Bhumikasthanmun.Pdf

Bhumikasthanmun.Pdf

भुमिकाथान नगरपामऱका, अघााखा更ची प्रदेश ५ कू ऱ ऱागतिा कू ऱ ऱागतिा प्रिरोकाको प्राथमिकता टोऱ वती आयोजना नाि र ढा更चा श्रिको ऱागत प्रिरोकाको ऱागतिा कू ऱ अ敍क क्रि प्रततशत ऱागत प्रततशत श्रिको प्रततशत giddhegauda samnegaun magar samne ghayu harite sadak 1 giddhegauda samnegaun nirman yojana 94% 100% 94% 81.52 2 thakurabase kapini, gahate thakurabase kapini gatate chesakhota krise sadaka niraman 94% 100% 94% 79.56 3 fulbari gahate pipalnate gitakhola Fulbari Gahate Pipalneta Githakhola road Pakki Nali Construction 70% 100% 70% 76.50 bhagini githakhola ,dharimbhot bhagini dhudha sichaye ,githakhola, dharimbhot ,nuhara,khola 4 ,renggeng nirman 70% 100% 70% 75.54 5 bhu. na.pa. 2 dhakawang goreto bato mirman 94% 100% 94% 72.66 6 Siddhagufa masinalekh Siddhargufa Masinalekh foot trail and park construction 70% 100% 70% 69.60 7 bhumikasthan ward no 1 Different Community Forest lemon plantation 70% 100% 70% 69.58 Gauchaur daha deupuje pokhari conservation and harrachaur 8 Gauchaur deupuje dalit basti water supply tank construction 0.7 1 70% 68.62 lebasa,panchese,khadkara,jabuna,chhatra shechaye kulo 9 bhu. na.pa. 2 dhakawang ,lemase nirman 70% 100% 70% 67.70 10 pokhara Pokharaka Pokhara Park and pokhari construction 0.7 1 70% 67.64 Gachchhe Dhikura Dhanchaur Moterable Road drain 11 Dhikura construction works 0.7 1 70% 65.72 12 Pokhedanda Pokhedanda Park Purbadhar Nirman and Toilet construction 70% 100% 70% 64.68 Dudaka mukha Myalbot chamre aapaka rukh domai kulo nirman 13 Bhu.Na.Pa-4, Dharapani,Domai yojana 70% 100% 70% 63.77 14 Deva Kol gaira Jaldibir Bir bhadra khel maidan construction 0.7 1 70% 63.74 15 Deva Padmawati aa. vi field and compound wall construction 0.7 1 70% 62.75 16 argha Charchare Water Supply Scheme Maintenance 70% 100% 70% 60.79 17 bhu .na.pa.2 pyariphokara pyariphokara khalmaidhan yojana 94% 100% 94% 58.95 18 Pokhedand Lamchi Pokhedanda Lamchi Moterable Road drain and Gabion box filling 70% 100% 70% 58.85 19 bhu.na.pa.2 dhawachaur ,tallathan Different phokari nirman 70% 100% 70% 58.81 Shanti Ma. Vi Khel maidan construction (Gabion box filling and 20 Khilji Belbot compound extend) 70% 100% 70% 56.87 Bhu.Na.Pa-4, Dharapani, 21 makaidanda Swamika rukh makai danda park nirman yojana 70% 100% 70% 56.83 Scheme A Jukena muhan dekhi dharapani mul tanki RVT 22 Bhu.Na.Pa-4, Dharapani Maintenance 70% 100% 70% 54.89 23 Khilji Durbang Durbang Paryatakiya Sthal Purbadhar nirman 70% 100% 70% 52.91 bhu. na.pa. 2 dhakawang 24 bajephokari,bhagmara Different chaupari nirman 70% 100% 70% 51.93 25 Khilji Dandagaon Dandagaoun Ghumti Durbang drainage construction 70% 100% 70% 51.03 कू ऱ ऱागतिा कू ऱ ऱागतिा प्रिरोकाको प्राथमिकता टोऱ वती आयोजना नाि र ढा更चा श्रिको ऱागत प्रिरोकाको ऱागतिा कू ऱ अ敍क क्रि प्रततशत ऱागत प्रततशत श्रिको प्रततशत 26 Bhu.Na.Pa-4, Dharapani Foharmaila management works (Burning Chamber) 70% 100% 70% 50.01 27 Uprikot Nuwakot Health post field construction and Gabion box filling 70% 100% 70% 49.97 Nuwakot -7 barahaneta pandanda 28 jalam Hulak Chidichaur Nuwakot Barahaneta 94% 100% 94% 49.17 29 Dhanchaur Shengleng Shengleng daha conservation and purbadhar construction works 0.7 1 70% 48.99 30 Bhu.Na.Pa-5, Asurkot Different Irrigation canal maintenance 70% 100% 70% 48.09 31 Nuwakot -7 Salendhara Jalam Ghorakhori Sallendhara Jhimruk Mo ba nirman 94% 100% 94% 47.21 32 Dhanchaur Shengleng Budhidamar Picnic spot and toilet construction works 0.7 1 70% 46.05 33 Shengleng Todke Shengleng Tourism Moterable road drain construction 0.7 1 70% 45.13 34 Khilji Neta Neta Khelmaidan construction 70% 100% 70% 45.11 35 bhu.na.pa.2 bhumikathan,chisara Different paratichalaya nirman 70% 100% 70% 45.07 36 Nuwakot Different Community Forest lemon plantation 70% 100% 70% 41.15 37 Bhu.Na.Pa-5, Asurkot udayathanti Jana priya ma vi adhuro building construction 70% 100% 70% 40.25 38 Bhu.Na.Pa-5, Asurkot Baikunthaghat Baikunthaghat Picnic spot asurkot durbang 70% 100% 70% 39.19 Bhu.Na.Pa-5, Asurkot Pauwa Pauwa chiurika rukh bhatti sidd danda ringroad drain 39 Chiurika rukh construction 70% 100% 70% 37.30 40 Arichaur Tallo Aarichaur Tourism Gate and park construction works 0.7 1 70% 37.23 41 Pandada Bhagawati Ma.Vi and Jana jagriti aa. vi compound and purbadhar 70% 100% 70% 35.26 Beltari sikhra asare sindure khirrabot baguwa irrigation canal 42 Nuwakot - pandanda dhagadi maintenance 70% 100% 70% 34.36 43 Bhu.Na.Pa-3, Dharapani, Thulakhara Shree Siddhartha Aa.Vi. Compund wall Gate Carry Nirman 70% 100% 70% 34.28 Bhu.Na.Pa-3, 44 Dharapani,Myalpokhari Annapurna Ma Vi Khel maidan Construction 94% 100% 94% 32.48 Shree Sankher Jana Sewa Aa.Vi. Compund wall Gate Carry 45 Bhu.Na.Pa-3, Dharapani, Thulakhara Nirman 70% 100% 70% 32.32 Tharpaela kataledhunga madre odhar devisthan foot trail 46 Bhu.Na.Pa-3, Dharapani,Tharpaela construction 94% 100% 94% 31.46 47 Maulipokhara Maulipokhara Park Nirman and Plantation 70% 100% 70% 31.34 48 Bhu.Na.Pa-3, Dharapani Sarsafai purbhadar nirman yojana 70% 100% 70% 30.40 49 Bhu.Na.Pa-3, Dharapani, Thanti Ward office dekhi devisthan hadkhor chaur steps construction 70% 100% 70% 30.38 Bhu.Na.Pa-3, 50 Dharapani,Myalpokhari Sarsafai purbhadar nirman yojana 70% 100% 70% 28.44 Bhu.Na.Pa-3, 51 Dharapani,Myalpokhari 20 cum Reservoir Tank Construction works 70% 100% 70% 27.42.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us