Shahezan Issani Report Environment and Social Impact Assessment for Road Asset 2020-03-02

Shahezan Issani Report Environment and Social Impact Assessment for Road Asset 2020-03-02

Draft Initial Environmental Examination Project Number: 53376-001 September 2020 IND: DBL Highway Project Prepared by AECOM India Private Limited The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. FINAL ESIA Environment and Social Impact Assessment (ESIA) of Road Asset Anandapuram-Pendurthi-Anakapalli Section of NH-16 Dilip Buildcon Limited September 19, 2020 Environment and Social Impact Assessment of Road Asset – Anandapuram – Pendurthi – Ankapalli Section of NH 16, India FINAL Quality information Prepared by Checked by Verified by Approved by Shahezan Issani Bhupesh Mohapatra Bhupesh Mohapatra Chetan Zaveri Amruta Dhamorikar Deepti Bapat Revision History Revision Revision date Details Authorized Name Position 01 23 April 2020 First cut ESIA report without Yes Chetan Zaveri Executive Director monitoring data 02 30 April 2020 Draft ESIA report without monitoring Yes Chetan Zaveri Executive Director data 03 9 July 2020 Final ESIA report with monitoring Yes Chetan Zaveri Executive Director data and air modelling 04 12 Aug 2020 Final ESIA report with monitoring Yes Chetan Zaveri Executive Director data and air modelling and updated social data and addressed ADB comments 05 18 Sep 2020 Final ESIA report with ADB Yes Chetan Zaveri Executive Director comments on ecology and noise aspects Distribution List # Hard Copies PDF Required Association / Company Name N Y DBL Prepared for: Dilip Buildcon Limited AECOM Environment and Social Impact Assessment of Road Asset – Anandapuram – Pendurthi – Ankapalli Section of NH 16, India FINAL Prepared for: Dilip Buildcon Limited Prepared by: AECOM India Private Limited 19th Floor Building No.5 Tower C Cyber City Gurgaon 122002 Haryana India CIN: U74210KA2005PTC037770 T: +91 124 4682700/800 aecom.com © April 15th, 2020 AECOM India Private Limited. All Rights Reserved. This document has been prepared by AECOM India Private Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared for: Dilip Buildcon Limited AECOM Environment and Social Impact Assessment of Road Asset – Anandapuram – Pendurthi – Ankapalli Section of NH 16, India FINAL Table of Contents List of Abbreviations ................................................................................................................................................ 9 Executive Summary .............................................................................................................................................. 11 1. Introduction ................................................................................................................................................ 17 1.1 Project Background ........................................................................................................................ 17 1.2 Purpose and Scope of Work ........................................................................................................... 17 1.3 Approach and Methodology ............................................................................................................ 18 1.3.1 Delineation of the Study Area/Area of Influence ............................................................................. 18 1.3.2 Desktop Review .............................................................................................................................. 19 1.3.3 Environment Due Diligence ............................................................................................................ 19 1.3.4 Site Survey ..................................................................................................................................... 20 1.3.5 Environmental Baseline Data Collection ......................................................................................... 20 1.3.6 Impact Assessment......................................................................................................................... 20 1.3.7 Environmental and Social Management Plan ................................................................................. 20 1.3.8 Agencies contacted ........................................................................................................................ 20 1.4 Limitations ...................................................................................................................................... 21 1.5 Layout of Report ............................................................................................................................. 21 2. Project Description ..................................................................................................................................... 22 2.1 Project Location and Site Setting .................................................................................................... 22 2.2 Project Overview ............................................................................................................................ 24 2.2.1 Project Components ....................................................................................................................... 24 2.2.2 Ancillary Project Operations to support Road Construction ............................................................ 24 2.2.2.1 Marturu Quarry Operations ............................................................................................................. 26 2.2.2.2 Vavilapadu Quarry Operations ........................................................................................................ 27 2.3 Current Status of the Project .......................................................................................................... 28 2.4 Resource Requirement and Procurement ...................................................................................... 29 2.4.1 Land Procurement Status ............................................................................................................... 29 2.4.2 Manpower requirement ................................................................................................................... 29 2.4.3 Water Requirement ......................................................................................................................... 30 2.4.4 Implementation Schedule ............................................................................................................... 30 3. Environment and Social Regulatory Framework ........................................................................................ 31 3.1 Applicable Reference Framework ................................................................................................... 31 3.2 National and Regional Enforcement Authorities ............................................................................. 31 3.3 Policy Framework in India ............................................................................................................... 37 3.3.1 EIA Notification 2006 ...................................................................................................................... 37 3.3.2 NH Act 1956 for Project Land Acquisition Process ......................................................................... 37 3.3.3 Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement (LARR) Act 2013- Evaluation of Compensation .............................................................................. 37 3.4 Applicable International Standards and Guidelines ........................................................................ 38 3.4.1 ADB Safeguard Policy Statement, 2009 ......................................................................................... 38 3.4.1.1 ADB Prohibited Investment Activities List ....................................................................................... 39 3.4.2 ADB Policies ................................................................................................................................... 39 3.4.2.1 Public Communications Policy (2011) ............................................................................................. 39 3.4.2.2 Social Protection Strategy 2001 ..................................................................................................... 40 3.4.2.3 Operations Manual (OM) C3 Sector and Thematic Policies on Incorporation of Social Dimensions 2011 ................................................................................................................................................ 40 3.4.2.4 Gender Mainstreaming Guidelines 2012 .......................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    192 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us