.00 9.00 11.29 Babbidi 19 Vizianagaram Komarada AP20XA 15 Tulasivalasa to Sikhavaram (via) 4.40 290.49 6.51 297.00 8.80 15.31 Labesu 20 Vizianagaram Komarada AP20XA 16 Madalangi to Cheedipalli 0.80 74.25 1.75 76.00 1.60 3.35 SECTION OFFICER 2 ANNEXURE TO G.O.Ms.No.362 OF PR and RD (PROGS.II) DEPARTMENT, DATED 09-11-2012 Rs.in Lakhs State:Andhra Pradesh Length in Km Sl. District Name of the Package No. Name of the Road Length Construction Cost in Lakhs Routine Total No Block / Mandal in Kms MORD State Total Maintenance State share share Cost @ 2.00 Share in 1 2 3 4 5 6 7 8 9 10 11 21 Vizianagaram Kurupam AP20XA 17 R&B Road @ 2/0 km to 4.26 203.53 2.47 206.00 8.52 10.99 Chaparaiguda Vizianagaram 70.17 3552.77 40.93 3593.70 140.33 181.26 22 Visakhapatnam Munagapaka AP 19 XA 001 AKP-Parawada road at 6/0 to 3.50 148.00 0.00 148.00 7.00 7.00 Ramarayudupeta 23 Visakhapatnam Chodavaram AP 19 XA 002 CDM - Timmannapalem 6/0 Km to 0.90 49.90 0.00 49.90 1.80 1.80 J.Kothuru 24 Visakhapatnam Ravikamatham AP 19 XA 002 Marupaka to Rayavaram 0.84 47.50 0.00 47.50 1.68 1.68 Visakhapatnam Package Total AP 19 XA 002 1.74 97.40 0.00 97.40 3.48 3.48 25 Visakhapatnam Butchayyapeta AP 19 XA 003 BN road 77/0 to Kotha 4.20 205.00 0.00 205.00 8.40 8.40 kondempudi 26 Visakhapatnam Butchayyapeta AP 19 XA 004 K.B.Road to P.Bheemavaram 3.20 155.00 0.00 155.00 6.40 6.40 27 Visakhapatnam Ravikamatham AP 19 XA 005 BN Road to R.Kothuru 2.20 109.70 0.00 109.70 4.40 4.40 28 Visakhapatnam Rolugunta AP 19 XA 006 Komaravolu to Yerravaram 2.10 103.60 0.00 103.60 4.20 4.20 29 Visakhapatnam Rolugunta AP 19 XA 007 JP Agraharam to Kamudupalem 3.10 130.80 0.00 130.80 6.20 6.20 30 Visakhapatnam Kotauratla AP 19 XA 008 L.V.K.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us