Staff Report: Regular Calendar

Staff Report: Regular Calendar

STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY GAVIN NEWSOM, GOVERNOR CALIFORNIA COASTAL COMMISSION SOUTH CENTRAL COAST DISTRICT OFFICE 89 SOUTH CALIFORNIA STREET, SUITE 200 VENTURA, CA 93001-2801 VOICE (805) 585-1800 FAX (805) 641-1732 F17b Filed 8/14/20 180th Day: 2/10/21 Staff: I. Qi-V Staff Report: 9/17/20 Hearing Date: 10/9/20 STAFF REPORT: REGULAR CALENDAR Application No.: 4-20-0391 Applicant: City of Carpinteria Project Location: Carpinteria City Beach, Carpinteria, Santa Barbara County. Project Description: Annual construction and removal of an approximately 1,375 ft. long, approximately 9.5 ft. high, winter sand berm involving approximately 20,000 cu. yds. of grading, including 10,000 cu. yds. of cut and 10,000 cu. yds. of fill. The proposed project includes construction of the berm prior to the winter storm season, maintenance of the berm during the winter, and removal of the berm in the spring. Staff Recommendation: Approval with conditions. SUMMARY OF STAFF RECOMMENDATION Staff recommends approval of the proposed development with seven (7) special conditions regarding (1) Timing of Construction, (2) Operational Responsibilities, (3) Sensitive Species Monitoring, (4) Assumption of Risk, Waiver of Liability, and Indemnity Agreement, (5) Permit Expiration, (6) Limitations on Construction Activities, and (7) Required Approvals. The applicant is proposing to construct an approximately 1,375 ft. long, approximately 9.5 ft. high sand berm at Carpinteria City Beach annually during the winter storm season. The berm is intended to protect existing beachfront development (including 4-20-0391 City of Carpinteria private residential development as well as public parking facilities and restroom facilities) adjacent to the project site from wave action damage during the winter storm season. Where existing beachfront development is in danger from erosion, as it is here, soft solutions such as beach berms generally have fewer significant environmental impacts than revetments, seawalls, or other similar structures. However, disturbance from construction, maintenance, and demolition of the berm on an annual basis could still result in potential adverse effects to the sensitive resources on site. Additionally, the proposed berm could have potential impacts to public access. The berm will be constructed in the fall each year after Labor Day but prior to the winter storm season, and then removed no later than Memorial Day of each spring to ensure public access is not restricted during peak beach usage dates, pursuant to Special Conditions One (1) and Two (2). During the time the berm is in place, portions of the berm will be slightly lowered to form ramps where the public can more easily traverse the berm in order to access the beach (at the street ends). The average beach goer will be able to access the water by climbing over the lowered ramps of the berm and the beach area will remain available for recreation. This project area does not contain any designated ESHA but there are nearby areas designated as ESHA and the project site contains potential habitat for Western Snowy Plover, Pismo Clams, Globose Dune Beetles, California Grunion, or other sensitive species. To ensure that sensitive species are not negatively impacted by berm construction, Special Condition Three (3), requires a biologist or resource specialist to monitor the site for the presence of sensitive species before, during, and after the time in which the berm is constructed, maintained, and removed. The Commission previously issued five Coastal Development Permits (CDPs), since 1995to the City of Carpinteria (City) for substantially the same project as is proposed by this application. These permits were subject to several special conditions, including a specific provision that limited the effective term of each permit to a five-year period, after which time any future sand berm construction activities would require a new permit from the Commission. CDP 4-14-1806 expired in May 2020; therefore, the City is proposing the subject permit application to continue the ongoing construction and demolition of the sand berm for an additional five-year period. Although the Commission has previously certified a Local Coastal Program (LCP) for the City of Carpinteria, the proposed project will be located within an area where the Commission has retained jurisdiction over the issuance of coastal development permits. Thus, the standard of review for this project is Chapter Three of the Coastal Act, with the applicable policies of the City of Carpinteria LCP serving as guidance. As conditioned, the proposed project is consistent with all applicable Chapter Three policies of the Coastal Act. Commission staff recommends that the Commission APPROVE coastal development permit application 4-20-0391, as conditioned. The motion and resolution to do so is on page 4. 2 4-20-0391 City of Carpinteria Table of Contents I. MOTION AND RESOLUTION ............................................................... 4 II. STANDARD CONDITIONS ................................................................... 4 III. SPECIAL CONDITIONS ....................................................................... 5 IV. FINDINGS AND DECLARATIONS........................................................ 7 A. Project Description .................................................................................................. 7 B. Background ............................................................................................................. 8 C. Hazards and Shoreline Processes .......................................................................... 9 D. Environmentally Sensitive Habitat and Marine Resources .................................... 12 E. Public Access and Visual Resources .................................................................... 16 F. California Environmental Quality Act ..................................................................... 17 APPENDIX A – SUBSTANTIVE FILE DOCUMENTS ............................... 19 EXHIBITS Exhibit 1 – Vicinity Map Exhibit 2 – Aerial Photograph Exhibit 3 – Berm Cross-Section Exhibit 4 – Public Access Points 3 4-20-0391 City of Carpinteria I. MOTION AND RESOLUTION Motion: I move that the Commission approve Coastal Development Permit No. 4-20-0391 pursuant to the staff recommendation. Staff Recommendation of Approval: Staff recommends a YES vote. Passage of this motion will result in approval of the permit as conditioned and adoption of the following resolution and findings. The motion passes only by affirmative vote of a majority of the Commissioners present. Resolution to Approve the Permit: The Commission hereby approves a coastal development permit for the proposed development and adopts the findings set forth below on grounds that the development as conditioned will be in conformity with the policies of Chapter 3 of the Coastal Act. Approval of the permit complies with the California Environmental Quality Act because either 1) feasible mitigation measures and/or alternatives have been incorporated to substantially lessen any significant adverse effects of the development on the environment, or 2) there are no further feasible mitigation measures or alternatives that would substantially lessen any significant adverse impacts of the development on the environment. II. STANDARD CONDITIONS 1. Notice of Receipt and Acknowledgment. The permit is not valid and development shall not commence until a copy of the permit, signed by the applicant or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date on which the Commission voted on the application. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Interpretation. Any questions of intent of interpretation of any condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the applicant to bind 4 4-20-0391 City of Carpinteria all future owners and possessors of the subject property to the terms and conditions. III. SPECIAL CONDITIONS 1. Timing of Construction. All project operations, including, but not limited to, construction, demolition, operation of equipment, sand excavation and placement, or other construction, maintenance, material removal, or activities involving mechanized equipment, shall be prohibited on any part of the beach in the project area from Memorial Day in May through Labor Day in September of each year, to avoid impacts on public recreational use of the beach, unless additional time is allowed by the Executive Director for good reason. 2. Operational Responsibilities. It shall be the applicant’s responsibility to assure that the following occurs during project operations: a. The sand berm shall be constructed in accordance with the approved project plans, subject to the timing restrictions specified in Special Condition One (1) above. b. The sand berm shall be removed (lowered) to pre-existing beach contours to restore the shoreline and to facilitate recreational

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us