CITY OF SOUTH GATE Gateway District FACT SHEET SPECIFIC PLAN Upcoming Opportunities for Community CITY OF SOUTH GATE Participation South Gate’s collaboration with business and residential communities is of paramount importance to the development of the Specific Plan. The City will host three community meetings between January and Fall 2016. 1 Community Meeting 1: Project Initiation Meeting Wednesday, January 27, 2016 Gateway The focus of the initial meeting is to increase project awareness, provide interested residents and business groups information about the Specific Plan’s purpose, study goals and timeline, and to gather feedback on the TOD vision for South Gate. 2 Community Workshop 2: Project Specific Workshop Spring/Summer 2016 The second meeting will be a workshop where the information gathered from the first meeting, as well District as technical work, will be shared. Participants will provide feedback and input on preliminary land use and design scenarios, including public access and open space. Information gathered from the SPECIFIC PLAN workshop will help define the Specific Plan’s goals and policies, and will be used to develop the Public Review Draft Specific Plan. Community Meeting 3: Public Review Draft Specific Plan 3 Summer/Fall 2016 The third meeting will provide the community an opportunity to review and comment on the Public Review Draft Specific Plan. Participants will have the chance to review key components of the Specific Plan, such as site design concepts, proposed land uses, pedestrian- and transit-oriented concepts, and strategies for public access and open space. Comments will be documented and be responded to in the Final Gateway Specific Plan. This meeting will also provide next step information for the public to consider, and information related to the public review process, including Planning Commission and City Council Hearings. For More Information Additional Information will be posted on the City’s website, Facebook page, and Twitter handle, and mailed to residents living near the project location. Please use the following contact tools to access more project information, ask questions, provide comments and to request to be added to the project database. AUTO SHOP Jerry C. Guevara, cityofsoutgate.org/gatewayplan BOUTIQUE RESTAURANT Assistant Planner City of South Gate 8650 California Avenue facebook.com/CityofSouthGate South Gate, CA 90280 @SouthGateCAgov [email protected] (323) 563-9514 @CityofSouthGateCA CITY OF SOUTH GATE Gateway District SPECIFIC PLAN City of South Gate Gateway District Project AreaFostoria Street Overview Salt Lake Avenue South Gate City Limit Goals of the Gateway District Specific Plan: In anticipation of the planned Eco-Rapid Transit South Gate Patata Street Wilcox Avenue Patata Street Design a transit-oriented center that allows for a mixed-use community and enhances the regional Station, the City of South Gate is preparing a Specific Plan transportation network. (Plan) for the Gateway District to establish a comprehensive vision for the future rail station area. The Plan is an Project Area Reisner Way Reduce carbon emissions and noise levels by providing services accessible by walking, biking, transit opportunity for the City to create a Transit Oriented and other forms of non-motorized transportation. Development (TOD) which is mixed-use, pedestrian- and Mason Street transit-focused. The Plan will define goals for a livable, Create a pedestrian and bicycle friendly environment to support the walkability and transit options Rayo Avenue vibrant, and pedestrian-friendly area, while accommodating Atlantic Avenue Firestone Place within South Gate. vehicular, truck, bus and light rail transit traffic on Firestone May Court Firestone Boulevard Incorporate cultural, public and green spaces for outdoor activities. Burke Avenue Los Angeles River Boulevard and Atlantic Avenue; one of the City’s busiest Burke Avenue Dudlext Avenue Dudlext Avenue Vossler Avenue intersections. Through design and policy, the Plan will make Vossler Avenue Plan a district that respects and represents the overall architectural character of the City. it possible to introduce housing, shopping, entertainment, Rayo Avenue jobs, civic areas, and open spaces planned around the South Southern Avenue Increase access to education and employment centers throughout the region Gate station. City of South Gate The South Gate Station will link the city of South Gate to other employment regions,Specic Plan forcommercial the Gateway District areas, and Eco-Rapid Transit residential neighborhoods along the Eco-Rapid Transit Corridor of which the southern portion, from Downtown CITY OF SOUTH GATE Los Angeles to the city of Artesia, is known as the West Santa Ana Branch Transit Corridor (WSAB). The Eco-Rapid TheG Eco-Rapidatewa Transity is a Joint Powers Authority (JPA) comprised of 13 members, representing 12 Southern Transit Corridor spans 40-miles from Bob Hope Airport to the city of Artesia and will grant South Gate residents, California cities, including South Gate and the Burbank-Glendale-Pasadena Airport Authority. The purpose of business owners and visitors alike, increased access to local and regional bicycle routes, multi-purpose trails and District the JPA is to pursue a high speed transit SPECIFIC PLAN nearby transportation corridors, including Amtrak, Metrolink and Metro’s Blue, Gold, Green, Red and Purple system that is environmentally friendly, Lines. West SantaWest Ana Santa Branch Ana TransitBranch Corridor Transit Corridor Study Area Study Area enhances transportation options for riders in the Southern California region and expands The Gateway District Specific Plan is being funded through a $200,000 Compass Blueprint Grant from Southern Los Angeles economic growth. California Association of Governments (SCAG). Little Tokyo Union Station The Eco-Rapid Transit system will link economic development and transportation Background Planning Efforts: 7th/Alameda via a 40-mile corridor from Bob Hope Airport Soto St. to the City of Artesia. The corridor is broken In 2013, the City of South Gate completed the Firestone and Atlantic Station Area Plan; a concept plan for the Pacic/Vernon up into two sections: 20-miles from Bob Leonis/District future station and the surrounding Gateway District. The City of South Gate has continued to team with Vernon Hope Airport to Downtown Los Angeles and OLDA/Eco-Rapid Transit Authority to continue to provide input into the WSAB development, including Pacic/Randolph Maywood 20 miles from Downtown Los Angeles to the refinements to the future South Gate station plan. Thus far, recommendations for this gateway to South Gate City of Artesia; the latter portion is known as Huntington have been shaped by community and stakeholder input as well as community engagement efforts of the 2009 Park Gage/Salt Lake Bell the West Santa AnaBranch or (WSAB). General Plan and 2015 Zoning Code Cudahy Transit via the WSAB will run through South update. This Specific Plan effort will Gate and connect 4 million residents to the build on prior collaboration to refine 2015-2016 South Gate 2011-2015 Firestone Blvd. Los Angeles regional transportation system. Gateway the framework and establish a final South Gate Comprehensive Downey District Specific Plan document. Code Update Gardendale St. Specific Plan I-105/Green Line 2009 2010 2011 2012 2013 2014 2015 2016 2017 Bellower Paramount/Rosecrans Paramount 2009-2012 2012-2013 2012-2015 Bellower Blvd. Cerritos West Santa Ana Branch Firestone Legend West Santa Ana Branch Artesia Alternatives Analysis and Atlantic WSAB Station Blue Line Station Area Design Gridley/183rd Station Southern Alignment Green Line Pioneer Blvd. Concepts Northern Alignment Red Line Area Plan East Bank Purple Line RESTAURANT West Bank, Option 3 Gold Line Miles Source: SCAG AA 0 2.5 5.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-